HomeMy WebLinkAboutBraunstein Acknowledgement of Notes1
Heather Bray
From:Jeremiah Braunstein <jeremiah@allwireelectric.com>
Sent:Thursday, January 8, 2026 5:39 PM
To:Heather Bray; lonnie@picassopaving.com; jessebeltran73@gmail.com
Cc:Joshua Braunstein; Brad Stocco; Jason Churchill
Subject:Re: C25005234 - Braunstein Precon Meeting
Thank you Heather,
I have read the paperwork attached.
Best,
Jeremiah Braunstein
Chief Estimator
All Wire Electric, Inc.
m: (206) 226-4313
o: (206)935-6100
a: 600 SW 13th Street Suite 200 Renton, WA 98057
w:
allwireelectric.com e: jeremiah@allwireelectric.com
From: Heather Bray <HBray@rentonwa.gov>
Sent: Thursday, January 8, 2026 4:03 PM
To: Jeremiah Braunstein <jeremiah@allwireelectric.com>; lonnie@picassopaving.com <lonnie@picassopaving.com>;
jessebeltran73@gmail.com <jessebeltran73@gmail.com>
Cc: Joshua Braunstein <joshua@braunsteincg.com>; Brad Stocco <BStocco@Rentonwa.gov>; Jason Churchill
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless
you know the content is safe.
2
<JChurchill@Rentonwa.gov>
Subject: C25005234 - Braunstein Precon Meeting
Good afternoon,
Thank you for attending the pre-con meeting today, January 8th, 2026. Below is a summary of the meeting
with items that had additional discussion listed. Please let me know if you have any questions or would
like to make additions.
• Heather read the pre-con notes.
• Applicant discussed project phasing
• Paving to occur sometime next week
Attached are the precon notes that we discussed today as well as the issued permit.
For the applicant and contractor, please respond to this email verifying that you have read and accept
the precon notes.
Jeremiah,
You can view the City of Renton approved tree list in the link below. The planner would like a small
species under the “utilitrees” section on page 3.
https://edocs.rentonwa.gov/Documents/DocView.aspx?id=8464278&dbid=0&repo=CityofRenton
HEATHER BRAY, Civil Engineer III
City of Renton // Development Engineering
Virtual Permit Center // Online Applications and Inspections
office 425-430-7383
NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56
From: Heather Bray
Sent: Tuesday, January 6, 2026 2:13 PM
To: jeremiah@allwireelectric.com
Cc: Joshua Braunstein <joshua@braunsteincg.com>; Brad Stocco <BStocco@Rentonwa.gov>
Subject: C25005234 - Braunstein Precon Meeting
Jeremiah,
We will be scheduling the precon meeting for this Thursday, January 8th at 10am. Please see attached for the
precon notes. Please forward these notes to the contractor prior to the meeting.
We will require (2) full size prints of the approved plans to be provided to us before or during the precon meeting.
HEATHER BRAY, Civil Engineer III
City of Renton // Development Engineering
Virtual Permit Center // Online Applications and Inspections
office 425-430-7383
NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56