Loading...
HomeMy WebLinkAboutS_RSD Transportation Expansion_BQW_251104_v41055 South Grady Way – 6 th Floor | Renton, WA 98057 (425) 430-7200 Date Prepared: Name: PE Registration No: Firm Name: Firm Address: Phone No. Email Address: Project Name: Project Owner: CED Plan # (LUA):Phone: CED Permit # (C):Address: Site Address: Street Intersection:Addt'l Project Owner: Parcel #(s):Phone: Address: Clearing and grading greater than or equal to 5,000 board feet of timber? Yes/No:NO Water Service Provided by: If Yes, Provide Forest Practice Permit #:Sewer Service Provided by: SITE IMPROVEMENT BOND QUANTITY WORKSHEET PROJECT INFORMATION CITY OF RENTON CITY OF RENTON Engineer Stamp Required (all cost estimates must have original wet stamp and signature) Clearing and Grading Utility Providers N/A Project Location and Description Project Owner Information RSD Transportation Expansion Seattle, WA 98178 7224000676, 7224000675, 7564600105 Andrew Hollenback c/o Renton School District LUA24-000376 425.204.4437 11/4/2025 Prepared by: FOR APPROVALProject Phase 1 alan@jacobsonengineers.com Alan Jacobson 43667 Jacobson Consulting Engineers 255 S King St, Suite 800, Seattle, WA 98104 206.426.2600 420 Park Ave N, Renton, WA 98057 7812 S 124th St Park Ave N and N 4th Street C25001104 -$ Abbreviated Legal Description: RENTON FARM PLAT LOT A OF RENTON LLA LUA-11-016-LLA REC #20110616900016 SD LLA BEING LOTS 10 THRU 13 BLK 8 OF SD PLAT (7224000676), RENTON FARM PLAT LOT B OF RENTON LLA LUA-11-016-LLA REC #20110616900016 SD LLA BEING LOTS 10 THRU 13 BLK 8 OF SD PLAT (7224000675), SARTORISVILLE ADD TGW LOTS 1 THRU 9 BLK 8 OF PLAT OF RENTON FORM PLAT LESS RDS (7564600105) Total Estimated Construction Costs E A + B + C + D 298,031.81$ Estimated Civil Construction Permit - Construction Costs2 Stormwater (Drainage)C 49,609.63$ As outlined in City Ordinance No. 4345, 50% of the plan review and inspection fees are to be paid at Permit Submittal. The balance is due at Permit Issuance. Significant changes or additional review cycles (beyond 3 cycles) during the review process may result in adjustments to the final review fees. Roadway (Erosion Control + Transportation)D 248,422.18$ Water A -$ Wastewater (Sanitary Sewer)B Page 2 of 15 Ref 8-H Bond Quantity Worksheet SECTION I PROJECT INFORMATION Version 4/1/2024 Printed 11/4/2025 10.3%2 All prices include labor, equipment, materials, overhead, profit, and taxes. City of Renton Sales Tax is: 1 Select the current project status/phase from the following options: For Approval - Preliminary Data Enclosed, pending approval from the City; For Construction - Estimated Data Enclosed, Plans have been approved for contruction by the City; Project Closeout - Final Costs and Quantities Enclosed for Project Close-out Submittal Page 3 of 15 Ref 8-H Bond Quantity Worksheet SECTION I PROJECT INFORMATION Version 4/1/2024 Printed 11/4/2025 CED Permit #:C25001104 Unit Reference #Price Unit Quantity Cost Backfill & compaction-embankment ESC-1 7.50$ CY Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 90.00$ Each Catch Basin Protection ESC-3 145.00$ Each 8 1,160.00 Crushed surfacing 1 1/4" minus ESC-4 WSDOT 9-03.9(3)110.00$ CY Ditching ESC-5 10.50$ CY Excavation-bulk ESC-6 2.30$ CY Fence, silt ESC-7 SWDM 5.4.3.1 5.00$ LF 90 450.00 Fence, Temporary (NGPE)ESC-8 1.75$ LF Geotextile Fabric ESC-9 3.00$ SY 240 720.00 Hay Bale Silt Trap ESC-10 0.60$ Each Hydroseeding ESC-11 SWDM 5.4.2.4 0.90$ SY Interceptor Swale / Dike ESC-12 1.15$ LF 434 499.10 Jute Mesh ESC-13 SWDM 5.4.2.2 4.00$ SY Level Spreader ESC-14 2.00$ LF Mulch, by hand, straw, 3" deep ESC-15 SWDM 5.4.2.1 2.90$ SY Mulch, by machine, straw, 2" deep ESC-16 SWDM 5.4.2.1 2.30$ SY Piping, temporary, CPP, 6"ESC-17 13.75$ LF Piping, temporary, CPP, 8"ESC-18 16.00$ LF Piping, temporary, CPP, 12"ESC-19 20.50$ LF Plastic covering, 6mm thick, sandbagged ESC-20 SWDM 5.4.2.3 4.60$ SY Rip Rap, machine placed; slopes ESC-21 WSDOT 9-13.1(2)51.00$ CY Rock Construction Entrance, 50'x15'x1'ESC-22 SWDM 5.4.4.1 2,050.00$ Each Rock Construction Entrance, 100'x15'x1'ESC-23 SWDM 5.4.4.1 3,675.00$ Each 1 3,675.00 Sediment pond riser assembly ESC-24 SWDM 5.4.5.2 2,525.00$ Each Sediment trap, 5' high berm ESC-25 SWDM 5.4.5.1 22.00$ LF 26 572.00 Sed. trap, 5' high, riprapped spillway berm section ESC-26 SWDM 5.4.5.1 80.00$ LF Seeding, by hand ESC-27 SWDM 5.4.2.4 1.15$ SY Sodding, 1" deep, level ground ESC-28 SWDM 5.4.2.5 9.20$ SY Sodding, 1" deep, sloped ground ESC-29 SWDM 5.4.2.5 11.50$ SY TESC Supervisor ESC-30 125.00$ HR 80 10,000.00 Water truck, dust control ESC-31 SWDM 5.4.7 160.00$ HR Unit Reference #Price Unit Quantity Cost SWDM D.2.1.2.5 4.00$ LF 650 2,600.00 EROSION/SEDIMENT SUBTOTAL:19,676.10 SALES TAX @ 10.3%2,026.64 EROSION/SEDIMENT TOTAL:21,702.74 (A) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR EROSION & SEDIMENT CONTROL Description No. (A) Straw Wattles WRITE-IN-ITEMS Page 4 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.a EROSION_CONTROL Version: 4/01/2024 Printed 11/4/2025 CED Permit #:C25001104 Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost GENERAL ITEMS Backfill & Compaction- embankment GI-1 7.00$ CY Backfill & Compaction- trench GI-2 10.25$ CY Clear/Remove Brush, by hand (SY)GI-3 1.15$ SY Bollards - fixed GI-4 275.00$ Each Bollards - removable GI-5 520.00$ Each Clearing/Grubbing/Tree Removal GI-6 11,475.00$ Acre Excavation - bulk GI-7 2.30$ CY 45 103.50 Excavation - Trench GI-8 5.75$ CY Fencing, cedar, 6' high GI-9 23.00$ LF Fencing, chain link, 4'GI-10 44.00$ LF Fencing, chain link, vinyl coated, 6' high GI-11 23.00$ LF 431 9,913.00 Fencing, chain link, gate, vinyl coated, 20' GI-12 1,600.00$ Each 2 3,200.00 Fill & compact - common barrow GI-13 28.75$ CY 375 10,781.25 Fill & compact - gravel base GI-14 31.00$ CY Fill & compact - screened topsoil GI-15 44.75$ CY Gabion, 12" deep, stone filled mesh GI-16 74.50$ SY Gabion, 18" deep, stone filled mesh GI-17 103.25$ SY Gabion, 36" deep, stone filled mesh GI-18 172.00$ SY Grading, fine, by hand GI-19 2.90$ SY 305 884.50 Grading, fine, with grader GI-20 2.30$ SY 1520 3,496.00 Monuments, 3' Long GI-21 1,025.00$ Each Sensitive Areas Sign GI-22 8.00$ Each Sodding, 1" deep, sloped ground GI-23 9.25$ SY Surveying, line & grade GI-24 975.00$ Day Surveying, lot location/lines GI-25 2,050.00$ Acre Topsoil Type A (imported)GI-26 32.75$ CY Traffic control crew ( 2 flaggers )GI-27 137.75$ HR Trail, 4" chipped wood GI-28 9.15$ SY Trail, 4" crushed cinder GI-29 10.25$ SY Trail, 4" top course GI-30 13.75$ SY Conduit, 2"GI-31 5.75$ LF Wall, retaining, concrete GI-32 63.00$ SF Wall, rockery GI-33 17.25$ SF SUBTOTAL THIS PAGE:28,378.25 (B)(C)(D)(E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR STREET AND SITE IMPROVEMENTS Quantity Remaining (Bond Reduction) (B)(C) Page 5 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION Version: 4/1/2024 Printed 11/4/2025 CED Permit #:C25001104 Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR STREET AND SITE IMPROVEMENTS Quantity Remaining (Bond Reduction) (B)(C) ROAD IMPROVEMENT/PAVEMENT/SURFACING AC Grinding, 4' wide machine < 1000sy RI-1 34.50$ SY AC Grinding, 4' wide machine 1000-2000sy RI-2 18.25$ SY AC Grinding, 4' wide machine > 2000sy RI-3 11.50$ SY AC Removal/Disposal RI-4 40.00$ SY 20 800.00 1622 64,880.00 Barricade, Type III ( Permanent )RI-5 64.25$ LF Guard Rail RI-6 34.50$ LF Curb & Gutter, rolled RI-7 19.50$ LF Curb & Gutter, vertical RI-8 14.25$ LF 90 1,282.50 808 11,514.00 Curb and Gutter, demolition and disposal RI-9 20.50$ LF 90 1,845.00 633 12,976.50 Curb, extruded asphalt RI-10 6.25$ LF Curb, extruded concrete RI-11 8.00$ LF Sawcut, asphalt, 3" depth RI-12 3.00$ LF 102 306.00 1477 4,431.00 Sawcut, concrete, per 1" depth RI-13 5.00$ LF 30 150.00 Sealant, asphalt RI-14 2.25$ LF 102 229.50 1477 3,323.25 Shoulder, gravel, 4" thick RI-15 17.25$ SY Sidewalk, 4" thick RI-16 43.50$ SY 70 3,045.00 230 10,005.00 Sidewalk, 4" thick, demolition and disposal RI-17 37.00$ SY 70 2,590.00 4 148.00 Sidewalk, 5" thick RI-18 47.00$ SY Sidewalk, 5" thick, demolition and disposal RI-19 46.00$ SY Sign, Handicap RI-20 97.00$ Each 1 97.00 Striping, per stall RI-21 8.00$ Each 46 368.00 Striping, thermoplastic, ( for crosswalk )RI-22 3.50$ SF Striping, 4" reflectorized line RI-23 0.55$ LF Additional 2.5" Crushed Surfacing RI-24 4.15$ SY HMA 1/2" Overlay 1.5" RI-25 16.00$ SY HMA 1/2" Overlay 2"RI-26 20.75$ SY HMA Road, 2", 4" rock, First 2500 SY RI-27 32.25$ SY HMA Road, 2", 4" rock, Qty. over 2500SY RI-28 24.00$ SY HMA Road, 4", 6" rock, First 2500 SY RI-29 51.75$ SY 20 1,035.00 HMA Road, 4", 6" rock, Qty. over 2500 SY RI-30 42.50$ SY HMA Road, 4", 4.5" ATB RI-31 43.50$ SY Gravel Road, 4" rock, First 2500 SY RI-32 17.25$ SY Gravel Road, 4" rock, Qty. over 2500 SY RI-33 11.50$ SY Thickened Edge RI-34 10.00$ LF SUBTOTAL THIS PAGE:11,283.00 107,742.75 (B)(C)(D)(E) Page 6 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION Version: 4/1/2024 Printed 11/4/2025 CED Permit #:C25001104 Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR STREET AND SITE IMPROVEMENTS Quantity Remaining (Bond Reduction) (B)(C) PARKING LOT SURFACING No. 2" AC, 2" top course rock & 4" borrow PL-1 24.00$ SY 2" AC, 1.5" top course & 2.5" base course PL-2 32.00$ SY 1817 58,144.00 4" select borrow PL-3 5.75$ SY 1.5" top course rock & 2.5" base course PL-4 16.00$ SY SUBTOTAL PARKING LOT SURFACING:58,144.00 (B)(C)(D)(E) LANDSCAPING & VEGETATION No. Street Trees LA-1 Median Landscaping LA-2 Right-of-Way Landscaping LA-3 Wetland Landscaping LA-4 SUBTOTAL LANDSCAPING & VEGETATION: (B)(C)(D)(E) TRAFFIC & LIGHTING No. Signs TR-1 Street Light System ( # of Poles)TR-2 Traffic Signal TR-3 Traffic Signal Modification TR-4 SUBTOTAL TRAFFIC & LIGHTING: (B)(C)(D)(E) WRITE-IN-ITEMS SUBTOTAL WRITE-IN ITEMS: STREET AND SITE IMPROVEMENTS SUBTOTAL:11,283.00 194,265.00 SALES TAX @ 10.3%1,162.15 20,009.30 STREET AND SITE IMPROVEMENTS TOTAL:12,445.15 214,274.30 (B)(C)(D)(E) Page 7 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION Version: 4/1/2024 Printed 11/4/2025 CED Permit #:C25001104 Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost DRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.) Access Road, R/D D-1 30.00$ SY * (CBs include frame and lid) Beehive D-2 103.00$ Each Through-curb Inlet Framework D-3 460.00$ Each CB Type I D-4 1,725.00$ Each 4 6,900.00 CB Type IL D-5 2,000.00$ Each CB Type II, 48" diameter D-6 3,500.00$ Each for additional depth over 4' D-7 550.00$ FT CB Type II, 54" diameter D-8 4,075.00$ Each for additional depth over 4'D-9 570.00$ FT CB Type II, 60" diameter D-10 4,225.00$ Each for additional depth over 4'D-11 690.00$ FT CB Type II, 72" diameter D-12 6,900.00$ Each for additional depth over 4'D-13 975.00$ FT CB Type II, 96" diameter D-14 16,000.00$ Each for additional depth over 4'D-15 1,050.00$ FT Trash Rack, 12"D-16 400.00$ Each Trash Rack, 15"D-17 470.00$ Each Trash Rack, 18"D-18 550.00$ Each Trash Rack, 21"D-19 630.00$ Each Cleanout, PVC, 4"D-20 170.00$ Each Cleanout, PVC, 6"D-21 195.00$ Each Cleanout, PVC, 8"D-22 230.00$ Each Culvert, PVC, 4" D-23 11.50$ LF Culvert, PVC, 6" D-24 15.00$ LF Culvert, PVC, 8" D-25 17.00$ LF 181 3,077.00 Culvert, PVC, 12" D-26 26.00$ LF Culvert, PVC, 15" D-27 40.00$ LF Culvert, PVC, 18" D-28 47.00$ LF Culvert, PVC, 24"D-29 65.00$ LF Culvert, PVC, 30" D-30 90.00$ LF Culvert, PVC, 36" D-31 150.00$ LF Culvert, CMP, 8"D-32 22.00$ LF Culvert, CMP, 12"D-33 33.00$ LF SUBTOTAL THIS PAGE:9,977.00 (B)(C)(D)(E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) Page 8 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Version: 4/1/2024 Printed 11/4/2025 CED Permit #:C25001104 Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) DRAINAGE (Continued) Culvert, CMP, 15"D-34 40.00$ LF Culvert, CMP, 18"D-35 47.00$ LF Culvert, CMP, 24"D-36 64.00$ LF Culvert, CMP, 30"D-37 90.00$ LF Culvert, CMP, 36"D-38 150.00$ LF Culvert, CMP, 48"D-39 218.00$ LF Culvert, CMP, 60"D-40 310.00$ LF Culvert, CMP, 72"D-41 400.00$ LF Culvert, Concrete, 8"D-42 48.00$ LF Culvert, Concrete, 12"D-43 55.00$ LF Culvert, Concrete, 15"D-44 89.00$ LF Culvert, Concrete, 18"D-45 100.00$ LF Culvert, Concrete, 24"D-46 120.00$ LF Culvert, Concrete, 30"D-47 145.00$ LF Culvert, Concrete, 36"D-48 175.00$ LF Culvert, Concrete, 42"D-49 200.00$ LF Culvert, Concrete, 48"D-50 235.00$ LF Culvert, CPE Triple Wall, 6" D-51 16.00$ LF Culvert, CPE Triple Wall, 8" D-52 18.00$ LF Culvert, CPE Triple Wall, 12" D-53 27.00$ LF Culvert, CPE Triple Wall, 15" D-54 40.00$ LF Culvert, CPE Triple Wall, 18" D-55 47.00$ LF Culvert, CPE Triple Wall, 24" D-56 64.00$ LF Culvert, CPE Triple Wall, 30" D-57 90.00$ LF Culvert, CPE Triple Wall, 36" D-58 149.00$ LF Culvert, LCPE, 6"D-59 69.00$ LF Culvert, LCPE, 8"D-60 83.00$ LF Culvert, LCPE, 12"D-61 96.00$ LF Culvert, LCPE, 15"D-62 110.00$ LF Culvert, LCPE, 18"D-63 124.00$ LF Culvert, LCPE, 24"D-64 138.00$ LF Culvert, LCPE, 30"D-65 151.00$ LF Culvert, LCPE, 36"D-66 165.00$ LF Culvert, LCPE, 48"D-67 179.00$ LF Culvert, LCPE, 54"D-68 193.00$ LF SUBTOTAL THIS PAGE: (B)(C)(D)(E) Page 9 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Version: 4/1/2024 Printed 11/4/2025 CED Permit #:C25001104 Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) DRAINAGE (Continued) Culvert, LCPE, 60"D-69 206.00$ LF Culvert, LCPE, 72"D-70 220.00$ LF Culvert, HDPE, 6"D-71 48.00$ LF Culvert, HDPE, 8"D-72 60.00$ LF Culvert, HDPE, 12"D-73 85.00$ LF Culvert, HDPE, 15"D-74 122.00$ LF Culvert, HDPE, 18"D-75 158.00$ LF Culvert, HDPE, 24"D-76 254.00$ LF Culvert, HDPE, 30"D-77 317.00$ LF Culvert, HDPE, 36"D-78 380.00$ LF Culvert, HDPE, 48"D-79 443.00$ LF Culvert, HDPE, 54"D-80 506.00$ LF Culvert, HDPE, 60"D-81 570.00$ LF Culvert, HDPE, 72"D-82 632.00$ LF Pipe, Polypropylene, 6"D-83 96.00$ LF Pipe, Polypropylene, 8"D-84 100.00$ LF Pipe, Polypropylene, 12"D-85 100.00$ LF Pipe, Polypropylene, 15"D-86 103.00$ LF Pipe, Polypropylene, 18"D-87 106.00$ LF Pipe, Polypropylene, 24"D-88 119.00$ LF Pipe, Polypropylene, 30"D-89 136.00$ LF Pipe, Polypropylene, 36"D-90 185.00$ LF Pipe, Polypropylene, 48"D-91 260.00$ LF Pipe, Polypropylene, 54"D-92 381.00$ LF Pipe, Polypropylene, 60"D-93 504.00$ LF Pipe, Polypropylene, 72"D-94 625.00$ LF Culvert, DI, 6"D-95 70.00$ LF Culvert, DI, 8"D-96 101.00$ LF Culvert, DI, 12"D-97 121.00$ LF Culvert, DI, 15"D-98 148.00$ LF Culvert, DI, 18"D-99 175.00$ LF Culvert, DI, 24"D-100 200.00$ LF Culvert, DI, 30"D-101 227.00$ LF Culvert, DI, 36"D-102 252.00$ LF Culvert, DI, 48"D-103 279.00$ LF Culvert, DI, 54"D-104 305.00$ LF Culvert, DI, 60"D-105 331.00$ LF Culvert, DI, 72"D-106 357.00$ LF SUBTOTAL THIS PAGE: (B)(C)(D)(E) Page 10 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Version: 4/1/2024 Printed 11/4/2025 CED Permit #:C25001104 Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) Specialty Drainage Items Ditching SD-1 10.90$ CY Flow Dispersal Trench (1,436 base+)SD-3 32.00$ LF French Drain (3' depth)SD-4 30.00$ LF Geotextile, laid in trench, polypropylene SD-5 3.40$ SY Mid-tank Access Riser, 48" dia, 6' deep SD-6 2,300.00$ Each Pond Overflow Spillway SD-7 18.25$ SY Restrictor/Oil Separator, 12"SD-8 1,320.00$ Each Restrictor/Oil Separator, 15"SD-9 1,550.00$ Each Restrictor/Oil Separator, 18"SD-10 1,950.00$ Each Riprap, placed SD-11 48.20$ CY Tank End Reducer (36" diameter)SD-12 1,375.00$ Each Infiltration pond testing SD-13 143.00$ HR Permeable Pavement SD-14 Permeable Concrete Sidewalk SD-15 Culvert, Box __ ft x __ ft SD-16 SUBTOTAL SPECIALTY DRAINAGE ITEMS: (B)(C)(D)(E) STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch) Detention Pond SF-1 Each Detention Tank SF-2 Each Detention Vault SF-3 Each Infiltration Pond SF-4 Each Infiltration Tank SF-5 Each Infiltration Vault SF-6 Each Infiltration Trenches SF-7 Each Basic Biofiltration Swale SF-8 Each Wet Biofiltration Swale SF-9 Each Wetpond SF-10 Each Wetvault SF-11 Each Sand Filter SF-12 Each Sand Filter Vault SF-13 Each Linear Sand Filter SF-14 Each Proprietary Facility SF-15 Each Bioretention Facility SF-16 Each SUBTOTAL STORMWATER FACILITIES: (B)(C)(D)(E) Page 11 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Version: 4/1/2024 Printed 11/4/2025 CED Permit #:C25001104 Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) WRITE-IN-ITEMS (INCLUDE ON-SITE BMPs) Filterra Vault, 4x4 WI-1 22,500.00$ Each 1 22,500.00 Contech CDS Solids Separator WI-2 12,500.00$ Each 1 12,500.00 WI-3 WI-4 WI-5 WI-6 WI-7 WI-8 WI-9 WI-10 WI-11 WI-12 WI-13 WI-14 WI-15 SUBTOTAL WRITE-IN ITEMS:35,000.00 DRAINAGE AND STORMWATER FACILITIES SUBTOTAL:44,977.00 SALES TAX @ 10.3%4,632.63 DRAINAGE AND STORMWATER FACILITIES TOTAL:49,609.63 (B)(C)(D)(E) Page 12 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Version: 4/1/2024 Printed 11/4/2025 CED Permit #:C25001104 Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost Connection to Existing Watermain W-1 3,400.00$ Each Ductile Iron Watermain, CL 52, 4 Inch Diameter W-2 58.00$ LF Ductile Iron Watermain, CL 52, 6 Inch Diameter W-3 65.00$ LF Ductile Iron Watermain, CL 52, 8 Inch Diameter W-4 75.00$ LF Ductile Iron Watermain, CL 52, 10 Inch Diameter W-5 80.00$ LF Ductile Iron Watermain, CL 52, 12 Inch Diameter W-6 145.00$ LF Gate Valve, 4 inch Diameter W-7 1,225.00$ Each Gate Valve, 6 inch Diameter W-8 1,350.00$ Each Gate Valve, 8 Inch Diameter W-9 1,550.00$ Each Gate Valve, 10 Inch Diameter W-10 2,100.00$ Each Gate Valve, 12 Inch Diameter W-11 2,500.00$ Each Fire Hydrant Assembly W-12 5,000.00$ Each Permanent Blow-Off Assembly W-13 1,950.00$ Each Air-Vac Assembly, 2-Inch Diameter W-14 3,050.00$ Each Air-Vac Assembly, 1-Inch Diameter W-15 1,725.00$ Each Compound Meter Assembly 3-inch Diameter W-16 9,200.00$ Each Compound Meter Assembly 4-inch Diameter W-17 10,500.00$ Each Compound Meter Assembly 6-inch Diameter W-18 11,500.00$ Each Pressure Reducing Valve Station 8-inch to 10-inch W-19 23,000.00$ Each WATER SUBTOTAL: SALES TAX @ 10.3% WATER TOTAL: (B)(C)(D)(E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR WATER Quantity Remaining (Bond Reduction) (B)(C) Page 13 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.d WATER Version: 4/1/2024 Printed 11/4/2025 CED Permit #:C25001104 Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost Clean Outs SS-1 1,150.00$ Each Grease Interceptor, 500 gallon SS-2 9,200.00$ Each Grease Interceptor, 1000 gallon SS-3 11,500.00$ Each Grease Interceptor, 1500 gallon SS-4 17,200.00$ Each Side Sewer Pipe, PVC. 4 Inch Diameter SS-5 92.00$ LF Side Sewer Pipe, PVC. 6 Inch Diameter SS-6 110.00$ LF Sewer Pipe, PVC, 8 inch Diameter SS-7 120.00$ LF Sewer Pipe, PVC, 12 Inch Diameter SS-8 144.00$ LF Sewer Pipe, DI, 8 inch Diameter SS-9 130.00$ LF Sewer Pipe, DI, 12 Inch Diameter SS-10 150.00$ LF Manhole, 48 Inch Diameter SS-11 6,900.00$ Each Manhole, 54 Inch Diameter SS-13 6,800.00$ Each Manhole, 60 Inch Diameter SS-15 7,600.00$ Each Manhole, 72 Inch Diameter SS-17 10,600.00$ Each Manhole, 96 Inch Diameter SS-19 16,000.00$ Each Pipe, C-900, 12 Inch Diameter SS-21 205.00$ LF Outside Drop SS-24 1,700.00$ LS Inside Drop SS-25 1,150.00$ LS Sewer Pipe, PVC, ____ Inch Diameter SS-26 Lift Station (Entire System)SS-27 LS SANITARY SEWER SUBTOTAL: SALES TAX @ 10.3% SANITARY SEWER TOTAL: (B)(C)(D)(E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR SANITARY SEWER Quantity Remaining (Bond Reduction) (B)(C) Page 14 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.e SANITARY SEWER Version: 4/1/2024 Printed 11/4/2025 1055 South Grady Way – 6 th Floor | Renton, WA 98057 (425) 430-7200 Date: Name:Project Name: PE Registration No:CED Plan # (LUA): Firm Name:CED Permit # (C): Firm Address:Site Address: Phone No.Parcel #(s): Email Address:Project Phase: Site Restoration/Erosion Sediment Control Subtotal (a) Existing Right-of-Way Improvements Subtotal (b)(b)12,445.15$ Future Public Improvements Subtotal (c)-$ Stormwater & Drainage Facilities (Public & Private) Subtotal (d)(d)49,609.63$ (e) (f) Site Restoration Existing Right-of-Way and Storm Drainage Improvements Maintenance Bond 12,410.96$ Bond Reduction 2 Construction Permit Bond Amount 3 Minimum Bond Amount is $10,000.00 1 Estimate Only - May involve multiple and variable components, which will be established on an individual basis by Development Engineering. 2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% will cover all remaining items to be constructed. 3 Required Bond Amounts are subject to review and modification by Development Engineering. * Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton. ** Note: All prices include labor, equipment, materials, overhead, profit, and taxes. 206.426.2600 alan@jacobsonengineers.com RSD Transportation Expansion LUA24-000376 420 Park Ave N, Renton, WA 98057 7224000676, 7224000675, 7564600105 FOR APPROVAL C25001104 255 S King St, Suite 800, Seattle, WA 98104 89,980.09$ P (a) x 100% SITE IMPROVEMENT BOND QUANTITY WORKSHEET BOND CALCULATIONS 11/4/2025 Alan Jacobson 43667 Jacobson Consulting Engineers R ((b x 150%) + (d x 100%)) S (e) x 150% + (f) x 100% Bond Reduction: Existing Right-of-Way Improvements (Quantity Remaining)2 Bond Reduction: Stormwater & Drainage Facilities (Quantity Remaining)2 T (P +R - S) Prepared by:Project Information CONSTRUCTION BOND AMOUNT */** (prior to permit issuance) EST1 ((b) + (c) + (d)) x 20% -$ MAINTENANCE BOND */** (after final acceptance of construction) 21,702.74$ 12,445.15$ 68,277.35$ 21,702.74$ -$ 49,609.63$ -$ Page 15 of 15 Ref 8-H Bond Quantity Worksheet SECTION III. BOND WORKSHEET Version: 4/1/2024 Printed 11/4/2025