Loading...
HomeMy WebLinkAbout2024 Impact Fee Report RCW 82.02.070 requires that each local government imposing impact fees shall provide a report on each impact fee account showing the source and amount of all moneys collected, earned, or received and system improvements that were financed in whole or in part by impact fees. This report is being provided in response to this requirement. Impact fee collections spiked in 2022 due to the Solera project. Collections in 2023 were significantly lower and were primarily related to the University of Washington Medical Testing Lab, Sounders FC Center, and Elliot Farms (various buildings) projects. Collections in 2024 were moderately higher than the prior year primarily driven by the LivAway Suites, Maple Highlands, and Hazen High School Portables projects. Transportation Impact Fees (TIF) During 2024, the city collected $1,284,081 in Transportation Impact Fees, which is a 55% increase from 2023, which had a collection of $828,414. Remaining fund balance at the end of 2024 was $3,613,321. The chart below shows the TIF revenue collections from 2019-2024, excluding interest earned. Transportation Projects Rainier Ave S/N Ph 4 - S 3rd Street to NW 3rd Place Phase 4 of the Rainier Ave Corridor Improvements extends previous corridor improvements from S 3rd St to 1,000 feet north of Airport Way (NW 3rd Pl). Project elements include extending a southbound business access and transit (BAT) lane from S 2nd St to S 3rd St, pedestrian improvements with streetscaping, pedestrian actuated traffic signal (HAWK), transit facility $0 $1,000,000 $2,000,000 $3,000,000 $4,000,000 $5,000,000 $6,000,000 $7,000,000 $8,000,000 $9,000,000 2019 2020 2021 2022 2023 2024 CITY OF RENTON Impact Fee Annual Report FY 2024 upgrades, access management, and a segment of a regional pedestrian/bike path trail (Lake Washington Loop Trail). In 2024, the city spent $15,730,651 on this project, of which $64,975 or less than 1% were impact fees. Park Ave Extension This project extends Park Ave N to the north of Logan Ave N, to provide access to Southport and The Boeing Company. Improvements include the construction of a railroad crossing, signal improvements, utility improvements, illumination installation, underground utility relocation, and landscaping. In 2024, the city spent $1,447,667 on this project, which was 100% impact fees. Park Impact Fees (PIF) During 2024, the city collected $173,883 in Park Impact Fees, which is a 15.6% increase from 2023, which had a collection of $120,419. Remaining fund balance at the end of 2024 was $359,743. The chart below shows the PIF revenue collections from 2019-2024, excluding interest earned. Park Projects Talbot Hill Reservoir Park Site Improvements: This park renovation project includes sports court surfacing and amenity additions, ADA access improvements, parking lot repair and resealing, and new site furnishings include a shade structure, bike rack, and drinking fountain. In 2024, the city spent $103,101 on this project, 100% of which was funded by impact fees. In 2024 the project had a total budget of $998,145, of which $125,000 or 13% was impact fees. Cleveland-Richardson Park Master Plan: This project involves planning a new 24-acre park in the Talbot neighborhood of Southwest Renton. The master plan will assess current conditions, propose improvements for public recreation, evaluate the feasibility of a Ranger/caretaker facility, and provide strategies to protect and enhance natural areas, ultimately providing a clear vision for the park's development. In 2024, the city spent $44,696 on this project, 100% of which was funded by impact fees. In 2024 the project had a total budget of $200,000, entirely funded by impact fees. However, future phases of the project will utilize additional funding sources. $0 $200,000 $400,000 $600,000 $800,000 $1,000,000 $1,200,000 $1,400,000 $1,600,000 2019 2020 2021 2022 2023 2024 Northeast Renton Park Master Plan: This project involved developing a park master plan for a new 18.5-acre neighborhood park in Renton’s East Plateau Planning Area. The master plan provides a vision, framework, and strategy for developing park programming to meet community needs while balancing conservation and enhancement of adjacent natural areas. Programming includes a play area, trails, a picnic shelters, ample seating, open lawn areas, a comfort station, and, following additional property acquisitions, an off-leash area and sports court. In 2024, the city spent $142,051 on this project, 100% of which was funded by impact fees. In 2024 the project had a total budget of $200,000, entirely funded by impact fees. However, future phases of the project will utilize additional funding sources. Fire Impact Fees (FIF) During 2024, the city collected $98,123 in Fire Impact Fees which is a 59% increase from 2023 which had a collection of $40,260. The chart below shows the FIF revenue collections from 2019-2024, excluding interest earned. Impact fees collected are subsequently transferred to Renton Regional Fire Authority for use on qualifying capital projects. The following annual report presents the system improvements, if any, funded by fire impact fees. $0 $200,000 $400,000 $600,000 $800,000 $1,000,000 $1,200,000 $1,400,000 2019 2020 2021 2022 2023 2024 School Impact Fees (SIF) During 2024, the city collected $318,317 in School Impact Fees which is a 72% increase from 2023 which had a collection of $185,062. The chart below shows the SIF revenue collections from 2019- 2024, excluding interest earned. Impact fees collected are subsequently transferred to Kent, Issaquah, and Renton School District for use on qualifying capital projects. The following annual reports provided by the districts present the system improvements, if any, funded by school impact fees. $0 $1,000,000 $2,000,000 $3,000,000 $4,000,000 $5,000,000 2019 2020 2021 2022 2023 2024 ILentonSCHOOLDISTRICT SERVICE I EXCELLENCE IEQUITY BUSINESS SERVICES February 03,2025 City of Renton Attn:Gina Estep,Economic Development Department 1055 S Grady Way Renton,Wa 98057 RE:Annual Report of Impact Fee Expenditures -2024 Dear Ms.Estep, Enclosed is the 2024 Annual Report of the City of Renton Impact Fee Expenditures for the Renton School District.l herebyreportthattheRenton School Districtexpended atotal of $1,531,385 forthecalendar year 2024. The funds were used for The Hazen Portable Project 2096 in alignment with the District’s 2024 Capital Facilities Plan. If any questions,please feel free to contact me at (425)204-2394. With regards, Jason E.Franklin,CPA Executive Director,Business Services Email:Jason.franklin@tentonschools.us 300 SW 7”Street,Washington 98057 Ip.425.204.2300 www.rentonschools.us RENTON SCHOOL DISTRICT -CITY OF RENTON -IMPACT FEE REPORT 2024 BEGINNING BALANCE Add:Revenues Fees Collected Interest Fr City: Interest Fr County: Subtotal Revenues Less:Expenditures $4,454,494 $(1,531,385) NET ENDING BALANCE Year Ended 2024 Revenue Details Date Interest $3,186,401 County mt Total Impact Fee Rev Expire Date 5 $ $ $ S - $(1,531,385) $80,931 $ S 182,361 $263,292 01/09/24 02/09/24 03109124 04/09/24 05/09/24 06/09/24 07/09/24 08/09/24 09/09/24 10/09/24 11/09/24 12/09/24 BatchlCheck #Total Amount Check #413547 Check #413876 Check #410478 Check #415308 Check #415682 Check #416552 Check #417295 Check #41 8690 Check #418690 Check #420106 Check #420784 $ $17,572 $-$14,70580 $32,278 $5,873 $-$14,997.06 $20,870 5 5,932 $-$14,673.10 $20,605 $2,229 $-$15,634.52 $17,864 5 8,645 $-$15,659.09 $24.304 S 19,485 $-$16,697.40 $36.183 $2,161 $-$16,458.71 $18,620 5 -$17,334.43 S 17,334 $6,653 $-$17,039.81 S 23,693 5 5,897 5 -$15,974.36 $21,871 5 2,161 $-$11,734.00 $13,895 $4,322 $-$11,453.05 S 15,775 S -$-s -$- $-s -$-$- s -s -s -$- Year Ended 2024 Expenditure Detail Project GRAND TOTAL IMPACT FEE RECEIPTS $80,931 $-$263,292 Exp Type $182.361 Vendor Date Warrant#Amount Comments 2096 Hazen Portables 9/25/24 $(1,494,815) 2096 Hazen Portables 10/25/24 $(26,430) 2096 Hazen Portables 10/28/24 $(10,140) TOTAL 2024 ALLOCATED IMPACT FEE EXPENDITURES