Subject: Construction Mitigation Description
Renton Parking Lot for WSADA
This project proposes construction dates per permit approval, in anticipation for construction in August
2018 to September 2018.
The proposed construction hours of operation for this parking lot are to be 6AM-4PM Monday through
Friday.
Proposed hauling/transportation routes shall be limited to accessing and leaving the site via the
designated construction entrance on 12th Street Southwest. Completed hauling and transportation routes
shall be made by the contractor.
The project proposes to minimize dust by sweeping the adjacent streets (alley and 12th Street
Southwest) at the end of each business day or as necessary. Traffic and transportation impacts will be
mitigated by allowing construction to occur and end earlier than typical business hours. Erosion shall be
mitigated via implementing BMPs such as silt fencing and catch basin protection. Noise shall be
minimized by limiting construction to the hours of construction.
Thank you again for giving us the opportunity to present our proposal for engineering services for the
Washington State Auto Dealers Association parking lot improvements.
Sincerely,
SITTS & HILL ENGINEERS, INC.
Kathy A. Hargrave, P.E.
Principal