HomeMy WebLinkAboutWAR314062-2024-12-12-coverageletter
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
PO Box 47600, Olympia, WA 98504-7600 • 360-407-6000
December 12, 2024
Rick Capka
Sound Transit
401 S Jackson St
Seattle, WA 98104
RE: Coverage under the Construction Stormwater General Permit (CSWGP)
Permit number: WAR314062
Site Name: Renton Transit Center
Location: 15171 NE 24TH ST
Redmond County: King
Disturbed Acres: 2.96
Dear Rick Capka:
The Washington State Department of Ecology (Ecology) received your Notice of Intent for
coverage under Ecology’s Construction Stormwater General Permit (CSWGP). This is your
permit coverage letter. Your permit coverage is effective December 12, 2024.
Retain this letter as an official record of permit coverage for your site. You may keep your
records in electronic format if you can easily access them from your construction site. You can
get the CSWGP, permit forms, and other information at Ecology’s CSWGP eCoverage Packet
webpage1. Contact your Permit Administrator, listed below, if you want a copy of the CSWGP
mailed to you. Please read the permit and contact Ecology if you have any questions.
Additional Monitoring
Please refer to the attached Administrative Order, number 23371, for additional monitoring
requirements.
Electronic Discharge Monitoring Reports (WQWebDMR)
This permit requires you to submit monthly discharge monitoring reports (DMRs) for the full
duration of permit coverage (from first full month of coverage to termination). Your first
sampling and reporting period will be for the month of January, 2025 and your first DMR must
be submitted by February 15, 2025. You must submit DMRs electronically using Ecology’s
secure online system, WQWebDMR. To sign up for WQWebDMR go to Ecology’s
1 http://www.ecology.wa.gov/eCoverage-packet
Rick Capka
December 12, 2024
Page 2
WQWebPortal guidance webpage2. If you have questions, contact the portal staff at (360) 407-
7097 (Olympia area), or (800) 633-6193/option 3, or email WQWebPortal@ecy.wa.gov.
Appeal Process
You have a right to appeal coverage under the general permit to the Pollution Control Hearing
Board (PCHB). Appeals must be filed within 30 days of the date of receipt of this letter. Any
appeal is limited to the general permit’s applicability or non-applicability to a specific
discharger. The appeal process is governed by chapter 43.21B RCW and chapter 371-08 WAC.
“Date of receipt” is defined in RCW 43.21B.001(2). For more information regarding your right to
appeal, please reference Ecology’s Focus Sheet: Appeal of General Permit Coverage3.
Annual Permit Fees
RCW 90.48.465 requires Ecology to recover the costs of managing the permit program. Permit
fees are invoiced annually until the permit is terminated. Termination conditions are described
in the permit. For permit fee related questions, please contact the Water Quality Fee Unit at
wqfeeunit@ecy.wa.gov or (800) 633-6193, Option 2. You can also visit Water Quality Permit
Fees Webpage4 for more information.
Ecology Field Inspector Assistance
If you have questions regarding stormwater management at your construction site, please contact
your Regional Inspector, Maria Zeman of Ecology’s Northwest Regional Office in Shoreline at
maria.zeman@ecy.wa.gov, or (425) 240-0409.
Questions or Additional Information
Ecology is here to help. Please review our Construction Stormwater General Permit webpage5 for
more information. If you have questions about the Construction Stormwater General Permit,
please contact your Permit Administrator, Alyssa Brewer at alyssa.brewer@ecy.wa.gov or (564)
669-4922.
Sincerely,
Jeff Killelea, Manager
Permit and Technical Services Section
Water Quality Program
2 https://ecology.wa.gov/Regulations-Permits/Guidance-technical-assistance/Water-quality-permits-
guidance/WQWebPortal-guidance
3 https://apps.ecology.wa.gov/publications/summarypages/1710007.html
4 https://ecology.wa.gov/Water-Shorelines/Water-quality/Water-quality-permits/Fees
5 www.ecology.wa.gov/constructionstormwaterpermit