DETERMINATION OF NON-SIGNIFICANCE – MITIGATED
(DNS-M) MITIGATION MEASURES AND ADVISORY NOTES
PROJECT NUMBER: LUA18-000357, ECF
APPLICANT: Brian Ludwig, Innova Architects, Inc., 950 Pacific Avenue, Suite
450, Tacoma, WA 98402
PROJECT NAME: 601 Monster Rd Demolition
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the
demolition of an existing 143,862 square foot concrete tilt up building previously occupied by Graphic
Packaging as well as a 2,900 square foot shop building located to the south of the main building. All
utilities would be capped as part of the demolition. The project site totals 9.61 acres and is zoned
Medium Industrial (IM). Access to the site is currently provided via 3 driveway cu rb cuts off of Monster
Rd SW and one driveway access via the property to the west. The proposal would access the site via all
existing access points. The site is mapped with a coal mine hazard, erosion hazard, and protected and
sensitive slopes. Offsite wetland areas have been identified to the southwest of the project site.
PROJECT LOCATION: 601 Monster Road SW (Parcel No. 242304-9008)
LEAD AGENCY: The City of Renton
Department of Community & Economic Development
Planning Division
MITIGATION MEASURES:
There are no mitigation measures recommended at this time.
ADIVISORY NOTES:
The following notes are supplemental information provided in conjunction with the administrative
land use action. Because these notes are provided as information only, they are not subject to the
appeal process for the land use actions.
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 2 LUA18-000357
ADVISORY NOTES TO APPLICANT
The following notes are supplemental information provided in conjunction with the administrative land use
action. Because these notes are provided as information only, they are not subject to the appeal process for
the land use action.
Planning:
(Contact: Name, 425-430-6598, jding@rentonwa.gov)
1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless
otherwise approved by the Development Services Division.
2. Commercial, multi-family, new single family and other nonresidential construction activities shall be
restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through
Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and eight
o’clock (8:00) p.m. No work shall be permitted on Sundays.
3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an
appropriate ground cover over any portion of the site that is graded or cleared of vegetation and where
no further construction work will occur within ninety (90) days. Alternative measures such as mulch,
sodding, or plastic covering as specified in the current King County Surface Water Management Design
Manual as adopted by the City of Renton may be proposed between the dates of November 1st and
March 31st of each year. The Development Services Division’s approval of this work is required prior to
final inspection and approval of the permit.
4. A National Permit Discharge Elimination System (NPDES) permit is required when more than one acre is
being cleared.
5. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies or
fluids, operate any equipment, install impervious surfaces, or compact the earth in any way within the
area defined by the drip line of any tree to be retained.
6. The applicant shall erect and maintain six foot (6') high chain link temporary construction fencing around
the drip lines of all retained trees, or along the perimeter of a stand of retained trees. Placards shall be
placed on fencing every fifty feet (50') indicating the words, “NO TRESPASSING – Protected Trees” or on
each side of the fencing if less than fifty feet (50'). Site access to individually protected trees or groups
of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides. In addition, the
applicant shall provide supervision whenever equipment or trucks are moving near trees.
Development Engineering:
(Contact: Name, 425-430-7298, rnair@rentonwa.gov)
1. Cut & cap permits for water, sewer, and storm water are required with the demo permit for the
existing building. The cut and cap for the sewer pump should be done since the applicant stated that
the future project is proposing to have gravity sewer service.
2. Cut and cap the existing 12” diameter water line before it comes into the vault. Provide end cap and
blowoff.
Fire Authority:
(Contact: Corey Thomas, 425-430-7024, cthomas@rentonwa.gov)
1. No Comments
Technical Services:
ADVISORY NOTES TO APPLICANT
Page 2 of 2 LUA18-000357
(Contact: Amanda Askren, 425-430-7369, aaskren@rentonwa.gov)
1. No Comments
Community Services:
(Contact: Leslie Betlach, 425-430-6619, lbetlach@rentonwa.gov)
1. No Comments
Police:
(Contact: Cyndie Parks, 425-430-7521, cparks@rentonwa.gov)
1. No Comments
Building:
(Contact: Craig Burnell, 425-430-7290, cburnell@rentonwa.gov)
1. No Comments