Loading...
HomeMy WebLinkAboutRS_Geotechnical_Report_251209_v1EarthSolutionsNWLLC EarthSolutions NW LLC 15365 N.E.90th Street,Suite 100 Redmond,WA 98052 (425)449-4704 Fax (425)449-4711 www.earthsolutionsnw.com Geotechnical Engineering Construction Observation/Testing Environmental Services GEOTECHNICAL ENGINEERING STUDY PROPOSED SINGLE-FAMILY RESIDENCES TALBOT HILLS SHORT PLAT XXX SOUTH 55 STREET RENTON,WASHINGTON ES-9182 TH PREPARED FOR SCHNEIDER FAMILY HOMES, LLC August 8, 2023 _________________________ Samuel E. Suruda, L.G. Senior Staff Geologist _________________________ Stephen H. Avril Project Manager _________________________ Kyle R. Campbell, P.E. Senior Principal Engineer GEOTECHNICAL ENGINEERING STUDY PROPOSED SINGLE-FAMILY RESIDENCES TALBOT HILLS SHORT PLAT XXX SOUTH 55TH STREET RENTON, WASHINGTON ES-9182 Earth Solutions NW, LLC 15365 Northeast 90th Street, Suite 100 Redmond, Washington 98052 Phone: 425-449-4704 | Fax: 425-449-4711 www.earthsolutionsnw.com 08/08/2023 Geotechnical-Engineering Report Important Information about This Subsurface problems are a principal cause of construction delays, cost overruns, claims, and disputes. While you cannot eliminate all such risks, you can manage them. The following information is provided to help. The Geoprofessional Business Association (GBA) has prepared this advisory to help you – assumedly a client representative – interpret and apply this geotechnical-engineering report as effectively as possible. In that way, you can benefit from a lowered exposure to problems associated with subsurface conditions at project sites and development of them that, for decades, have been a principal cause of construction delays, cost overruns, claims, and disputes. If you have questions or want more information about any of the issues discussed herein, contact your GBA-member geotechnical engineer. Active engagement in GBA exposes geotechnical engineers to a wide array of risk-confrontation techniques that can be of genuine benefit for everyone involved with a construction project. Understand the Geotechnical-Engineering Services Provided for this Report Geotechnical-engineering services typically include the planning, collection, interpretation, and analysis of exploratory data from widely spaced borings and/or test pits. Field data are combined with results from laboratory tests of soil and rock samples obtained from field exploration (if applicable), observations made during site reconnaissance, and historical information to form one or more models of the expected subsurface conditions beneath the site. Local geology and alterations of the site surface and subsurface by previous and proposed construction are also important considerations. Geotechnical engineers apply their engineering training, experience, and judgment to adapt the requirements of the prospective project to the subsurface model(s). Estimates are made of the subsurface conditions that will likely be exposed during construction as well as the expected performance of foundations and other structures being planned and/or affected by construction activities. The culmination of these geotechnical-engineering services is typically a geotechnical-engineering report providing the data obtained, a discussion of the subsurface model(s), the engineering and geologic engineering assessments and analyses made, and the recommendations developed to satisfy the given requirements of the project. These reports may be titled investigations, explorations, studies, assessments, or evaluations. Regardless of the title used, the geotechnical-engineering report is an engineering interpretation of the subsurface conditions within the context of the project and does not represent a close examination, systematic inquiry, or thorough investigation of all site and subsurface conditions. Geotechnical-Engineering Services are Performed for Specific Purposes, Persons, and Projects, and At Specific Times Geotechnical engineers structure their services to meet the specific needs, goals, and risk management preferences of their clients. A geotechnical-engineering study conducted for a given civil engineer will not likely meet the needs of a civil-works constructor or even a different civil engineer. Because each geotechnical-engineering study is unique, each geotechnical-engineering report is unique, prepared solely for the client. Likewise, geotechnical-engineering services are performed for a specific project and purpose. For example, it is unlikely that a geotechnical- engineering study for a refrigerated warehouse will be the same as one prepared for a parking garage; and a few borings drilled during a preliminary study to evaluate site feasibility will not be adequate to develop geotechnical design recommendations for the project. Do not rely on this report if your geotechnical engineer prepared it: • for a different client; • for a different project or purpose; • for a different site (that may or may not include all or a portion of the original site); or • before important events occurred at the site or adjacent to it; e.g., man-made events like construction or environmental remediation, or natural events like floods, droughts, earthquakes, or groundwater fluctuations. Note, too, the reliability of a geotechnical-engineering report can be affected by the passage of time, because of factors like changed subsurface conditions; new or modified codes, standards, or regulations; or new techniques or tools. If you are the least bit uncertain about the continued reliability of this report, contact your geotechnical engineer before applying the recommendations in it. A minor amount of additional testing or analysis after the passage of time – if any is required at all – could prevent major problems. Read this Report in Full Costly problems have occurred because those relying on a geotechnical- engineering report did not read the report in its entirety. Do not rely on an executive summary. Do not read selective elements only. Read and refer to the report in full. You Need to Inform Your Geotechnical Engineer About Change Your geotechnical engineer considered unique, project-specific factors when developing the scope of study behind this report and developing the confirmation-dependent recommendations the report conveys. Typical changes that could erode the reliability of this report include those that affect: • the site’s size or shape; • the elevation, configuration, location, orientation, function or weight of the proposed structure and the desired performance criteria; • the composition of the design team; or • project ownership. As a general rule, always inform your geotechnical engineer of project or site changes – even minor ones – and request an assessment of their impact. The geotechnical engineer who prepared this report cannot accept responsibility or liability for problems that arise because the geotechnical engineer was not informed about developments the engineer otherwise would have considered. Most of the “Findings” Related in This Report Are Professional Opinions Before construction begins, geotechnical engineers explore a site’s subsurface using various sampling and testing procedures. Geotechnical engineers can observe actual subsurface conditions only at those specific locations where sampling and testing is performed. The data derived from that sampling and testing were reviewed by your geotechnical engineer, who then applied professional judgement to form opinions about subsurface conditions throughout the site. Actual sitewide-subsurface conditions may differ – maybe significantly – from those indicated in this report. Confront that risk by retaining your geotechnical engineer to serve on the design team through project completion to obtain informed guidance quickly, whenever needed. This Report’s Recommendations Are Confirmation-Dependent The recommendations included in this report – including any options or alternatives – are confirmation-dependent. In other words, they are not final, because the geotechnical engineer who developed them relied heavily on judgement and opinion to do so. Your geotechnical engineer can finalize the recommendations only after observing actual subsurface conditions exposed during construction. If through observation your geotechnical engineer confirms that the conditions assumed to exist actually do exist, the recommendations can be relied upon, assuming no other changes have occurred. The geotechnical engineer who prepared this report cannot assume responsibility or liability for confirmation-dependent recommendations if you fail to retain that engineer to perform construction observation. This Report Could Be Misinterpreted Other design professionals’ misinterpretation of geotechnical- engineering reports has resulted in costly problems. Confront that risk by having your geotechnical engineer serve as a continuing member of the design team, to: • confer with other design-team members; • help develop specifications; • review pertinent elements of other design professionals’ plans and specifications; and • be available whenever geotechnical-engineering guidance is needed. You should also confront the risk of constructors misinterpreting this report. Do so by retaining your geotechnical engineer to participate in prebid and preconstruction conferences and to perform construction- phase observations. Give Constructors a Complete Report and Guidance Some owners and design professionals mistakenly believe they can shift unanticipated-subsurface-conditions liability to constructors by limiting the information they provide for bid preparation. To help prevent the costly, contentious problems this practice has caused, include the complete geotechnical-engineering report, along with any attachments or appendices, with your contract documents, but be certain to note conspicuously that you’ve included the material for information purposes only. To avoid misunderstanding, you may also want to note that “informational purposes” means constructors have no right to rely on the interpretations, opinions, conclusions, or recommendations in the report. Be certain that constructors know they may learn about specific project requirements, including options selected from the report, only from the design drawings and specifications. Remind constructors that they may perform their own studies if they want to, and be sure to allow enough time to permit them to do so. Only then might you be in a position to give constructors the information available to you, while requiring them to at least share some of the financial responsibilities stemming from unanticipated conditions. Conducting prebid and preconstruction conferences can also be valuable in this respect. Read Responsibility Provisions Closely Some client representatives, design professionals, and constructors do not realize that geotechnical engineering is far less exact than other engineering disciplines. This happens in part because soil and rock on project sites are typically heterogeneous and not manufactured materials with well-defined engineering properties like steel and concrete. That lack of understanding has nurtured unrealistic expectations that have resulted in disappointments, delays, cost overruns, claims, and disputes. To confront that risk, geotechnical engineers commonly include explanatory provisions in their reports. Sometimes labeled “limitations,” many of these provisions indicate where geotechnical engineers’ responsibilities begin and end, to help others recognize their own responsibilities and risks. Read these provisions closely. Ask questions. Your geotechnical engineer should respond fully and frankly. Geoenvironmental Concerns Are Not Covered The personnel, equipment, and techniques used to perform an environmental study – e.g., a “phase-one” or “phase-two” environmental site assessment – differ significantly from those used to perform a geotechnical-engineering study. For that reason, a geotechnical-engineering report does not usually provide environmental findings, conclusions, or recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Unanticipated subsurface environmental problems have led to project failures. If you have not obtained your own environmental information about the project site, ask your geotechnical consultant for a recommendation on how to find environmental risk-management guidance. Obtain Professional Assistance to Deal with Moisture Infiltration and Mold While your geotechnical engineer may have addressed groundwater, water infiltration, or similar issues in this report, the engineer’s services were not designed, conducted, or intended to prevent migration of moisture – including water vapor – from the soil through building slabs and walls and into the building interior, where it can cause mold growth and material-performance deficiencies. Accordingly, proper implementation of the geotechnical engineer’s recommendations will not of itself be sufficient to prevent moisture infiltration. Confront the risk of moisture infiltration by including building-envelope or mold specialists on the design team. Geotechnical engineers are not building-envelope or mold specialists. Copyright 2019 by Geoprofessional Business Association (GBA). Duplication, reproduction, or copying of this document, in whole or in part, by any means whatsoever, is strictly prohibited, except with GBA’s specific written permission. Excerpting, quoting, or otherwise extracting wording from this document is permitted only with the express written permission of GBA, and only for purposes of scholarly research or book review. Only members of GBA may use this document or its wording as a complement to or as an element of a report of any kind. Any other firm, individual, or other entity that so uses this document without being a GBA member could be committing negligent or intentional (fraudulent) misrepresentation. Telephone: 301/565-2733 e-mail: info@geoprofessional.org www.geoprofessional.org August 8, 2023 ES-9182 Schneider Family Homes, LLC 6510 Southcenter Boulevard, Suite 1 Tukwila, Washington 98188 Attention: Zach Schneider Dear Zach: Earth Solutions NW, LLC (ESNW), is pleased to present this geotechnical engineering study to support the proposed residential development. Based on the results of our investigation, the proposed project is feasible from a geotechnical standpoint. Our study indicates the site is underlain primarily by competent glacial till. In our opinion, the proposed residential structures can be supported on a conventional spread and continuous footing system bearing on undisturbed competent native soil, compacted native soil, or new structural fill. Generally speaking, we anticipate competent native soil suitable for support of foundations will be encountered at the typical footing subgrade excavation depth (roughly 18 to 24 inches below grade) with exception of fill observed at test location TP-4 which was observed to a depth of four and one-half feet. The fill observed at TP-4 will need to be removed and replaced to a depth below the observed topsoil at three feet. This material should be replaced following compaction of the material left in-place following the overexcavation of fill. Where loose or unsuitable soil conditions are encountered at foundation subgrade elevations, compaction of the soils to the specifications of structural fill or overexcavation and replacement with suitable structural fill will likely be necessary. An ESNW representative should be contacted to confirm suitability of the foundation subgrade at the time of construction. From a geotechnical standpoint, infiltration on the subject site should be considered infeasible to the general sloping characteristics of the site and surrounding area. The low infiltration potential of the native soils can result in lateral movement of shallow groundwater and would negatively impact the regulated slopes related to the subject site and surrounding area. Landslide and sensitive slope hazard areas are described for the subject site within the City of Renton (COR) on-line mapping tool. ESNW recommends that qualitative slope analysis be conducted on the subject site to determine the suitability of the landslide hazard area for slope remediation. Final grading plans were not available at the time of this report production, and must be provided to ESNW for the slope stability analysis at a later date. 15365 N.E. 90th Street, Suite 100 • Redmond, WA 98052 • (425) 449-4704 • FAX (425) 449-4711 Earth Solutions NW LLC Geotechnical Engineering, Construction Observation/Testing and Environmental Services Schneider Family Homes, LLC ES-9182 August 8, 2023 Executive Summary – Page 2 Earth Solutions NW, LLC Pertinent geotechnical recommendations are provided in this study. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding the content of this geotechnical engineering study, please call. Sincerely, EARTH SOLUTIONS NW, LLC Samuel E. Suruda, L.G. Senior Staff Geologist Earth Solutions NW, LLC Table of Contents ES-9182 PAGE INTRODUCTION ................................................................................. 1 General .................................................................................... 1 Project Description ................................................................. 1 SITE CONDITIONS ............................................................................. 2 Surface ..................................................................................... 2 Subsurface .............................................................................. 2 Topsoil and Fill ............................................................. 2 Native Soil ..................................................................... 3 Geologic Setting ........................................................... 3 Groundwater ................................................................. 3 GEOLOGIC HAZARD AREAS EVALUATION ................................... 3 Landslide Hazard .................................................................... 4 Regulated Slopes .................................................................... 4 DISCUSSION AND RECOMMENDATIONS ....................................... 5 General .................................................................................... 5 Site Preparation and Earthwork ............................................. 5 Temporary Erosion Control ......................................... 6 Stripping ....................................................................... 6 Excavations and Slopes .............................................. 6 In-situ and Imported Soil ............................................. 7 Structural Fill ................................................................ 7 Foundations ............................................................................ 8 Preliminary Seismic Design Considerations ........................ 9 Slab-on-Grade Floors ............................................................. 10 Retaining Walls ....................................................................... 10 Drainage................................................................................... 11 Preliminary Infiltration Feasibility ............................... 11 Preliminary Stormwater Vault Design ........................ 11 Preliminary Pavement Sections ............................................. 12 Utility Support and Trench Backfill ....................................... 13 LIMITATIONS ...................................................................................... 14 Additional Services ................................................................. 14 Earth Solutions NW, LLC Table of Contents Cont’d ES-9182 GRAPHICS Plate 1 Vicinity Map Plate 2 Test Pit Location Plan Plate 3 Retaining Wall Drainage Detail Plate 4 Footing Drain Detail Plate 5 Slope Fill Detail APPENDICES Appendix A Subsurface Exploration Test Pit Logs Appendix B Laboratory Test Results Earth Solutions NW, LLC GEOTECHNICAL ENGINEERING STUDY PROPOSED SINGLE-FAMILY RESIDENCES TALBOT HILLS SHORT PLAT XXX SOUTH 55TH STREET RENTON, WASHINGTON ES-9182 INTRODUCTION General This geotechnical engineering study (study) was prepared for the proposed short plat residential development to be constructed on 55th Street, in Renton, Washington. The purpose of this study was to develop geotechnical recommendations for the project. The following tasks were completed as part of our scope of services for this project:  Observation of test pits in order to characterize soil and near-surface groundwater conditions.  Laboratory testing of soil samples collected at the test pit locations.  Engineering analyses and recommendations for the proposed development.  Preparation of this report. The following documents and maps were reviewed as part of our report preparation:  Topographic Survey, Talbot Hills, prepared by C.E.S. NW, Inc., dated April 19, 2023.  Geologic Map of the Renton Quadrangle, King County, Washington, prepared by D.R. Mullineaux, 1965.  Renton Municipal Code (RMC) Chapter 4-3-050 – Critical Areas Regulations.  King County Liquefaction Susceptibility Map, endorsed by the King County Flood Control District, dated May 2010.  Online Web Soil Survey (WSS) resource, provided by the United States Department of Agriculture (USDA), Natural Resources Conservation Service. Project Description We understand that four new single-family homes are proposed for the subject site. Based on the referenced plan, maximum cuts and fills of roughly 10 feet are expected to achieve most of the residential finish grade elevations. Infiltration is being investigated for the subject property to accommodate runoff from new impervious surfaces related to the site improvements. Schneider Family Homes, LLC ES-9182 August 8, 2023 Page 2 Earth Solutions NW, LLC At the time of report submission, specific building load and grading plans were not available for review; however, we anticipate the proposed multi-family structures will be three to four stories and constructed using relatively lightly loaded wood framing supported on a conventional foundation system. Perimeter footing loads will likely be 2 to 4 kips per lineal foot. Slab-on-grade loading is anticipated to be approximately 150 pounds per square foot (psf). If the above design assumptions either change or are incorrect, ESNW should be contacted to review the recommendations provided in this report. ESNW should review final designs to confirm that our geotechnical recommendations have been incorporated into the plans. SITE CONDITIONS Surface The subject site is located north of 55th Street, approximately 90 feet east of the intersection with 98th Avenue South, in Renton, Washington. The approximate site location is illustrated on Plate 1 (Vicinity Map). The property is comprised of a single tax parcel (King County Parcel Number 3123059119), totaling roughly 2.25 acres. Topography across the subject site generally descends to the west, with approximately 76 feet of total elevation change present. Slope gradients vary between gently and moderately descending slopes, with the majority of moderate slopes concentrated in the northeastern corner of the subject site. The subject site is bordered by South 55th Street to the south, and single-family residences to the east, west, and north. Vegetation within the subject site consists of mature tree growth and moderate undergrowth. Subsurface An ESNW representative observed, logged, and sampled six test pits on April 19, 2023. The test pits were excavated at accessible site locations, using a mini trackhoe provided by the client. The subsurface exploration was completed to evaluate soil conditions, classify site soils, and characterize near-surface groundwater conditions within the proposed development area. The approximate locations of the test pits are depicted on Plate 2 (Test Pit Location Plan). Please refer to the test pit logs provided in Appendix A for a more detailed description of subsurface conditions. Representative soil samples collected at the test pit locations were analyzed in general accordance with both Unified Soil Classification System (USCS) and USDA methods and procedures. Topsoil and Fill Topsoil was observed to depths of generally 6 to 12 inches below the existing ground surface (bgs). The topsoil was characterized by its dark brown color, the presence of fine organic material, and small root intrusions. Fill was encountered at test pit location TP-4 during our fieldwork. The fill was characterized as a silty sand material with sparse quantities of topsoil present. The fill material was observed in a wet condition to its terminus at a depth of approximately four and one-half feet bgs. Based on the existing site conditions, the fill is likely related to past export activities on the subject site, and in our opinion, is not indictive of widespread mass grading. Schneider Family Homes, LLC ES-9182 August 8, 2023 Page 3 Earth Solutions NW, LLC Native Soil Underlying the topsoil and fill, native soils encountered at the test pit locations were observed primarily as medium dense to dense silty sand with varying amounts of gravel (USCS: SM and SP-SM), consistent with the typical makeup of glacial till. In general, the native soil was encountered in a “moist” or “wet” condition, during the time of exploration. The maximum exploration depth was approximately nine feet bgs. Geologic Setting The referenced geologic map identifies kame deposits (Qit) across the subject site, with ground moraine deposits (Qgt) present on the western property margin. The geological map identifies a historic pebble mine on the property, located approximately in the northeastern corner of the subject site. As described on the geologic map, Kame deposits are areas of sand and pebble gravel in scattered terraces. Ground moraine deposits are characterized as ablation till over thick sections of lodgment till. Till is typically comprised of unsorted cobbles, pebbly sand, and sandy silt, with a locally compact layer (referred to as “hardpan”) at depth. The referenced WSS resource identifies Alderwood gravelly sandy loam, 8 to 15 percent slopes, (Map Unit Symbol: AgC) as the primary units underlying the subject site. The Alderwood series formed in glacial till plains. Based on the field observations, the native depositional environment is characterized as relatively medium dense to dense glacial till, which is consistent with local geologic mapping. A pebble and gravel surface mine was historically located on the subject site based on the referenced geologic map. Based on our experience with kame deposits in similar depositional environments, in our opinion, the clean sands and gravels associated with the kame deposits have been removed from the subject site, with the remainder of the native soils being characterized as glacial till. Groundwater Groundwater was not encountered during our subsurface exploration on April 19, 2023, which were advanced to a maximum depth of about nine feet bgs. Groundwater seepage rates and elevations fluctuate depending on many factors, including precipitation duration and intensity, the time of year, and soil conditions. Groundwater seepage flow rates are typically higher during the winter, spring and early summer months. Therefore, perched groundwater seepage should be expected in site excavations, particularly if excavations are made in winter, spring and early summer months. GEOLOGIC HAZARD AREAS EVALUATION ESNW reviewed both RMC 4-3-050 and available map resources (depicting geologically hazardous areas), including the City of Renton (COR) interactive map. According to the referenced COR Map, medium landslide hazards, and regulated and/or protected slopes are all mapped within the subject site. The mapped hazards are largely associated with the overall hillslope complex incorporating the subject site and surrounding area. Schneider Family Homes, LLC ES-9182 August 8, 2023 Page 4 Earth Solutions NW, LLC Landslide Hazard Per RMC 4-3-050G5b, landslide hazard areas can be defined as: i. Low Landslide Hazard (LL): Areas with slopes less than 15 percent. ii. Medium Landslide Hazard (LM): Areas with slopes between 15 percent and 40 percent, underlain by soils that consist largely of sand, gravel, or glacial till. iii. High Landslide Hazards (LH): Areas with slopes greater than 40 percent and areas with slopes between 15 percent and 40 percent underlain by soils consisting largely of silt and clay. iv. Very High Landslide Hazards (LV): Areas of known mapped or identified landslide deposits. The referenced City Critical Areas Map designates a high landslide hazard on the eastern portion of the subject site, with a moderate landslide hazard area over the remainder of the site. Based on the referenced topographic survey, slopes on the subject site average a gradient of 60 percent. Within the northeast corner of the site, the slope gradients average approximately 130 percent. The areas of 130 percent slopes area a result of historical mining activities. During our visit we did not observe surficial signs of present or recent landslides. Based on COR map, publicly available resources provided by the Department of Natural Resources, and our site exploration, the subject site is correctly mapped as a medium to high landslide hazard area. Regulated Slopes According to RMC 4-3-050G5a, steep slopes may be categorized into two types: i. Sensitive Slopes: A hillside, or portion thereof (excluding engineering retaining walls), characterized by: a. An average slope of 25 percent to less than 40 percent, as identified in the City Steep Slope Atlas or in a method approved by the City; b. An average slope of 40 percent or greater, with a vertical rise of less than 15 feet, as identified in the City Steep Slope Atlas or in a method approved by the City, or; c. Abutting an average slope of 25 percent to 40 percent, as identified in the City Steep Slope Atlas or in a method approved by the City. ii. Protected Slopes: A hillside, or portion thereof, characterized by an average slope of 40 percent or greater grade and having a minimum vertical rise of 15 feet, as identified in the City Steep Slope Atlas or in a method approved by the City. Schneider Family Homes, LLC ES-9182 August 8, 2023 Page 5 Earth Solutions NW, LLC The referenced City Critical Areas Map designates the site as containing sensitive slopes. Based on the moderately steep nature of the site gradients, it is our opinion that the designations of sensitive and/or protected slopes on site may be impacted by the proposed project from a geotechnical standpoint. Final grading plans were not available at the time of this report production. ESNW recommends a qualitative slope analysis of the subject site be completed to better evaluate the impacts of proposed short plat based on the current versus proposed site layout. This analysis will require both the existing site survey with topographic information included as well as a final grading plan with topography and lot layout to aid in the modeling of the grading and surcharge conditions being proposed. DISCUSSION AND RECOMMENDATIONS General Based on the results of our investigation, the construction of the proposed short plat is feasible from a geotechnical standpoint given the results of a subsequent slope stability analysis is completed which demonstrates adequate factors of safety for the pre- and post-development site conditions. The primary geotechnical considerations associated with the proposed development include the suitability of site grading and surcharge conditions resulting from re-development, using on-site soil as structural fill, foundation support, and slab-on-grade support. ESNW recommends that a qualitative analysis of the high landslide hazard portions of the site be completed to assess the impacts of the proposed short plat. In our opinion, the proposed residential structures can be supported on a conventional spread and continuous footing system bearing on undisturbed competent native soil, compacted native soil, or new structural fill. We anticipate competent native soil suitable for support of foundations will be encountered at the typical footing subgrade excavation depth (roughly 18 to 24 inches below grade). Where loose or unsuitable soil conditions are encountered at foundation subgrade elevations, compaction of the soils to the specifications of structural fill or overexcavation and replacement with suitable structural fill will likely be necessary. An ESNW representative should be contacted to confirm suitability of the foundation subgrade at the time of construction. As indicated in the Subsurface section of this report, the native soil encountered during our fieldwork was characterized as glacial till. Based on the existing topography of the subject site and surrounding areas, infiltration, from a geotechnical standpoint, should be considered infeasible. Site Preparation and Earthwork Initial site preparation activities will consist of installing temporary erosion control measures, establishing grading limits, performing of clearing and site stripping, and fill placement. As the site is sloped in nature, fill placed on slopes must be placed on level benches excavated into the existing grade. ESNW has provided a detail demonstrating the suitable approach to placement of fill on slopes (Plate 5). Subsequent earthwork activities will involve site grading and related infrastructure improvements. Schneider Family Homes, LLC ES-9182 August 8, 2023 Page 6 Earth Solutions NW, LLC Temporary Erosion Control The following TESC Best Management Practices (BMPs) are offered:  Temporary construction entrances and drive lanes, consisting of at least six inches of quarry spalls, should be considered to both minimize off-site soil tracking and provide a stable access entrance surface. Placing geotextile fabric underneath the quarry spalls will provide greater stability, if needed.  Silt fencing should be placed around the construction site perimeter.  When not in use, soil stockpiles should be covered or otherwise protected.  Temporary measures for controlling surface water runoff, such as interceptor trenches, sumps, or swales, should be installed prior to beginning earthwork activities.  Dry soils disturbed during construction should be wetted to minimize dust and airborne soil erosion.  When appropriate, permanent planting or hydroseeding will help to stabilize on-site soil. Additional TESC BMPs, as specified by the project civil engineer and indicated on the plans, should be incorporated into construction activities. TESC BMPs may be modified during construction as site conditions require and as approved by the site erosion control lead. Stripping Topsoil was observed to be within the upper approximately 6 to 12 inches of existing grades at the test pit locations. Organic-rich topsoil should be stripped and segregated into a stockpile either for later use on site or to be exported. Excavations and Slopes Excavation activities on site are likely to expose medium dense to dense native soil within the upper two and one-half feet to five feet of existing grades. Based on the soil conditions observed at the test locations, the following maximum allowable temporary slope inclinations may be used. The applicable Federal Occupation Safety and Health Administration and Washington Industrial Safety and Health Act soil classifications are also provided:  Areas exposing groundwater seepage 1.5H:1V (Type C)  Loose soil 1.5H:1V (Type C)  Medium dense native soil 1H:1V (Type B)  Dense to very dense “hardpan” native soil 0.75H:1V (Type A) Schneider Family Homes, LLC ES-9182 August 8, 2023 Page 7 Earth Solutions NW, LLC Permanent slopes should be planted with vegetation to both enhance stability and minimize erosion and should maintain a gradient of 2H:1V or flatter. The presence of perched groundwater may cause localized sloughing of temporary slopes. An ESNW representative should observe temporary and permanent slopes to confirm the slope inclinations are suitable for the exposed soil conditions and to provide additional excavation and slope recommendations, as necessary. If the recommended temporary slope inclinations cannot be achieved, temporary shoring may be necessary to support excavations. In-situ and Imported Soil The on-site soil is moisture sensitive, and successful use of the on-site soil as structural fill will largely be dictated by the moisture content at the time of placement and compaction. Remedial measures may be necessary as part of site grading and earthwork activities. If the on-site soil cannot be successfully compacted, the use of an imported soil may be necessary. In our opinion, a contingency should be provided in the project budget for the export of soil that cannot be successfully compacted as structural fill, particularly if grading activities take place during periods of rainfall. In general, soils with appreciable fines contents (greater than 5 percent) typically degrade rapidly when exposed to periods of rainfall. Imported soil intended for use as structural fill should consist of a well-graded, granular soil with a moisture content that is at (or slightly above) the optimum level. During wet weather conditions, imported soil intended for use as structural fill should consist of a well-graded, granular soil with a fines content of 5 percent or less (where the fines content is defined as the percent passing the Number 200 sieve, based on the minus three-quarter-inch fraction). Structural Fill Structural fill is defined as compacted soil placed in foundation, slab-on-grade, roadway, permanent slope, retaining wall, and utility trench backfill areas. Structural fill placed and compacted during site grading activities should meet the following specifications and guidelines:  Structural fill material Granular soil*  Moisture content At or slightly above optimum**  Relative compaction (minimum) 95 percent (Modified Proctor)  Loose lift thickness (maximum) 12 inches * The existing soil may not be suitable for use as structural fill unless the soil is at (or slightly above) the optimum moisture content at the time of placement and compaction. ** Soil shall not be placed dry of optimum and should be evaluated by ESNW during construction. With respect to underground utility installations and backfill, local jurisdictions may dictate the soil type(s) and compaction requirements. Areas of otherwise unsuitable material and debris should be removed from structural areas and replaced with structural fill. Schneider Family Homes, LLC ES-9182 August 8, 2023 Page 8 Earth Solutions NW, LLC Foundations The proposed residential structures can be supported on a conventional spread and continuous footing system bearing on undisturbed competent native soil, native soil compacted in-place, or new structural fill. We anticipate competent native soil suitable for support of foundations will be encountered at the typical footing subgrade excavation depth (roughly 18 to 24 inches below grade). The exception to this general statement of subgrade suitability is where existing fill was observed at test location TP-4 to a depth of four and one-half feet. The fill observed at TP-4 will need to be removed and replaced to a depth below the observed topsoil at three feet. This material should be replaced following compaction of the material left in-place following the overexcavation of fill. Where loose or unsuitable soil conditions are encountered at foundation subgrade elevations, compaction of the soils to the specifications of structural fill or overexcavation and replacement with suitable structural fill will likely be necessary. An ESNW representative should be contacted to confirm suitability of the foundation subgrade at the time of construction. Provided the structure will be supported as described above, the following parameters may be used for design of the new foundations:  Allowable soil bearing capacity 2,500 psf  Passive earth pressure 300 pcf  Coefficient of friction 0.40 A one-third increase in the allowable soil bearing capacity may be assumed for short-term wind and seismic loading conditions. The passive earth pressure and coefficient of friction values include a safety factor of 1.5. With structural loading as expected, total settlement in the range of one inch is anticipated, with differential settlement of about one-half inch. Most of the anticipated settlement should occur during construction as dead loads are applied. Schneider Family Homes, LLC ES-9182 August 8, 2023 Page 9 Earth Solutions NW, LLC Preliminary Seismic Design Considerations The 2018 International Building Code (2018 IBC) recognizes the most recent edition of the Minimum Design Loads for Buildings and Other Structures manual (ASCE 7-16) for seismic design, specifically with respect to earthquake loads. Based on the soil conditions encountered at the test pit locations, the parameters and values provided below are recommended for seismic design per the 2018 IBC. Parameter Value Site Class D* Mapped short period spectral response acceleration, SS (g) 1.385 Mapped 1-second period spectral response acceleration, S1 (g) 0.472 Short period site coefficient, Fa 1.0 Long period site coefficient, Fv 1.828** Adjusted short period spectral response acceleration, SMS (g) 1.385 Adjusted 1-second period spectral response acceleration, SM1 (g) 0.863** Design short period spectral response acceleration, SDS (g) 0.923 Design 1-second period spectral response acceleration, SD1 (g) 0.575** * Assumes medium dense to dense native soil conditions, encountered to a maximum depth of nine feet bgs during the April 2023 field exploration, remain medium dense or better to at least 100 feet bgs. ** Values assume Fv may be determined using linear interpolation per Table 11.4-2 in ASCE 7-16. As indicated in the table footnote, several of the seismic design values provided above are dependent on the assumption that site-specific ground motion analysis (per Section 11.4.8 of ASCE 7-16) will not be required for the subject project. ESNW recommends the validity of this assumption be confirmed at the earliest available opportunity during the planning and early design stages of the project. Further discussion between the project structural engineer, the project owner, and ESNW may be prudent to determine the possible impacts to the structural design due to increased earthquake load requirements under the 2018 IBC. ESNW can provide additional consulting services to aid with design efforts, including supplementary geotechnical and geophysical investigation, upon request. Liquefaction is a phenomenon where saturated or loose soil suddenly loses internal strength and behaves as a fluid. This behavior is in response to increased pore water pressures resulting from an earthquake or another intense ground shaking. In our opinion, site susceptibility to liquefaction may be considered low. The relatively dense characteristics of the native soil and the lack of an established, shallow groundwater table were the primary bases for this opinion. Schneider Family Homes, LLC ES-9182 August 8, 2023 Page 10 Earth Solutions NW, LLC Slab-on-Grade Floors Slab-on-grade floors for the proposed residential structures should be supported on firm and unyielding subgrades. Unstable or yielding subgrade areas should be recompacted or overexcavated and replaced with suitable structural fill prior to slab construction. A capillary break consisting of a minimum of four inches of free-draining crushed rock or gravel should be placed below each slab. The free-draining material should have a fines content of 5 percent or less (percent passing the Number 200 sieve, based on the minus three-quarter-inch fraction). In areas where slab moisture is undesirable, installation of a vapor barrier below the slab should be considered. If a vapor barrier is to be utilized, it should be a material specifically designed for use as a vapor barrier and should be installed per manufacturer specifications. Retaining Walls Retaining walls must be designed to resist earth pressures and applicable surcharge loads. The following parameters may be used for design:  Active earth pressure (unrestrained condition) 35 pcf (equivalent fluid)  At-rest earth pressure (restrained condition) 55 pcf  Traffic surcharge* (passenger vehicles) 70 psf (rectangular distribution)  Passive earth pressure 300 pcf (equivalent fluid)  Coefficient of friction 0.40  Seismic surcharge 8H psf** * Where applicable. ** Where H equals the retained height (in feet). The above design parameters are based on a level backfill condition and level grade at the wall toe. Revised design values will be necessary if sloping grades are to be used above or below retaining walls. Additional surcharge loading from adjacent foundations, sloped backfill, or other relevant loads should be included in the retaining wall design. Retaining walls should be backfilled with free-draining material that extends along the height of the wall and a distance of at least 18 inches behind the wall. The upper 12 inches of the wall backfill may consist of a less permeable soil, if desired. A perforated drainpipe should be placed along the base of the wall and connected to an approved discharge location. A typical retaining wall drainage detail is provided on Plate 3. If drainage is not provided, hydrostatic pressures should be included in the wall design. Schneider Family Homes, LLC ES-9182 August 8, 2023 Page 11 Earth Solutions NW, LLC Drainage Based on our field observations, groundwater seepage should be anticipated within site excavations. Temporary measures to control surface water runoff and groundwater seepage during construction will be critical to minimizing the potential for on-site soils to degrade. ESNW should be consulted during preliminary grading to identify areas of seepage and provide recommendations to reduce the potential for seepage-related instability. Finish grades must be designed to direct surface drain water away from structures and slopes. Water must not be allowed to pond adjacent to structures or slopes. Grades adjacent to buildings should be sloped away from the buildings at a gradient of either at least 2 percent for a horizontal distance of 10 feet or the maximum allowed by adjacent structures. In our opinion, foundation drains should be installed along building perimeter footings. A typical foundation drain detail is provided on Plate 4. Preliminary Infiltration Feasibility As indicated in the Subsurface section of this report, the native soil encountered during our fieldwork was characterized as glacial till. Dense, unweathered and weakly cemented glacial till, was encountered on the subject site at depths of roughly three to six feet bgs. In our experience, dense glacial till generally exhibits zero infiltration capacity. The unweathered glacial till represents a confining layer of soil which adequate vertical separation from which must be maintained for infiltrative measures to function as anticipated. The prescribed vertical separation from the confining layer will be difficult to maintain in this instance based on the depth at which the unweathered glacial till was observed and the mandated minimum depth of infiltrative measures. As stated in Geologic Hazard Areas Evaluation in the report, a large portion of the subject site is delineated as containing sensitive slopes. An increase in the volumes of stormwater infiltrating into the subsurface on the subject site could result in slope destabilization. In our opinion, the subject site should be considered infeasible for infiltration. Due to the presence of unweathered glacial till, infiltration on the subject site would be limited to low-flow infiltration systems. Any infiltration on the subject site has the potential to negatively impact the sensitive slopes present on site. We recommend that no infiltration be pursued for the subject site, in our opinion, any infiltration system has the potential to result in lateral movement of infiltrated water, and negatively impact the subject site and downslope properties. Preliminary Stormwater Vault Design We understand a stormwater vault is under consideration for on-site stormwater management. Vault foundations should be supported on competent native soil or crushed rock placed atop competent native soil. Final stormwater vault designs must incorporate adequate buffer space from property boundaries such that temporary excavations to construct the vault structure can be successfully completed. Perimeter drains should be installed around the vault and conveyed to an approved discharge point. The presence of perched groundwater seepage should be anticipated during excavation activities for the vault. Schneider Family Homes, LLC ES-9182 August 8, 2023 Page 12 Earth Solutions NW, LLC The following parameters can be used for stormwater vault design:  Allowable soil bearing capacity (dense native soil) 5,000 psf  Active earth pressure (unrestrained) 35 pcf  Active earth pressure (unrestrained, hydrostatic) 80 pcf  At-rest earth pressure (restrained) 55 pcf  At-rest earth pressure (restrained, hydrostatic) 100 pcf  Coefficient of friction 0.40  Passive earth pressure 300 pcf  Seismic surcharge 8H* * Where H equals the retained height. Retaining walls should be backfilled with free-draining material or suitable sheet drainage that extends along the height of the walls. The upper one foot of the wall backfill can consist of a less permeable soil, if desired. A perforated drain pipe should be placed along the base of the wall and connected to an approved discharge location. If the elevation of the vault bottom is such that gravity flow to an outlet is not possible, the portion of the vault below the drain should be designed to include hydrostatic pressure. Design values accounting for hydrostatic pressure are included above. The above passive earth pressure and coefficient of friction values include a safety factor of 1.5. ESNW should observe grading operations for the vault and the subgrade conditions prior to concrete forming and pouring to confirm conditions are as anticipated, and to provide supplemental recommendations as necessary. Additionally, ESNW should be contacted to review final vault designs to confirm that appropriate geotechnical parameters have been incorporated. Preliminary Pavement Sections The performance of site pavements is largely related to the condition of the underlying subgrade. To ensure adequate pavement performance, the subgrade should be in a firm and unyielding condition when subjected to proofrolling with a loaded dump truck. Structural fill in pavement areas should be compacted to the specifications previously detailed in this report. Soft, wet, or otherwise unsuitable subgrade areas may still exist after base grading activities. Areas containing unsuitable or yielding subgrade conditions will require remedial measures, such as overexcavation and/or placement of thicker crushed rock or structural fill sections, prior to pavement. Schneider Family Homes, LLC ES-9182 August 8, 2023 Page 13 Earth Solutions NW, LLC We anticipate new pavement sections will be subjected primarily to passenger vehicle traffic. For lightly loaded pavement areas subjected primarily to passenger vehicles, the following preliminary pavement sections may be considered:  A minimum of two inches of hot-mix asphalt (HMA) placed over four inches of crushed rock base (CRB).  A minimum of two inches of HMA placed over three inches of asphalt-treated base (ATB). Heavier traffic areas generally require thicker pavement sections depending on site usage, pavement life expectancy, and site traffic. For preliminary design purposes, the following pavement sections for occasional truck traffic and access roadways may be considered:  Three inches of HMA placed over six inches of CRB, or;  Three inches of HMA placed over four and one-half inches of ATB. The HMA, ATB, and CRB materials should conform to WSDOT and/or City of Renton specifications. All soil base material should be compacted to a relative compaction of 95 percent, based on the laboratory maximum dry density as determined by ASTM D1557. Final pavement design recommendations, including recommendations for heavy traffic areas, access roads, and frontage improvement areas, can be provided once final traffic loading has been determined. Road standards utilized by the City of Renton may supersede the recommendations provided in this report. If an inverted crown will be used for roadway surfaces, drainage measures should be included in the design to prevent accumulation of water in the subgrade adjacent to catch basins. Such measures should consist of finger drains extending from the catch basins. Utility Support and Trench Backfill In our opinion, the on-site soil will generally be suitable for support of utilities. Remedial measures may be necessary in some areas to provide support for utilities, such as overexcavation and replacement with structural fill or placement of geotextile fabric. Groundwater seepage may be encountered within utility excavations, and caving of trench walls may occur where groundwater or unsuitable fill are encountered. Depending on the time of year and conditions encountered, dewatering or temporary trench shoring may be necessary during utility excavation and installation. The on-site soil may not be suitable for use as structural backfill throughout utility trench excavations unless the soil is at (or slightly above) the optimum moisture content at the time of placement and compaction. Moisture conditioning of the soil may be necessary at some locations prior to use as structural fill. Each section of the utility lines must be adequately supported in the bedding material. Utility trench backfill should be placed and compacted to the structural fill specifications previously detailed in this report or to the applicable specifications of the presiding jurisdiction. Schneider Family Homes, LLC ES-9182 August 8, 2023 Page 14 Earth Solutions NW, LLC LIMITATIONS This study has been prepared for the exclusive use of Schneider Family Homes, LLC, and their representatives. The recommendations and conclusions provided in this study are professional opinions consistent with the level of care and skill that is typical of other members in the profession currently practicing under similar conditions in this area. No warranty, express or implied, is made. Variations in the subsurface conditions observed at the test pit locations may exist and may not become evident until construction. ESNW should reevaluate the conclusions provided in this study if variations are encountered. Additional Services ESNW should have an opportunity to review the final design with respect to the geotechnical recommendations provided in this report. ESNW should also be retained to provide testing and consultation services during construction. Geotechnical Engineering,Construction Observation/Testing and Environmental Services Drawn MRS Checked SES Date May 2023 Date 05/15/2023 Proj.No.9182 Plate 1 Earth Solutions NWLLCEarthSolutionsNWLLC EarthSolutions NW LLC Vicinity Map Talbot Hills Short Plat Renton,Washington Reference: King County,Washington OpenStreetMap.org NORTH NOTE:This plate may contain areas of color.ESNW cannot be responsible for any subsequent misinterpretation of the information resulting from black &white reproductions of this plate. SITE Renton Kent Plate Proj.No. Date Checked Drawn Earth Solutions NWLLC Geotechnical Engineering, Construction Observation/Testing and Environmental Services Earth Solutions NWLLC Earth Solutions NW LLC MRS SES 05/12/2023 9182 2 Test Pit Location Plan Talbot Hills Short Plat Renton, Washington NORTH NOT -TO -SCALE NOTE:This plate may contain areas of color.ESNW cannot be responsible for any subsequent misinterpretation of the information resulting from black &white reproductions of this plate. NOTE:The graphics shown on this plate are not intended for design purposes or precise scale measurements,but only to illustrate the approximate test locations relative to the approximate locations of existing and /or proposed site features.The information illustrated is largely based on data provided by the client at the time of our study.ESNW cannot be responsible for subsequent design changes or interpretation of the data by others. LEGEND Approximate Location of ESNW Test Pit,Proj.No. ES-9182,April 2023 Subject Site Existing Building TP-1 TP-1 TP-2 TP-3 TP-4 TP-5 TP-6 270 280 290 260 250240 230 270 280 290 260250240230 220 220 S.55TH STREET S. 55TH STREET Geotechnical Engineering,Construction Observation/Testing and Environmental Services Drawn MRS Checked SES Date May 2023 Date 05/14/2023 Proj.No.9182 Plate 3 Earth Solutions NWLLCEarthSolutionsNWLLC EarthSolutions NW LLC NOTES: Free-draining Backfill should consist of soil having less than 5 percent fines. Percent passing No.4 sieve should be 25 to 75 percent. Sheet Drain may be feasible in lieu of Free-draining Backfill,per ESNW recommendations. Drain Pipe should consist of perforated, rigid PVC Pipe surrounded with 1-inch Drain Rock. LEGEND: Free-draining Structural Backfill 1-inch Drain Rock 18"Min. Structural Fill Perforated Rigid Drain Pipe (Surround in Drain Rock) SCHEMATIC ONLY -NOT TO SCALE NOT A CONSTRUCTION DRAW ING Retaining Wall Drainage Detail Talbot Hills Short Plat Renton,Washington Geotechnical Engineering,Construction Observation/Testing and Environmental Services Drawn MRS Checked SES Date May 2023 Date 05/14/2023 Proj.No.9182 Plate 4 Earth Solutions NWLLCEarthSolutionsNWLLC EarthSolutions NW LLC Slope Perforated Rigid Drain Pipe (Surround in Drain Rock) 18"Min. NOTES: Do NOT tie roof downspouts to Footing Drain. Surface Seal to consist of 12"of less permeable,suitable soil.Slope away from building. LEGEND: Surface Seal:native soil or other low-permeability material. 1-inch Drain Rock SCHEMATIC ONLY -NOT TO SCALE NOT A CONSTRUCTION DRAW ING Footing Drain Detail Talbot Hills Short Plat Renton,Washington Drawn CAM Checked SHA Date June 2023 Date 06/15/2023 Proj.No.9182 Plate 5 Geotechnical Engineering,Construction Observation/Testing and Environmental Services Earth Solutions NWLLCEarthSolutionsNWLLC EarthSolutions NW LLC SCHEMATIC ONLY -NOT TO SCALE NOT A CONSTRUCTION DRAW ING NOTES: Slope should be stripped of topsoil and unsuitable materials prior to excavating Keyway or benches. Benches will typically be equal to a bulldozer blade width of approximately 8 feet but shall be at least 4 feet. Final slope gradient should be 2H :1V. Final slope face should be densified by over-building with compacted fill and trimming back to shape or by compaction with a bulldozer or vibratory drum roller. Planting or hydroseeding slope face with a rapid growth deep-rooted vegetative mat will reduce erosion potential of slope area. Use of pegged-in-place jute matting or geotechnical fabric will help maintain the seed and mulch in place until the root system has an opportunity to germinate. Structural fill should be placed in thin loose lifts not exceeding 12 inches in thickness. Each lift should be compacted to no less than the degree specified in the “Site Preparation and Earthwork”section of this report.No additional lift should be placed until compaction is achieved. 2 1 Final Slope Gradient Compacted Slope Face Existing Grade Typical “Bench” Keyed into Existing Slope Face (Geotechnical Engineer to Confirm) “Key” (Minimum 2'Deep by 6'W ide) Bench and Keyway Fill to consist of suitable granular material approved by the Geotechnical Engineer Drainage measures (blanket drain,toe drain, bench drain,etc.)may be necessary as recommended by the Geotechnical Engineer during construction Slope Fill Detail Talbot Hills Short Plat Renton,Washington Earth Solutions NW, LLC Appendix A Subsurface Exploration Test Pit Logs ES-9182 Subsurface conditions at the subject site were explored on April 19, 2023. Six test pits were excavated using a mini-trackhoe and operator provided by the client. The approximate locations of the test pits are illustrated on Plate 2 of this study. The test pit logs are provided in this Appendix. The maximum exploration depth was approximately nine feet bgs. The final logs represent the interpretations of the field logs and the results of laboratory analyses. The stratification lines on the logs represent the approximate boundaries between soil types. In actuality, the transitions may be more gradual. > 12% Fines < 5% Fines Highly Organic Soils Silts and Clays Liquid Limit 50 or More Silts and Clays Liquid Limit Less Than 50 Fine-Grained Soils - 50% or More Passes No. 200 Sieve Coarse-Grained Soils - More Than 50% Retained on No. 200 Sieve Sands - 50% or More of Coarse Fraction Passes No. 4 Sieve Gravels - More Than 50% of Coarse Fraction Retained on No. 4 Sieve > 12% Fines < 5% Fines GW GP GM GC SW SP SM SC ML CL OL MH CH OH PT Well-graded gravel with or without sand,little to no fines Poorly graded gravel with or without sand,little to no fines Silty gravel with or without sand Clayey gravel with or without sand Well-graded sand with or without gravel,little to no fines Poorly graded sand with or without gravel,little to no fines Silty sand with or without gravel Clayey sand with or without gravel Silt with or without sand or gravel;sandy or gravelly silt Clay of low to medium plasticity;lean clay with or without sand or gravel; sandy or gravelly lean clay Organic clay or silt of low plasticity Elastic silt with or without sand or gravel;sandy or gravelly elastic silt Clay of high plasticity; fat clay with or without sand or gravel;sandy or gravelly fat clay Organic clay or silt of medium to high plasticity Peat,muck,and other highly organic soils EEaarrtthh SSoolluuttiioonnss NNWW LLC Geotechnical Engineering,Construction Observation/Testing and Environmental Services EXPLORATION LOG KEY Fill FILL Made Ground Classifications of soils in this geotechnical report and as shown on the exploration logs are based on visual field and/or laboratory observations,which include density/consistency,moisture condition,grain size,and plasticity estimates,and should not be construed to imply field or laboratory testing unless presented herein. Visual-manual and/or laboratory classification methods of ASTM D2487 and D2488 were used as an identification guide for the Unified Soil Classification System. Terms Describing Relative Density and Consistency Coarse-Grained Soils: Fine-Grained Soils: SPT blows/foot SPT blows/foot Test Symbols &Units Fines =Fines Content (%) MC =Moisture Content (%) DD =Dry Density (pcf) Str =Shear Strength (tsf) PID =Photoionization Detector (ppm) OC =Organic Content (%) CEC =Cation Exchange Capacity (meq/100 g) LL =Liquid Limit (%) PL =Plastic Limit (%) PI =Plasticity Index (%) Component Definitions Descriptive Term Size Range and Sieve Number Smaller than No.200 (0.075 mm) Boulders Modifier Definitions Percentage by Weight (Approx.) <5 5 to 14 15 to 29 >30_ Modifier Trace (sand,silt,clay,gravel) Slightly (sandy,silty,clayey,gravelly) Sandy,silty,clayey,gravelly Very (sandy,silty,clayey,gravelly) Moisture Content Dry -Absence of moisture,dusty,dry to the touch Damp -Perceptible moisture,likely below optimum MC Moist -Damp but no visible water,likely at/near optimum MC Wet -Water visible but not free draining, likely above optimum MC Saturated/Water Bearing -Visible free water,typically below groundwater table Symbols Cement grout surface seal Bentonite chips Grout seal Filter pack with blank casing section Screened casing or Hydrotip with filter pack End cap ATD =At time of drilling Static water level (date) _>50 Density Very Loose Loose Medium Dense Dense Very Dense Consistency Very Soft Soft Medium Stiff Stiff Very Stiff Hard <4 4 to 9 10 to 29 30 to 49 <2 2 to 3 4 to 7 8 to 14 15 to 29 _>30 LLC EarthSolutions NW LLC Cobbles Gravel Coarse Gravel Fine Gravel Sand Coarse Sand Medium Sand Fine Sand Silt and Clay Larger than 12" 3"to 12" 3"to No.4 (4.75 mm) 3"to 3/4" 3/4"to No.4 (4.75 mm) No.4 (4.75 mm)to No.200 (0.075 mm) No.4 (4.75 mm)to No.10 (2.00 mm) No.10 (2.00 mm)to No.40 (0.425 mm) No.40 (0.425 mm)to No.200 (0.075 mm) MC = 15.9 MC = 10.0 MC = 13.8 MC = 16.0 Fines = 45.4 TPSL SM Dark brown TOPSOIL, root intrusions to 2' Brown silty SAND, medium dense, moist -becomes gray, damp [USDA Classification: slightly gravelly fine sandy LOAM] Test pit terminated at 8.5 feet below existing grade. No groundwater encountered during excavation. No caving observed. LIMITATIONS: Ground elevation (if listed) is approximate; the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum. Do not rely on this test log as a standalone document. Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. 1.0 8.5 SA M P L E T Y P E NU M B E R DE P T H (f t ) 0.0 2.5 5.0 7.5 PAGE 1 OF 1 TEST PIT NUMBER TP-1 EXCAVATION CONTRACTOR Client Provided DATE STARTED 4/19/23 COMPLETED 4/19/23 GROUND WATER LEVEL: GROUND ELEVATION LATITUDE 47.43044 LONGITUDE -122.2092 LOGGED BY SES CHECKED BY SHA NOTES SURFACE CONDITIONS Duff AT TIME OF EXCAVATIONAT TIME OF EXCAVATION AFTER EXCAVATION PROJECT NUMBER ES-9182 PROJECT NAME Talbot Hills Short Plat GE N E R A L B H / T P / W E L L - 9 1 8 2 . G P J - G I N T U S . G D T - 8 / 8 / 2 3 Earth Solutions NW, LLC 15365 N.E. 90th Street, Suite 100 Redmond, Washington 98052 Telephone: 425-449-4704 Fax: 425-449-4711 TESTS U. S . C . S . MATERIAL DESCRIPTION GR A P H I C LO G MC = 8.9 Fines = 9.6 MC = 15.2 MC = 15.4 TPSL SP- SM SM Dark brown TOPSOIL, root intrusions to 3' Brown poorly graded SAND with silt and gravel, medium dense, damp [USDA Classification: very gravelly loamy SAND] Gray silty SAND with gravel, dense, damp -weakly cemented Test pit terminated at 7.0 feet below existing grade. No groundwater encountered during excavation. No caving observed. LIMITATIONS: Ground elevation (if listed) is approximate; the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum. Do not rely on this test log as a standalone document. Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. 0.5 4.0 7.0 SA M P L E T Y P E NU M B E R DE P T H (f t ) 0.0 2.5 5.0 PAGE 1 OF 1 TEST PIT NUMBER TP-2 EXCAVATION CONTRACTOR Client Provided DATE STARTED 4/19/23 COMPLETED 4/19/23 GROUND WATER LEVEL: GROUND ELEVATION LATITUDE 47.43079 LONGITUDE -122.20919 LOGGED BY SES CHECKED BY SHA NOTES SURFACE CONDITIONS Duff AT TIME OF EXCAVATIONAT TIME OF EXCAVATION AFTER EXCAVATION PROJECT NUMBER ES-9182 PROJECT NAME Talbot Hills Short Plat GE N E R A L B H / T P / W E L L - 9 1 8 2 . G P J - G I N T U S . G D T - 8 / 8 / 2 3 Earth Solutions NW, LLC 15365 N.E. 90th Street, Suite 100 Redmond, Washington 98052 Telephone: 425-449-4704 Fax: 425-449-4711 TESTS U. S . C . S . MATERIAL DESCRIPTION GR A P H I C LO G MC = 15.3 MC = 12.7 TPSL SM Dark brown TOPSOIL Brown silty SAND, medium dense, damp -becomes gray, dense -weakly cemented Test pit terminated at 8.0 feet below existing grade. No groundwater encountered during excavation. No caving observed. LIMITATIONS: Ground elevation (if listed) is approximate; the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum. Do not rely on this test log as a standalone document. Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. 1.0 8.0 SA M P L E T Y P E NU M B E R DE P T H (f t ) 0.0 2.5 5.0 7.5 PAGE 1 OF 1 TEST PIT NUMBER TP-3 EXCAVATION CONTRACTOR Client Provided DATE STARTED 4/19/23 COMPLETED 4/19/23 GROUND WATER LEVEL: GROUND ELEVATION LATITUDE 47.43052 LONGITUDE -122.20957 LOGGED BY SES CHECKED BY SHA NOTES SURFACE CONDITIONS Duff AT TIME OF EXCAVATIONAT TIME OF EXCAVATION AFTER EXCAVATION PROJECT NUMBER ES-9182 PROJECT NAME Talbot Hills Short Plat GE N E R A L B H / T P / W E L L - 9 1 8 2 . G P J - G I N T U S . G D T - 8 / 8 / 2 3 Earth Solutions NW, LLC 15365 N.E. 90th Street, Suite 100 Redmond, Washington 98052 Telephone: 425-449-4704 Fax: 425-449-4711 TESTS U. S . C . S . MATERIAL DESCRIPTION GR A P H I C LO G MC = 21.1 MC = 16.0 Fines = 34.8 MC = 19.1 SM SM Brown silty SAND with gravel, medium dense, wet (Fill) -sparse topsoil in mixture Brown silty SAND with gravel, dense, moist -weakly cemented [USDA Classification: gravelly fine sandy LOAM] -becomes gray, very dense Test pit terminated at 9.0 feet below existing grade. No groundwater encountered during excavation. No caving observed. LIMITATIONS: Ground elevation (if listed) is approximate; the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum. Do not rely on this test log as a standalone document. Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. 4.5 9.0 SA M P L E T Y P E NU M B E R DE P T H (f t ) 0.0 2.5 5.0 7.5 PAGE 1 OF 1 TEST PIT NUMBER TP-4 EXCAVATION CONTRACTOR Client Provided DATE STARTED 4/19/23 COMPLETED 4/19/23 GROUND WATER LEVEL: GROUND ELEVATION LATITUDE 47.43093 LONGITUDE -122.20975 LOGGED BY SES CHECKED BY SHA NOTES SURFACE CONDITIONS Duff/fill AT TIME OF EXCAVATIONAT TIME OF EXCAVATION AFTER EXCAVATION PROJECT NUMBER ES-9182 PROJECT NAME Talbot Hills Short Plat GE N E R A L B H / T P / W E L L - 9 1 8 2 . G P J - G I N T U S . G D T - 8 / 8 / 2 3 Earth Solutions NW, LLC 15365 N.E. 90th Street, Suite 100 Redmond, Washington 98052 Telephone: 425-449-4704 Fax: 425-449-4711 TESTS U. S . C . S . MATERIAL DESCRIPTION GR A P H I C LO G MC = 13.6 MC = 17.0 Fines = 44.9 TPSL SM Dark brown TOPSOIL, minimal root intrusions Brown silty SAND with gravel, medium dense, moist -becomes dense to very dense [USDA Classification: slightly gravelly fine sandy LOAM] Test pit terminated at 7.5 feet below existing grade. No groundwater encountered during excavation. No caving observed. LIMITATIONS: Ground elevation (if listed) is approximate; the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum. Do not rely on this test log as a standalone document. Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. 0.5 7.5 SA M P L E T Y P E NU M B E R DE P T H (f t ) 0.0 2.5 5.0 7.5 PAGE 1 OF 1 TEST PIT NUMBER TP-5 EXCAVATION CONTRACTOR Client Provided DATE STARTED 4/19/23 COMPLETED 4/19/23 GROUND WATER LEVEL: GROUND ELEVATION LATITUDE 47.43078 LONGITUDE -122.2099 LOGGED BY SES CHECKED BY SHA NOTES SURFACE CONDITIONS Duff AT TIME OF EXCAVATIONAT TIME OF EXCAVATION AFTER EXCAVATION PROJECT NUMBER ES-9182 PROJECT NAME Talbot Hills Short Plat GE N E R A L B H / T P / W E L L - 9 1 8 2 . G P J - G I N T U S . G D T - 8 / 8 / 2 3 Earth Solutions NW, LLC 15365 N.E. 90th Street, Suite 100 Redmond, Washington 98052 Telephone: 425-449-4704 Fax: 425-449-4711 TESTS U. S . C . S . MATERIAL DESCRIPTION GR A P H I C LO G MC = 14.5 MC = 15.8 MC = 14.2 TPSL SM Dark brown TOPSOIL, minimal root intrusions Brown silty SAND, medium dense, moist Test pit terminated at 8.0 feet below existing grade. No groundwater encountered during excavation. No caving observed. LIMITATIONS: Ground elevation (if listed) is approximate; the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum. Do not rely on this test log as a standalone document. Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. 0.5 8.0 SA M P L E T Y P E NU M B E R DE P T H (f t ) 0.0 2.5 5.0 7.5 PAGE 1 OF 1 TEST PIT NUMBER TP-6 EXCAVATION CONTRACTOR Client Provided DATE STARTED 4/19/23 COMPLETED 4/19/23 GROUND WATER LEVEL: GROUND ELEVATION LATITUDE 47.43051 LONGITUDE -122.20992 LOGGED BY SES CHECKED BY SHA NOTES SURFACE CONDITIONS Duff AT TIME OF EXCAVATIONAT TIME OF EXCAVATION AFTER EXCAVATION PROJECT NUMBER ES-9182 PROJECT NAME Talbot Hills Short Plat GE N E R A L B H / T P / W E L L - 9 1 8 2 . G P J - G I N T U S . G D T - 8 / 8 / 2 3 Earth Solutions NW, LLC 15365 N.E. 90th Street, Suite 100 Redmond, Washington 98052 Telephone: 425-449-4704 Fax: 425-449-4711 TESTS U. S . C . S . MATERIAL DESCRIPTION GR A P H I C LO G Earth Solutions NW, LLC Appendix B Laboratory Test Results ES-9182 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 3 D100 140 Specimen Identification 1 fine 6 HYDROMETER 304 45.4 9.6 34.8 44.9 101/2 COBBLES Specimen Identification 4 coarse 20 401.5 8 14 USDA: Gray Slightly Gravelly Fine Sandy Loam. USCS: SM. USDA: Brown Very Gravelly Loamy Sand. USCS: SP-SM with Gravel. USDA: Gray Gravelly Fine Sandy Loam. USCS: SM with Gravel. USDA: Brown Slightly Gravelly Fine Sandy Loam. USCS: SM. 6 60 PE R C E N T F I N E R B Y W E I G H T D10 0.331 0.169 7.171 0.296 0.178 GRAIN SIZE DISTRIBUTION 100 91.19 LL TP-01 TP-02 TP-04 TP-05 0.079 3/4 U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS GRAVEL SAND 19 37.5 37.5 19 %Silt 0.19 TP-01 TP-02 TP-04 TP-05 2 2003 Cc CuClassification %Clay 16 PID60 D30 coarse SILT OR CLAYfinemedium GRAIN SIZE IN MILLIMETERS 3/8 50 8.5ft. 2.0ft. 6.0ft. 6.0ft. 8.50ft. 2.00ft. 6.00ft. 6.00ft. PL PROJECT NUMBER ES-9182 PROJECT NAME Talbot Hills Short Plat GR A I N S I Z E U S D A E S - 9 1 8 2 T A L B O T H I L L S S H O R T P L A T . G P J G I N T U S L A B . G D T 5 / 4 / 2 3 Earth Solutions NW, LLC 15365 N.E. 90th Street, Suite 100 Redmond, Washington 98052 Telephone: 425-449-4704 Fax: 425-449-4711 Earth Solutions NW, LLC Report Distribution ES-9182 Schneider Family Homes, LLC Attention: Zach Schneider