HomeMy WebLinkAboutP_Site Plan_work planWall Failure & Debris
Removal Location
Install Anchored Silt
Screen
Removal Extents for 3:1
Slope
Stockpile Location #1 for Removed Dry
Material - Incl. Plastic Underneath Material
Stockpile Location #2 for Wet Material - Incl. Plastic
& Perimeter Trough for Water Handling
Dewatering through
adjacent soil
City of Renton - Cedar River Wall Repair
Site Plan