Project No. 6430.01 Page 1 of 3 Report ID 6430.01 S 2025 1217
Date Wed 12/17/2025 Weather 45°F, Partly Cloudy
Arrival/Departure Time(s) 1:15pm / 2:45pm Travel Time (hr) 1.0
Project Name Grant Place
Location 1600 Grant Ave S, Renton
ESNW Rep., CESCL No.,
Phone No. & Report Statement
Ethan Taskey | ECO-3-3102501 | (206) 795-8281
“This report is true, accurate, and complete to the best of my knowledge and belief.”
Client Info/Contact Apex Enterprises Group, LLC | Siki Chang
Permit No(s). WAR304993
Reviewed By JLM
Initials/Date
N/A
Field Supervisor Project Manager Initials/Date
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s
observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for
obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible
for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations,
is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Type of visit: Daily Weekly Monthly Other
Precipitation since last inspection (approximate): 1.20 inches
Precipitation in last 24 hours (approximate): 1.20 inches
Phase of active construction (check all that apply):
Pre-construction Clearing, demolition, or grading Infrastructure or roads
Concrete handling Vertical construction Utilities
Off-site improvements Site temporarily stabilized Final stabilization
Was water quality sampling part of this inspection? Yes No
If “Yes”:
• Record results in the table below.
• Hanna Turbidity Meter No. 19
Monitoring
Point Monitoring Location Turbidity
(NTU) pH Description of
Discharge Notes
MP 1 Storm Vault (North Access) - - N/A No discharge from site
MP 2 Storm Vault (South Access) - - N/A No discharge from site
MP 3 Northern Construction Access 877 7 Cloudy water
Water running over curb
along south construction
entrance and leaving towards CB past North construction
entrance
MP 4 East of North Construction entrance,
along silt fence - - N/A No discharge from site
eot ech nic al ngineering
nvironment al er vices
art hwork bservat ion esting
t ormwater ervices
Report ID 6430.01 S 2025 1217 Page 2 of 3
Erosion Control BMPs
(13 Elements)
Overall
Condition
(Good; Fair; Poor)
Needs
Repair?
(Yes; No)
Comments
1. Preserve Vegetation; Mark Clearing Limits
• Buffer zones around sensitive areas • Fence G N -Silt fence along the site perimeter
2. Establish Construction Access
• Fabric; quarry spalls
• Wheel wash
• Sweeper truck
G N -Site entrances are stabilized with quarry spalls
3. Control Flow Rates • Stormwater vault; facility
• Straw wattles
• Check dams
P Y
-Underground storm system in place
-Storm vault onsite
-Straw wattle added to site entrances
-Add check dams to areas where rills are forming at higher elevations
4. Install Sediment Controls • Silt fence
• Vegetation
• Sediment ponds; traps • Treatment
F Y
-Silt fence along the site perimeter
-Silt fence added to Northern site entrance
-Silt fence against Northern perimeter repaired
-Silt fence damaged and not buried deep
enough, add more material to bottom of silt
fence and ensure t’ in good condition
-Add silt fence in front of south entrance if the
entrance is inactive
5. Stabilize Soils
• Nets and blankets • Mulch; bark; rock
• Vegetation
• Plastic covering
• Water truck
G N
-Cover exposed soil that is unworked for 2+ days
-Straw on exposed soil -Straw added to large area of exposed soil near
entrance
-Storm vault area is covered with gravel
-Stockpiles are covered with plastic sheeting
6. Protect Slopes
• Benching; track-walking
• Pipe slope drains • Plastic covering
- - N/A
7. Protect Drain Inlets
• Catch basin inserts G N -Catch basin inserts in place
8. Stabilize Channels and Outlets
• Channel lining
• Check dams • Outlet protection
F Y
-Check dams added to rills forming along south
perimeter
-Small channels diverting water need to move
water to areas with check dams or sediment
traps
9. Control Pollutants • Chemical storage area covered
• Concrete handling
- - N/A
10. Control Dewatering - - -Notify ESNW prior to any discharging from site
11. Maintain BMPs P Y -See any details below
12. Maintain SWPPP & Site Logbook G N -Available upon request
13. Protect Low-Impact Development (LID BMPs)
• Bioretention rain garden facilities
• Permeable pavement
- - N/A
Do existing BMPs need to be modified or removed, or do other BMPs need to be installed? Yes No
List the action items in the table below:
Element
# Description and Location Action Required Completion
Date
3 North and South side of site where rills are forming Add more check dams to slow water
4 Silt fence East of North construction entrance Ensure bottom is adequately buried and
the silt fence is intact
8 Small channels diverting water away from site entrance Make sure water is diverted to sediment
trap or check dams
4 Water running over curb at South entrance
If south entrance isn’t in use add silt fence
along that section to prevent water leaving
site
Report ID 6430.01 S 2025 1217 Page 3 of 3
BMP LEGEND
MONITORING POINT
STRAW
VERTICAL CONSTRUCTION
STORMWATER VAULT
STABILIZED CONSTRUCTION ACCESS
SILT FENCE
STOCKPILE
CATCH BASIN INSERT
PLASTIC COVERING
WATTLE
CHECK DAM
TEMPORARY SEDIMENT POND/TRAP
MP 1
MP 2
MP 3
MP 4
Divert water to
check dams or
sediment trap
Bury bottom of silt
fence and repair
any damage
Add more
check dams to areas where
rills are forming
Add silt fence