Loading...
HomeMy WebLinkAboutCM_Construction_Mitigation_Description_180522_v1.pdfSITTS & HILL ENGINEERS, INC. Professional Engineers and Planners BRENT K. LESLIE, P.E. 4815 Center Street, Tacoma, WA 98409 KATHY A. HARGRAVE, P.E. www.sitts-hill-engineers.com LARRY G. LINDELL, P.E. (253) 474-9449 MICHAEL A. McEVILLY, P.L.S. Civil, Structural and Surveying May 22nd, 2018 WASHINGTON STATE AUTO DEALERS ASSOCIATION (WSADA) 621 Southwest Grady Way Renton, Washington 98057 To: City of Renton Subject: Construction Mitigation Description Renton Parking Lot for WSADA This project proposes construction dates per permit approval, in anticipation for construction in August 2018 to September 2018. The proposed construction hours of operation for this parking lot are to be 6AM-4PM Monday through Friday. Proposed hauling/transportation routes shall be limited to accessing and leaving the site via the designated construction entrance on 12th Street Southwest. Completed hauling and transportation routes shall be made by the contractor. The project proposes to minimize dust by sweeping the adjacent streets (alley and 12th Street Southwest) at the end of each business day or as necessary. Traffic and transportation impacts will be mitigated by allowing construction to occur and end earlier than typical business hours. Erosion shall be mitigated via implementing BMPs such as silt fencing and catch basin protection. Noise shall be minimized by limiting construction to the hours of construction. Thank you again for giving us the opportunity to present our proposal for engineering services for the Washington State Auto Dealers Association parking lot improvements. Sincerely, SITTS & HILL ENGINEERS, INC. Kathy A. Hargrave, P.E. Principal P:\17600\17668\Applications and Permits\2018-05-22 Construction Mitigation Description.docx RECEIVED 06/27/2018 amorganroth PLANNING DIVISION