Loading...
HomeMy WebLinkAboutTask 200.5 Soos Creek Trail Phase 5a Renton CSWPP_250114CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN FOR SOOS CREEK TRAIL PHASE 5A EXTENSION CITY OF RENTON KING COUNTY, WASHINGTON October 27, 2025 Prepared for: King County Department of Natural Resources and Parks King Street Center, Room 6500 201 South Jackson Street Seattle, WA 98104-3855 Contact: Thomas Early (206) 477-7555 Prepared by: 1700 7th Ave, Suite 2075 Seattle, Washington 98101 Contact: Viet Ly, PE (206) 324-5500 10/27/2025 ii Table of Contents SECTION 1 - OVERVIEW ................................................................................................ 2 SECTION 2 – SWPPS SITE PLAN ................................................................................... 3 SECTION 3 – STORMWATER POLLUTION PREVENTION REPORT ....................... 5 SECTION 4 – SPILL PREVENTION AND CLEANUP REPORT .................................. 7 REFERENCES ................................................................................................................... 8 FIGURES Figure 1 Vicinity Map Figure 2 Overall Site Plan APPENDICES A T.E.S.C. Plans B Sample CSWPP Worksheet Forms 2 SECTION 1 - OVERVIEW This Construction Stormwater Pollution Prevention (CSWPP) Plan describes the measures and BMPs to prevent the discharge of sediment-laden water and other pollutants associated with construction of the proposed Soos Creek Trail segment that extends from the current trail end at SE 192nd Street to SE 186th Street. This proposed shared-use trail segment is on King County Parks properties located within the City of Renton (COR) jurisdiction. See Figure 1 for the project vicinity map. This CSWPP Plan is prepared in conformance with requirement 2.1.2 of the City of Renton 2022 Surface Water Design Manual (City Drainage Manual). Figure 1 – Vicinity Map 3 The CSWPP Plan for the project is comprised of two separate plans: • Erosion and Sediment Control (ESC) Plan • Stormwater Pollution Prevention and Spill (SWPPS) Plan The ESC Plan consists of the TESC plan sheets containing City of Renton Erosion and Sediment Control Standard Notes included in the Permit Plan Set submitted under separate cover. The extracted TESC plan sheets are included in Appendix A. The SWPPS Plan includes the following three elements as required in the City Drainage Manual: • SWPPS site plan, including supporting documentation; • A pollution prevention report, and; • A spill prevention and cleanup report. These required elements are addressed in Sections 2, 3 and 4 below, respectively. Note that this SWPPS Plan is preliminary and is intended to identify potential requirements and measures. The contractor selected for this project will need to elaborate and/or propose alternative measures. Some details related to construction operations and methods are deferred to the contractor. For example, it is unknown at this time whether fueling or fluid storage will be conducted on-site. The contractor will be responsible for updating the SWPPS Plan as necessary, and for documenting these updates, to reflect the site conditions and construction operations. If a Washington State Department of Ecology Construction Stormwater General Permit (CSWGP) is required for the project, the contractor will be responsible for obtaining and implementing the permit (including monitoring and reporting). King County Parks may initially obtain the CSWGP, then transfer the permit to the Contractor for implementation. SECTION 2 – SWPPS SITE PLAN The site discharges through native vegetation to a wetland in the east along Big Soos Creek. The wetland runoff eventually discharges to Big Soos Creek, less than ¼ mile away (see Figure 2). There are no surface water quality impairments in the vicinity of the site, based on review of the current Washinton State DOE Clean Water Act Section 303d listing of impaired surface water bodies. There are two potential sources of stormwater pollution from the site: disturbed soil during grading, and fluids associated with construction equipment. The SWPPS Plan contains perimeter control measures (silt fence) and final site stabilization measures (seed and mulch) to address disturbed soils, temporary cover measures including temporary plastic cover over material stock piles, and additional BMPs as described below. Construction equipment pollutants, such as fuel, hydraulic fluids, and coolants must be controlled through appropriate storage, inspection, maintenance and spill control BMPs identified in the CSWPP Plan that will be prepared, implemented and managed by the prime contractor. The CSWPP Plan will also be implemented by any subcontractor(s), under supervision by the prime contractor. 4 Proposed erosion and sediment control measures and specifications are shown on the TESC plans (Appendix A) and described in this section. The following BMPs to prevent erosion and sedimentation at the site will be used. Note that BMP measures prefixes are associated with the Drainage Manual references. D.2.1.1 Clearing Limits: prior to clearing and grubbing, maintained for entire project D.2.1.2 Cover Measures: implemented throughout the project D.2.1.2.1 Surface Roughening, following clearing and grubbing D.2.1.2.2 Mulching, applied as temporary or permanent D.2.1.2.4 Plastic covering (alternative to nets and blankets) applied only to stockpiles D.2.1.2.5 Straw Wattles, applied and maintained for the entire project D.2.1.2.6 Temporary and permanent seeding D.2.1.3 Perimeter Protection D.2.1.3.1 Silt Fence, applied and maintained for the entire project D.2.1.4 Traffic Area Stabilization D.2.1.4.1 Stabilized Construction Entrance, applied and maintained for the entire project D.2.1.5 Sediment Retention D.2.1.5.1 Sediment Trap, applied if applicable to the site conditions D.2.1.5.3 Storm Drain Inlet Protection D.2.1.6 Surface Water Collection, applied if applicable to the site conditions D.2.1.6.1 Interceptor Dike and Swale D.2.1.6.4 Ditches D.2.1.7 Dewatering Control If construction dewatering is required, a sedimentation bag will be used to filter the water prior to discharge at a stabilized outlet. Baker tanks may be used to temporarily store water. D.2.1.8 Dust Control (water), throughout the project; emphasized during dry season D.2.1.9 Flow Control, not needed unless as directed by COR. If construction occurs in the wet season (October 1 to April 30), the following requirements apply: 1. Cover measures to be installed if an area is to remain unworked for more than two days. 2. Stockpiles and steep (steeper than 3H:1V) cut and fill slopes to be covered if unworked for more than 12 hours. 3. Exposed soils shall be stabilized at the end of the workday prior to a weekend, holiday or predicted rain event 4. Cover material sufficient to cover all exposed areas must be stockpiled on-site 5 5. Prior to wet season, review all disturbed areas to identify which ones can be seeded in preparation for winter rains; seed such areas within one week of start of wet season 6. 50 linear feet of silt fence per acre (175 feet minimum) must be stockpiled on-site 7. Construction road and parking lot stabilization 8. Sediment retention is required unless no offsite discharge is anticipated for the design flow. It is not anticipated that offsite discharge will occur. Construction runoff will not be concentrated and will disperse toward downstream vegetated flow path. 9. Surface water control is required unless no offsite discharge is anticipated for the design flow. It is not anticipated that concentrated offsite discharge will occur. Construction runoff will disperse toward downstream vegetated flow path. 10. Phasing must be evaluated for construction activity near surface waters. Trail construction phase was evaluated and determined to be unnecessary. 11. Dewatering water may be required to discharge to an approved sanitary sewer system, portable sand filter, or holding tanks. 12. ESC facilities to be inspected a minimum of twice per month and within 24 hours of a storm event. 13. Sediment removal from construction stormwater filtration or chemical treatment facilities: twice per wet season and at decommissioning SECTION 3 – STORMWATER POLLUTION PREVENTION REPORT The following describes construction activities with potential pollutants and applicable BMPs. Storage and Handling of Liquids Liquids that will potentially be stored on-site include petroleum products, fuels, solvents, and concrete admixtures. Storage locations, types and sizes of containers and secondary containment will be identified by the contractor. Storage and Stockpiling of Construction Materials and Wastes The following construction materials and waste may be generated and/or stored on-site: • Construction Materials: Framing lumber; fill soil; trench backfill • Wastes: Trees, woody vegetation; excavation spoils; demolished asphalt Staging and storage locations for these materials and any others required for the project will be identified by the contractor. Fueling The contractor will determine if and how equipment fueling is to be done on-site, the designated fueling area, and the location of any fuel storage. 6 On-site storage types and size will be determined by the contractor, as will the lighting and signage plan, if required. Containment methods, if needed, will conform to COR BMP D.2.2.4 Maintenance, Repairs, and Storage of Vehicles and Equipment Maintenance and repair areas, if any, will be identified by the contractor. Drip pans or plastic beneath vehicles are required in the maintenance area. Methods for collection, storage and disposal of vehicle/equipment fluids will be identified by the contractor, consistent with COR requirements. Designated vehicle maintenance areas will be posted with signage prohibiting vehicle washing. Concrete Saw Cutting, Slurry and Washwater Disposal Unless updated by the contractor, concrete slurry and truck washout water will not be generated on-site. No slurry or washout sumps are necessary. The site is identified to be in a wellhead protection area according to COR GIS maps. Slurry from saw cutting shall be vacuumed immediately. Contractor’s concrete washout off-site location shall also take into consideration of the wellhead protection area. Rinsing areas for concrete handling hand tools will be designated by the contractor on the SWPPS site plan. The contractor will identify methods of collecting, treating and disposing of wastewater from concrete grinding, and new concrete washing and curing, per the requirements of the project specifications. Handling of pH Elevated Water pH elevated water is not anticipated. The contractor will develop a contingency plan for treatment and disposal of high pH water, if encountered. Application of Chemicals including Pesticides and Fertilizers The contractor will provide a list of chemicals that may be used/applied at the site and will describe application methods and storage locations and methods. Any such locations will be shown on an updated SWPPS plan. APPLICABLE BMPs The following BMPs, at a minimum, from Appendix D of the City Drainage Manual will be applied to control pollutants at the site. Refer to Appendix D of the City Drainage Manual for details related to these BMPs. D.2.2.1 Concrete Handling Used during cast-in-place wall and sidewalk construction. D.2.2.2 Concrete Washout Area – offsite 7 D.2.2.4 Material Delivery, Storage and Containment Hazardous chemicals and liquids will be stored in a lockable structure(s) (e.g. shed). Liquid storage in quantities greater than 30 gallons will be provided with secondary containment capable of containing 110% of the volume of the largest container and 10% of the volume of all containers. Incompatible materials will be stored in separate structures. D.2.2.5 Construction Stormwater Chemical Treatment If selected, approval of the treatment system must be obtained from the Washington Department of Ecology and use approved chemicals and processes, such as chitosan- enhanced sand filtration. D.2.2.6 Construction Stormwater Filtration Construction stormwater filtration will likely not be feasible for the site sub-surface conditions. D.2.2.8 pH Control for High pH Water High pH water is not anticipated. If high pH water is produced, a permit to discharge to the Soos Creek Water and Sewer District sewer system will be sought. Segregation of high-pH runoff from other stormwater runoff will be implemented. D.2.2.10 Maintain Protective BMPs See maintenance standards. D.2.2.11 Manage the Project Inspections, monitoring and reporting will be as required by the Construction Stormwater General Permit (CSWGP) issued by the State Department of Ecology, and as requested by COR. The Contractor will be responsible for maintain, implementing and updating the SWPPS Plan in accordance with the CSWGP and COR. SECTION 4 – SPILL PREVENTION AND CLEANUP REPORT Potential sources of liquid spills at the site will likely be limited to small quantities of petroleum products, if fueling is performed on-site and fuel is stored on-site. Personnel responsible for spill prevention and cleanup have not been identified, and will be provided by the Contractor. Spill prevention BMPs (storage and secondary containment) will be monitored by regular (weekly) inspection. 8 Spill response procedures will be developed by the Contractor for the liquids planned to be used at the site. Spill response materials in quantities appropriate to the size of a potential spill will be stored on-site at a location to be determined by the Contractor and noted on the site plan. Records of inspections and spill response will be kept at the site, using the sample CSWPP Worksheet form (Reference Section 8-E of the City Drainage Manual) provided in Appendix B as a minimum. Contaminated water or soil will be stored on-site in drums until appropriate, lawful, disposal can be arranged REFERENCES City of Renton Surface Water Design Manual 2022 City of Renton GIS Maps King County GIS iMap Washington State Department of Ecology https://ecology.wa.gov/water-shorelines/water-quality/water-improvement/assessment-of- state-waters-303d WLWL WL WL WL W L WL WL WL WL WL WL WL WL WL WL WL WL WL 1 3 3 2 7 3 0 8 4 0 3323059010 3323059057 3323059073 APPROX. BIG SOOS CREEK PER C.O.R. GIS MAP WETLAND BOUNDARY KING COUNTY PARKS PROPERTY LINE SCALE: 1" = 200' 0 100 200 400 60" CMP CULVERT OFSHEET HZ PROJECT NO.: ISSUE DATE: DRAWN BY: REVIEWED BY: APPROVED BY: EWORTHY 10/08/2025 2:54PM J:\R150278.53 - SOOS CREEK AMD 25\10 CADD & BIM\10.1 AUTOCAD\EXHIBITS\TIR\EXISTING SITE DRAINAGE CONDITIONS.DWG www.huitt-zollars.com OVERALL SITE PLAN 2 4 R150278.53 October 7, 2025 E. WORTHY C. MANNING V. LYSOOS CREEK TRAIL PHASE 5A KING COUNTY PARKS EXHIBIT 2 CITY OF RENTON 1700 7th Avenue, Suite 2075 Seattle, Washington 98101-1360 206.324.5500 SE 192ND ST SE 18 6 T H S T MEEKER MIDDLE SCHOOL 12 4 T H A V E S E SE 188TH PL BOULEVARD LANE PARK 9 APPENDIX A – TESC Plans WL WL WLWLWLWLWLWLWLWL WL WL WL W L WL WL T GATE PB S PB S GA T E G G PB PB PB P OP OP OP OP OP OP OP OT OT OT OT OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OT OT OT OT OT OT OT OT OT OT OT OT OT OT OT OT OT OT OT OT OT OT OT OT OT OT OT OT OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP 389 3 9 3 3 9 2 3 9 1 38 9 388 387 386 384 383 382 381 379 378 378 378 371 373 376379378377376374381382383 384 390 39 0 385 380 380 375 OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP 12 4 T H A V E S E APN 3323059057 BONNEVIL L E T R A N . L I N E E A S E M E N T 33 4 3 8 1 37 9 378 3 7 7 3 7 6 37 4 37 3 377 374 376 38 2 3 8 3 3 8 9 38 5 38 0 375 379 37 3 37 7 SD GATE 3 7 8 SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF 10 + 0 0 11+00 12+0 0 13 + 0 0 R/W 52+ 4 5 50+00 51+00 52+00 B-LINE A-LINE WETLAND BOUNDARY TYP. KC PARCEL #3323059057 R/W 1 4 5 6 5 2 2 7 7 8 1 N=159924.50 E=1308199.28 3 RELOCATE EXISTING POWER BOX N=159874.34 E=1308367.79 N=159885.23 E=1308301.54 N=159876.01 E=1308568.09 N=159901.87 E=1308574.22 EX FOG LINE SAW CUT 1 FT FROM FOG LINE TYP. A-LINE 8 A-LINE STA = 10+39.21, = B-LINE STA = 50+00.00 END SAWCUT AT FOGLINE B-LINE STA = 50+06.00, 7.8 R BEGIN SAWCUT AT FOGLINE A-LINE STA = 10+90.00, 13.5 L PROTECT EX STORM DRAIN PIPE CLEARING LIMITS = BACK OF CURB FUTURE DEDICATED R/W SE 192ND ST AP P R O X . 8 3 . 3 ' PR O P O S E D TE M P O R A R Y CO N S T R U C T I O N EA S E M E N T MEEKER MIDDLE SCHOOL PB R/W 9 4 C-001 RHT VUL DEMO, EROSION AND SEDIMENT CONTROL PLAN 1 2 5/5/25 8/29/25 50% SUBMITTAL 90% SUBMITTAL LEGEND PERIMETER PROTECTION (SILT FENCE) CLEARING & GRUBBING LIMITS STABILIZED CONSTRUCTION ENTRANCE DEMO ASPHALT CONCRETE PAVEMENT SF SAWCUT CURB DEMO INLET PROTECTION 1 C-006 1 C-007 2 C-007 DEMO CONCRETE SIGNIFICANT TREE REMOVAL NON-SIGNIFICANT TREE REMOVAL J:\ R 1 5 0 2 7 8 . 5 3 - S o o s C r e e k A M D 2 5 \ 1 0 C A D D & B I M \ 1 0 . 1 A u t o C A D \ S h e e t s \ 1 5 0 2 7 8 5 3 C - 0 0 1 . d w g T u e s d a y , O c t o b e r 0 7 , 2 0 2 5 2 : 4 5 p m SEC. 33, T 23 N, R 5 E, W.M. Know what'sbelow. before you dig.Call R IN COMPLIANCE WITH CITY OF RENTON STANDARDS 201 So. Jackson Street, Suite 700 Telephone: (206) 477-4527 Parks and Recreation Division Seattle, Washington 98104 Fax: (206) 263-6217 Department of Natural Resources and Parks King Street Center, KSC-NR-0700 OF SHEET TITLE CHECKED BY ID DRAWN BY FILE DATE DESCRIPTION ISSUE / REVISIONS CONTRACT NO. PH A S E 5 A E X T E N S I O N 150278.53 E00091E07 - AM. 25 SO O S C R E E K T R A I L SITE NO. PROJECT NO. ww w . h u i t t - z o l l a r s . c o m 17 0 0 7 t h A v e n u e , S u i t e 2 0 7 5 Se a t t l e , W a s h i n g t o n 9 8 1 0 1 - 1 3 6 0 20 6 . 3 2 4 . 5 5 0 0 KI N G C O U N T Y D E P A R T M E N T O F N A T U R A L RE S O U R C E S A N D P A R K S 39 NTS N SE 1 9 2 N D S T 124TH AVE SE SE 1 8 8 T H P L MATCHLINE - STA 13+25 - SEE C-002 SCALE (IN FEET) 0 10 20 40 HORZ CONSTRUCTION NOTES PROTECT EXISTING POWER UTILITY DEMO CONCRETE CURB AND GUTTER. DEMO ASPHALT SIDEWALK, MATCH LIMITS TO CURB DEMO LIMITS, SEE DETAIL 3 SHEET C-108. SEE STRUCTURAL SHEETS FOR BOARDWALK MODIFICATIONS. SEE SIGNING AND CHANNELIZATION PLAN FOR SIGN REMOVAL AND RELOCATIONS, TYP. DEMO EXISTING STOP BARS. DEMO EXISTING CROSSWALK STRIPING. SEE ELECTRICAL PLAN FOR SIGNAL AND PUSH BUTTON POLE REMOVAL DETAILS. SEE WATER UTILITY SHEETS FOR EXISTING FIRE HYDRANT DEMO. DEMO ASPHALT PAVEMENT AND/OR CONCRETE SIDEWALK ASSOCIATED WITH PROPOSED FIRE HYDRANT WORK. 1 2 3 4 5 6 7 8 9 NOTES 1.PERIMETER PROTECTION (SILT FENCE/WATTLE) SHOWN OFFSET FROM CLEARING LIMITS FOR LEGIBILITY ONLY. PERIMETER PROTECTION SHALL BE PLACED AT CLEARING LIMIT LINE WHERE INDICATED. 2.KEEP ALL CONSTRUCTION EQUIPMENT, MATERIALS, AND ACTIVITIES WITHIN THE CLEARING LIMITS AREA. 3.REMOVE BRANCHES GROWING TO 12 FEET ABOVE THE GROUND SURFACE WITHIN THE SILT FENCE/ CLEARING LIMITS AREA. CUT CLEAN AND FLUSH TO TRUNK OF TREE. 4.FOR PLAN CLARITY, COORDINATES OF ALL CLEARING LIMIT ANGLE POINTS ARE NOT SHOWN. ONLY REPRESENTATIVE ANGLE POINTS ARE PROVIDED WITH COORDINATES. SEE SPECIFICATIONS FOR ADDITIONAL CLEARING LIMITS INFORMATION. 5.SEE LANDSCAPE PLANS, LE-SERIES DRAWINGS, FOR TREE REMOVAL AND TREE PROTECTION FENCES. 6. FOR PLAN CLARITY, COORDINATES OF ALL PAVING DEMO LIMIT ANGLE POINTS ARE NOT SHOWN. 7.SEE CONTRACT DOCUMENTS FOR TEMPORARY CONSTRUCTION EASEMENTS. 20' WL WL WL WL WL WL WL WL WL WL WL WL WL WL S S PB PBPB PB PB MBMB SP PB OP OP OP OP OP OP OP OP OP OP 392 3 8 9 38 8 38 7 386386 38 7 3 8 8 39 0 385 38 5 39 1 OP OP OP OP OP OP OP OP OP WL 380 385 379 381 382 383 384 386 387 392 391 389 388 387 386 377 37 8 385 385 380 385 385 380 SF SF SF SF SF SF SF SFSFSF SF SFSF SF SF SF SF SF SF SF SF SF 1 1 2 2 22 R/W 3R/W R/W 5 5 5 KC PARCEL #3323059057 6 PARCEL #1332730840 CLEARING LIMITS = BACK OF CURB N=160280.46 E=1308207.69 N=160361.33 E=1308197.44 KC PARKS PROPERTY FUTURE DEDICATED R/W 1 5 1 14+00 15+00 16+00 17+00 124TH AVE SE 124T H A V E S E WL WL WL WL WL WL WL WL WL WL WL WL WL WL WL PB GA T E OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP AP N 3 3 2 3 0 5 9 0 1 0 WL WL WL 392 391 389 388 387 386 384 383 382 381 379 378 377 389 388 387 386 384 383 382 381 379 377 378 380 385 385 380 390 380 382 381 377 376 376 376 383 389 388 387 386 38 5 380 380 AP N 1 3 3 2 7 3 0 8 4 0 AP N 1 3 3 2 7 3 0 8 4 0 CA N Y O N T E R R A C E TR A C T L NG P A SFSFSFSFSFSFSFSF SF SF SF SF SF SF 4 R/W R/W KC PARCEL #3323059057 KC PARCEL #3323059010 6 6 6 PARCEL #1332730840 APPROX. PROPERTY LINE CANYON TERRACE DETENTION POND N=160468.77 E=1308137.79 N=160520.42 E=1308125.31 N=160742.49 E=1308127.14 N=160598.72 E=1308120.20 PROTECT EXISTING ACP POND ACCESS AND FRONTAGE CURB CANYON T E R R A C E T R A C T KING COU N T Y P A R K S P R O P E R T Y 17+00 18+00 19+00 20+00 21+00 124T H A V E S E 124 T H A V E S E 5 C-002 RHT VUL DEMO, EROSION AND SEDIMENT CONTROL PLAN 1 2 5/5/25 8/29/25 50% SUBMITTAL 90% SUBMITTAL LEGEND PERIMETER PROTECTION (SILT FENCE) CLEARING & GRUBBING LIMITS STABILIZED CONSTRUCTION ENTRANCE DEMO ASPHALT CONCRETE PAVEMENT SF SAWCUT CURB DEMO INLET PROTECTION 1 C-006 1 C-007 2 C-007 DEMO CONCRETE SIGNIFICANT TREE REMOVAL NON-SIGNIFICANT TREE REMOVAL NOTES 1.PERIMETER PROTECTION (SILT FENCE/WATTLE) SHOWN OFFSET FROM CLEARING LIMITS FOR LEGIBILITY ONLY. PERIMETER PROTECTION SHALL BE PLACED AT CLEARING LIMIT LINE WHERE INDICATED. 2.KEEP ALL CONSTRUCTION EQUIPMENT, MATERIALS, AND ACTIVITIES WITHIN THE CLEARING LIMITS AREA. 3.REMOVE BRANCHES GROWING TO 12 FEET ABOVE THE GROUND SURFACE WITHIN THE SILT FENCE/ CLEARING LIMITS AREA. CUT CLEAN AND FLUSH TO TRUNK OF TREE. 4.FOR PLAN CLARITY, COORDINATES OF ALL CLEARING LIMIT ANGLE POINTS ARE NOT SHOWN. ONLY REPRESENTATIVE ANGLE POINTS ARE PROVIDED WITH COORDINATES. SEE SPECIFICATIONS FOR ADDITIONAL CLEARING LIMITS INFORMATION. 5.SEE LANDSCAPE PLANS, LE-SERIES DRAWINGS, FOR TREE REMOVAL AND TREE PROTECTION FENCES. 6.FOR PLAN CLARITY, COORDINATES OF ALL PAVING DEMO LIMIT ANGLE POINTS ARE NOT SHOWN. 7.SEE CONTRACT DOCUMENTS FOR TEMPORARY CONSTRUCTION EASEMENTS. SCALE (IN FEET) 0 10 20 40 HORZ J:\ R 1 5 0 2 7 8 . 5 3 - S o o s C r e e k A M D 2 5 \ 1 0 C A D D & B I M \ 1 0 . 1 A u t o C A D \ S h e e t s \ 1 5 0 2 7 8 5 3 C - 0 0 2 . d w g T u e s d a y , O c t o b e r 0 7 , 2 0 2 5 2 : 4 5 p m SEC. 33, T 23 N, R 5 E, W.M. Know what'sbelow. before you dig.Call R IN COMPLIANCE WITH CITY OF RENTON STANDARDS 201 So. Jackson Street, Suite 700 Telephone: (206) 477-4527 Parks and Recreation Division Seattle, Washington 98104 Fax: (206) 263-6217 Department of Natural Resources and Parks King Street Center, KSC-NR-0700 OF SHEET TITLE CHECKED BY ID DRAWN BY FILE DATE DESCRIPTION ISSUE / REVISIONS CONTRACT NO. PH A S E 5 A E X T E N S I O N 150278.53 E00091E07 - AM. 25 SO O S C R E E K T R A I L SITE NO. PROJECT NO. ww w . h u i t t - z o l l a r s . c o m 17 0 0 7 t h A v e n u e , S u i t e 2 0 7 5 Se a t t l e , W a s h i n g t o n 9 8 1 0 1 - 1 3 6 0 20 6 . 3 2 4 . 5 5 0 0 KI N G C O U N T Y D E P A R T M E N T O F N A T U R A L RE S O U R C E S A N D P A R K S 39 NTS N SE 1 9 2 N D S T 124TH AVE SE SE 1 8 8 T H P L M A T C H L I N E - S T A 1 7 + 0 0 - S E E A B O V E MA T C H L I N E - S T A 1 3 + 2 5 - S E E C- 0 0 1 MA T C H L I N E - S T A 2 1 + 0 0 - S E E C- 0 0 3 M A T C H L I N E - S T A 1 7 + 0 0 - S E E B E L O W CONSTRUCTION NOTES PROTECT EXISTING POWER UTILITY. PROTECT EXISTING STORM CULVERTS. DEMO ADA RAMP AND CURB. STABILIZED CONSTRUCTION ENTRANCE PROTECT EXISTING LIGHT POLE, APPURTENENCES, AND CONCRETE PAD. REMOVE EXISTING ORANGE SILT FENCE (NOT SHOWN, LENGTH UNKNOWN) LEFT BEHIND FROM DEVELOPMENT BY OTHERS 1 2 3 4 5 6 WL WL WL WL WL WL WL WL WL WL WL WL W W SD OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP AP N 3 3 2 3 0 5 9 0 1 0 386 384 383 382 381 379 378 377 376 396 394 393 392 387 386 384 383 382 381 379 378 377 376 385 380 400 395 390 380 375 SFSFSFSFSFSFSFSFSFSF SF SF KC PARCEL #3323059010 KC PARCEL #3323059057 PROTECT EX WATER VALVE PARCEL #1332730840 KC PARCEL #3323059010 KC PARCEL #3323059057 BEGIN UNIFORM CLEARING LIMIT OFFSET STA=23+07.25 N=160888.68 E=1308116.61 21+00 22+00 23+00 24+00 3 3 1 2 4 BEGIN UNIFORM CLEARING LIMIT OFFSET STA=22+55.54 18912 124TH AVE SE RENTON 98058 PARCEL #1332730690 18906 124TH AVE SE RENTON 98058 PARCEL #1332730680 18900 124TH AVE SE RENTON 98058 PARCEL #1332730670 18844 124TH AVE SE RENTON 98058 PARCEL #1332730660 18838 124TH AVE SE RENTON 98058 PARCEL #1332730650 KING COU N T Y P A R K S P R O P E R T Y APPROX. E X 2 0 ' WATER EA S E M E N T AP P R O X . E X 2 0 ' WA T E R E A S E M E N T 14' 15' WL WL WL WL WL WL WL WL WL WL WL WL WL SD OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP AP N 3 3 2 3 0 5 9 0 7 3 AP N 3 3 2 3 0 5 9 0 1 0 397 394 393 392 383 382 381 379 378 377 376 395 390 385 380 386 387 388 381 382 383 384 378 379 377 376 385 380 390 390 380 395 380 385 375 389 376 SF SF SF SF SF SF SF SF SF SFSFSFSF KC PARCEL #3323059010 KC PARCEL #3323059073 25+00 26+00 27+00 28+00 EX SD EASEMENT 6 C-003 RHT VUL DEMO, EROSION AND SEDIMENT CONTROL PLAN 1 2 5/5/25 8/29/25 50% SUBMITTAL 90% SUBMITTAL LEGEND PERIMETER PROTECTION (SILT FENCE) CLEARING & GRUBBING LIMITS STABILIZED CONSTRUCTION ENTRANCE DEMO ASPHALT CONCRETE PAVEMENT SF SAWCUT CURB DEMO INLET PROTECTION 1 C-006 1 C-007 2 C-007 DEMO CONCRETE SIGNIFICANT TREE REMOVAL NON-SIGNIFICANT TREE REMOVAL NOTES 1.PERIMETER PROTECTION (SILT FENCE/WATTLE) SHOWN OFFSET FROM CLEARING LIMITS FOR LEGIBILITY ONLY. PERIMETER PROTECTION SHALL BE PLACED AT CLEARING LIMIT LINE WHERE INDICATED. 2.KEEP ALL CONSTRUCTION EQUIPMENT, MATERIALS, AND ACTIVITIES WITHIN THE CLEARING LIMITS AREA. 3.REMOVE BRANCHES GROWING TO 12 FEET ABOVE THE GROUND SURFACE WITHIN THE SILT FENCE/ CLEARING LIMITS AREA. CUT CLEAN AND FLUSH TO TRUNK OF TREE. 4.FOR PLAN CLARITY, COORDINATES OF ALL CLEARING LIMIT ANGLE POINTS ARE NOT SHOWN. ONLY REPRESENTATIVE ANGLE POINTS ARE PROVIDED WITH COORDINATES. SEE SPECIFICATIONS FOR ADDITIONAL CLEARING LIMITS INFORMATION. 5.SEE LANDSCAPE PLANS, LE-SERIES DRAWINGS, FOR TREE REMOVAL AND TREE PROTECTION FENCES. 6.FOR PLAN CLARITY, COORDINATES OF ALL PAVING DEMO LIMIT ANGLE POINTS ARE NOT SHOWN. 7.SEE CONTRACT DOCUMENTS FOR TEMPORARY CONSTRUCTION EASEMENTS. SCALE (IN FEET) 0 10 20 40 HORZ J:\ R 1 5 0 2 7 8 . 5 3 - S o o s C r e e k A M D 2 5 \ 1 0 C A D D & B I M \ 1 0 . 1 A u t o C A D \ S h e e t s \ 1 5 0 2 7 8 5 3 C - 0 0 3 . d w g T u e s d a y , O c t o b e r 0 7 , 2 0 2 5 2 : 4 6 p m SEC. 33, T 23 N, R 5 E, W.M. Know what'sbelow. before you dig.Call R IN COMPLIANCE WITH CITY OF RENTON STANDARDS 201 So. Jackson Street, Suite 700 Telephone: (206) 477-4527 Parks and Recreation Division Seattle, Washington 98104 Fax: (206) 263-6217 Department of Natural Resources and Parks King Street Center, KSC-NR-0700 OF SHEET TITLE CHECKED BY ID DRAWN BY FILE DATE DESCRIPTION ISSUE / REVISIONS CONTRACT NO. PH A S E 5 A E X T E N S I O N 150278.53 E00091E07 - AM. 25 SO O S C R E E K T R A I L SITE NO. PROJECT NO. ww w . h u i t t - z o l l a r s . c o m 17 0 0 7 t h A v e n u e , S u i t e 2 0 7 5 Se a t t l e , W a s h i n g t o n 9 8 1 0 1 - 1 3 6 0 20 6 . 3 2 4 . 5 5 0 0 KI N G C O U N T Y D E P A R T M E N T O F N A T U R A L RE S O U R C E S A N D P A R K S 39 NTS N SE 1 9 2 N D S T 124TH AVE SE SE 1 8 8 T H P L MA T C H L I N E - S T A 2 4 + 5 0 - S E E A B O V E MA T C H L I N E - S T A 2 4 + 5 0 - S E E B E L O W MA T C H L I N E - S T A 2 1 + 0 0 - S E E C- 0 0 2 M A T C H L I N E - S T A 2 8 + 2 5 - S E E C - 0 0 4 CONSTRUCTION NOTES PROTECT EXISTING STORM CULVERT PROTECT EXISTING WATER PIPE PROTECT EXISTING RIP RAP. VERIFY EDGE OF RIP RAP TO SET CLEARING LIMITS. EXTEND DEMO OF CONCRETE STAIR TO ONE STEP OUTSIDE KC PARKS PROPERTY BOUNDARY 1 2 3 4 KING COUNTY ROADS SIGN WL WL WL WL WL WL WL GATE OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP 382 383 384 381 379 378 3 7 7 3 7 6 380 375 380 385 390 395 3 8 1 38 2 3 8 3 3 8 0SF SF SF SFSFSF SF SF SF SF SF 3 28+00 29+00 30+00 31+00 END UNIFORM CLEARING STA = 28+69.41, 15 R END UNIFORM CLEARING STA = 29+37.81, 14 L GATE S GATE GATE S T OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP OP SE 1 8 6 T H S T 381 38 6 38 7 38 8 38 9 38 4 383 381 382 37 7 3 8 7 3 8 1 38 2 3 8 3 384 379 38 1 378 379 382 383383 385 380 380 3 8 0 38 0 S SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF R/W R/W 1 2 3 4 PROTECT SEWER MANHOLE SE 1 8 6 T H S T 5 6 6 31+00 32+0 0 33 + 0 0 34+ 0 0 34+4 9 N=161817.48 E=1307955.88 N=161776.01 E=1307992.36 PROTECT EX FENCE PROTECT EX WATER VALVE BOX DEMO FENCE / GATE DEMO ASPHALT COLLAR. PROTECT SEWER MANHOLE 7 C-004 RHT VUL DEMO, EROSION AND SEDIMENT CONTROL PLAN 1 2 5/5/25 8/29/25 50% SUBMITTAL 90% SUBMITTAL LEGEND PERIMETER PROTECTION (SILT FENCE) CLEARING & GRUBBING LIMITS STABILIZED CONSTRUCTION ENTRANCE DEMO ASPHALT CONCRETE PAVEMENT SF SAWCUT CURB DEMO INLET PROTECTION 1 C-006 1 C-007 2 C-007 DEMO CONCRETE SIGNIFICANT TREE REMOVAL NON-SIGNIFICANT TREE REMOVAL NOTES 1.PERIMETER PROTECTION (SILT FENCE/WATTLE) SHOWN OFFSET FROM CLEARING LIMITS FOR LEGIBILITY ONLY. PERIMETER PROTECTION SHALL BE PLACED AT CLEARING LIMIT LINE WHERE INDICATED. 2.KEEP ALL CONSTRUCTION EQUIPMENT, MATERIALS, AND ACTIVITIES WITHIN THE CLEARING LIMITS AREA. 3.REMOVE BRANCHES GROWING TO 12 FEET ABOVE THE GROUND SURFACE WITHIN THE SILT FENCE/ CLEARING LIMITS AREA. CUT CLEAN AND FLUSH TO TRUNK OF TREE. 4.FOR PLAN CLARITY, COORDINATES OF ALL CLEARING LIMIT ANGLE POINTS ARE NOT SHOWN. ONLY REPRESENTATIVE ANGLE POINTS ARE PROVIDED WITH COORDINATES. SEE SPECIFICATIONS FOR ADDITIONAL CLEARING LIMITS INFORMATION. 5.SEE LANDSCAPE PLANS, LE-SERIES DRAWINGS, FOR TREE REMOVAL AND TREE PROTECTION FENCES. 6.FOR PLAN CLARITY, COORDINATES OF ALL PAVING DEMO LIMIT ANGLE POINTS ARE NOT SHOWN. 7.SEE CONTRACT DOCUMENTS FOR TEMPORARY CONSTRUCTION EASEMENTS. SCALE (IN FEET) 0 10 20 40 HORZ J:\ R 1 5 0 2 7 8 . 5 3 - S o o s C r e e k A M D 2 5 \ 1 0 C A D D & B I M \ 1 0 . 1 A u t o C A D \ S h e e t s \ 1 5 0 2 7 8 5 3 C - 0 0 4 . d w g T u e s d a y , O c t o b e r 0 7 , 2 0 2 5 2 : 4 6 p m SEC. 33, T 23 N, R 5 E, W.M. Know what'sbelow. before you dig.Call R IN COMPLIANCE WITH CITY OF RENTON STANDARDS 201 So. Jackson Street, Suite 700 Telephone: (206) 477-4527 Parks and Recreation Division Seattle, Washington 98104 Fax: (206) 263-6217 Department of Natural Resources and Parks King Street Center, KSC-NR-0700 OF SHEET TITLE CHECKED BY ID DRAWN BY FILE DATE DESCRIPTION ISSUE / REVISIONS CONTRACT NO. PH A S E 5 A E X T E N S I O N 150278.53 E00091E07 - AM. 25 SO O S C R E E K T R A I L SITE NO. PROJECT NO. ww w . h u i t t - z o l l a r s . c o m 17 0 0 7 t h A v e n u e , S u i t e 2 0 7 5 Se a t t l e , W a s h i n g t o n 9 8 1 0 1 - 1 3 6 0 20 6 . 3 2 4 . 5 5 0 0 KI N G C O U N T Y D E P A R T M E N T O F N A T U R A L RE S O U R C E S A N D P A R K S 39 NTS N SE 1 9 2 N D S T 124TH AVE SE SE 1 8 8 T H P L M A T C H L I N E - S T A 2 8 + 2 5 - S E E C - 0 0 3 M A T C H L I N E S E E A B O V E M A T C H L I N E S E E B E L O W M A T C H L I N E - S T A 3 1 + 1 0 - S E E B E L O W M A T C H L I N E S E E A B O V E M A T C H L I N E S E E B E L O W M A T C H L I N E - S T A 3 1 + 1 0 S E E A B O V E KC PARCEL #3323059073 KC PARCEL #3323059073 CONSTRUCTION NOTES PROTECT EXISTING SEWER PIPE PROTECT EXISTING STORM PIPE EXISTING STORM PIPE OUTFALL TO REMAIN STABILIZED CONSTRUCTION ENTRANCE KEEP EXISTING GATE FOR CONSTRUCTION. DEMO GATE AFTER CONSTRUCTION. PROTECT EXISTING WATER LINE. SHOWN AS APPROXIMATE. 1 2 3 4 5 6 EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES: THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE EROSION AND SEDIMENT CONTROL (ESC) PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY PROJECT. THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLICANT, MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THE APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE ESC STANDARD PLAN NOTES. 1.BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE-CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR. 2.THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATER GENERAL PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT. 3.THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO POST-PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS. 4.THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 5.STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK-OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE. 6.WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF-SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON-SITE DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS. 7.ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON-SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON-SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT. 8.ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY. 9.THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 10.APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR STORMWATER FACILITIES. 11.ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL. 12.ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM. 13.WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1ST AND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY. 14.ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 15.THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY. 16.BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING CONDITION. 17.AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT-LADEN WATER INTO THE DOWNSTREAM SYSTEM. 18.ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 19.AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON-SITE BMPS (AMENDED SOILS, BIORETENT ION, PERMEABLE PAVEMENT, ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND COMPACTION DURING CONSTRUCTION. 20.PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. AN EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW. 21.PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT-LADEN WATER FROM LEAVING THE PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES , AND ON-SITE BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTION ING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST. 22.ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS-OF-WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS-OF-WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. J:\ R 1 5 0 2 7 8 . 5 3 - S o o s C r e e k A M D 2 5 \ 1 0 C A D D & B I M \ 1 0 . 1 A u t o C A D \ S h e e t s \ 1 5 0 2 7 8 5 3 C - 0 0 5 . d w g T u e s d a y , O c t o b e r 0 7 , 2 0 2 5 2 : 4 7 p m IN COMPLIANCE WITH CITY OF RENTON STANDARDS 201 So. Jackson Street, Suite 700 Telephone: (206) 477-4527 Parks and Recreation Division Seattle, Washington 98104 Fax: (206) 263-6217 Department of Natural Resources and Parks King Street Center, KSC-NR-0700 OF SHEET TITLE CHECKED BY ID DRAWN BY FILE DATE DESCRIPTION ISSUE / REVISIONS CONTRACT NO. PH A S E 5 A E X T E N S I O N 150278.53 E00091E07 - AM. 25 SO O S C R E E K T R A I L SITE NO. PROJECT NO. ww w . h u i t t - z o l l a r s . c o m 17 0 0 7 t h A v e n u e , S u i t e 2 0 7 5 Se a t t l e , W a s h i n g t o n 9 8 1 0 1 - 1 3 6 0 20 6 . 3 2 4 . 5 5 0 0 KI N G C O U N T Y D E P A R T M E N T O F N A T U R A L RE S O U R C E S A N D P A R K S 398 C-005 RHT VUL CITY OF RENTON TESC STANDARD NOTES AND DETAILS 1 2 5/5/25 8/29/25 50% SUBMITTAL 90% SUBMITTAL 1 C-005 ESC STANDARD PLAN NOTES NOT TO SCALE REFERENCE: CITY OF RENTON STD. PLAN 268.00 2 C-005 PLASTIC COVERING NOT TO SCALE REFERENCE: CITY OF RENTON STD. PLAN - 213.30 NOTES: 1.CONDITIONS OF USE 1.1.PLASTIC COVERING MAY BE USED ON DISTURBED AREAS THAT REQUIRE COVER MEASURES FOR LESS THAN 30 DAYS. 1.2.PLASTIC IS PARTICULARLY USEFUL FOR PROTECTING CUT AND FILL SLOPES AND STOCKPILES. 1.3.CLEAR PLASTIC SHEETING MAY BE USED OVER NEWLY-SEEDED AREAS TO CREATE A GREENHOUSE EFFECT AND ENCOURAGE GRASS GROWTH. CLEAR PLASTIC SHOULD NOT BE USED FOR THIS PURPOSE DURING THE SUMMER MONTHS. 1.4.THIS METHOD SHALL NOT BE USED UPSLOPE OF AREAS THAT MIGHT BE ADVERSELY IMPACTED BY RUNOFF. SUCH AREAS INCLUDE STEEP AND UNSTABLE SLOPES. 2.DESIGN AND INSTALLATION SPECIFICATIONS 2.1.PLASTIC SHEETING SHOULD HAVE A MINIMUM THICKNESS OF 0.06 MILLIMETERS. 2.2.IF EROSION AT THE TOE OF A SLOPE IS LIKELY, A GRAVEL BERM, RIPRAP, OR OTHER SUITABLE PROTECTION SHALL BE INSTALLED AT THE TOE OF THE SLOPE IN ORDER TO REDUCE THE VELOCITY OF RUNOFF. 2.3.TIRES, SAND BAGS, OR EQUIVALENT MAY BE USED TO WEIGHT PLASTIC. 2.4.SEAMS BETWEEN SHEETS MUST OVERLAP A MINIMUM OF 12 INCHES AND BE WEIGHTED OR TAPED. 3.MAINTENANCE STANDARDS 3.1.TORN SHEETS MUST BE REPLACED AND OPEN SEAMS REPAIRED. 3.2.IF THE PLASTIC BEGINS TO DETERIORATE DUE TO ULTRAVIOLET RADIATION, IT MUST BE COMPLETELY REMOVED AND REPLACED. 3.3.WHEN THE PLASTIC IS NO LONGER NEEDED, IT SHALL BE COMPLETELY REMOVED. J:\ R 1 5 0 2 7 8 . 5 3 - S o o s C r e e k A M D 2 5 \ 1 0 C A D D & B I M \ 1 0 . 1 A u t o C A D \ S h e e t s \ 1 5 0 2 7 8 5 3 C - 0 0 6 . d w g T u e s d a y , O c t o b e r 0 7 , 2 0 2 5 2 : 4 7 p m IN COMPLIANCE WITH CITY OF RENTON STANDARDS 201 So. Jackson Street, Suite 700 Telephone: (206) 477-4527 Parks and Recreation Division Seattle, Washington 98104 Fax: (206) 263-6217 Department of Natural Resources and Parks King Street Center, KSC-NR-0700 OF SHEET TITLE CHECKED BY ID DRAWN BY FILE DATE DESCRIPTION ISSUE / REVISIONS CONTRACT NO. PH A S E 5 A E X T E N S I O N 150278.53 E00091E07 - AM. 25 SO O S C R E E K T R A I L SITE NO. PROJECT NO. ww w . h u i t t - z o l l a r s . c o m 17 0 0 7 t h A v e n u e , S u i t e 2 0 7 5 Se a t t l e , W a s h i n g t o n 9 8 1 0 1 - 1 3 6 0 20 6 . 3 2 4 . 5 5 0 0 KI N G C O U N T Y D E P A R T M E N T O F N A T U R A L RE S O U R C E S A N D P A R K S 399 C-006 RHT VUL TESC STANDARD NOTES AND DETAILS 1 2 5/5/25 8/29/25 50% SUBMITTAL 90% SUBMITTAL 1 C-006 INLET PROTECTION NOT TO SCALE REFERENCE: CITY OF RENTON STD. PLAN - 216.30 2 C-006 EROSION CONTROL SEED MIX NOT TO SCALE REFERENCE: CITY OF RENTON SURFACE WATER DESIGN MANUAL - TABLE D.2.1.2.B TABLE D.2.1.2.B EROSION CONTROL SEED MIX COMMON NAME/LATIN NAME % SPECIES COMPOSITION DESIRED SEEDS PER SQUARE FOOT PLS POUNDS/ACRE SPIKE BENTGRASS/AGROSTIS EXARATA 6 9 0.1 CALIFORNIA BROME/BROMUS CARINATUS 15 23 9.8 TUFTED HAIRGRASS/DESCHAMPSIA CESPITOSA 15 23 0.4 BLUE WILDRYE/ELYMUS GLAUCUS 18 27 10.7 CALIFORNIA OATGRASS/DANTHONIA CALIFORNICA 18 27 5.6 NATIVE RED FESCUE/FESTUCA RUBRA VAR. RUBRA 18 27 2.4 MEADOW BARLEY/HORDEUM BRACHYANTHERUM 10 15 7.7 J:\ R 1 5 0 2 7 8 . 5 3 - S o o s C r e e k A M D 2 5 \ 1 0 C A D D & B I M \ 1 0 . 1 A u t o C A D \ S h e e t s \ 1 5 0 2 7 8 5 3 C - 0 0 7 . d w g T u e s d a y , O c t o b e r 0 7 , 2 0 2 5 2 : 4 7 p m IN COMPLIANCE WITH CITY OF RENTON STANDARDS 201 So. Jackson Street, Suite 700 Telephone: (206) 477-4527 Parks and Recreation Division Seattle, Washington 98104 Fax: (206) 263-6217 Department of Natural Resources and Parks King Street Center, KSC-NR-0700 OF SHEET TITLE CHECKED BY ID DRAWN BY FILE DATE DESCRIPTION ISSUE / REVISIONS CONTRACT NO. PH A S E 5 A E X T E N S I O N 150278.53 E00091E07 - AM. 25 SO O S C R E E K T R A I L SITE NO. PROJECT NO. ww w . h u i t t - z o l l a r s . c o m 17 0 0 7 t h A v e n u e , S u i t e 2 0 7 5 Se a t t l e , W a s h i n g t o n 9 8 1 0 1 - 1 3 6 0 20 6 . 3 2 4 . 5 5 0 0 KI N G C O U N T Y D E P A R T M E N T O F N A T U R A L RE S O U R C E S A N D P A R K S 3910 C-007 RHT VUL TESC STANDARD NOTES AND DETAILS 1 2 5/5/25 8/29/25 50% SUBMITTAL 90% SUBMITTAL 2 C-007 SILT FENCE NOT TO SCALE REFERENCE: CITY OF RENTON STD. PLAN - 214.00 NOTES: 1.CONDITION OF USE 1.1.CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE. 1.2.FOR RESIDENTIAL CONSTRUCTION PROVIDE STABILIZED CONSTRUCTION ENTRANCES FOR EACH RESIDENCE IN ADDITION TO THE MAIN SUBDIVISION ENTRANCE. STABILIZED SURFACES SHALL BE OF SUFFICIENT LENGTH/WIDTH TO PROVIDE VEHICLE ACCESS/PARKING, BASED ON LOT SIZE/CONFIGURATION. 2.DESIGN AND INSTALLATION SPECIFICATIONS 2.1.A SEPARATION GEOTEXTILE SHALL BE PLACED UNDER THE SPALLS TO PREVENT FINE SEDIMENT FROM PUMPING UP INTO THE ROCK PAD. THE GEOTEXTILE SHALL MEET THE FOLLOWING STANDARDS: 2.2.DO NOT USE CRUSHED CONCRETE, CEMENT, OR CALCIUM CHLORIDE FOR CONSTRUCTION ENTRANCE STABILIZATION BECAUSE THESE PRODUCTS RAISE pH LEVELS IN STORMWATER AND CONCRETE DISCHARGE TO SURFACE WATERS OF THE STATE IS PROHIBITED. 2.3.HOG FUEL (WOOD BASED MULCH) MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN AREAS THAT WILL NOT BE USED FOR PERMANENT ROADS. HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILIZATION IN URBAN AREAS. THE INSPECTOR MAY AT ANY TIME REQUIRE THE USE OF QUARRY SPALLS IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT. 2.4.FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE. 2.5.WHENEVER POSSIBLE, THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM, COMPACTED SUBGRADE. THIS CAN SUBSTANTIALLY INCREASE THE EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR MAINTENANCE. 3.MAINTENANCE STANDARDS 3.1.QUARRY SPALLS SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS. 3.2.IF THE ENTRANCE IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE IN THE DIMENSIONS OF THE ENTRANCE, OR THE INSTALLATION OF A WHEEL WASH. IF WASHING IS USED, IT SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK, AND WASH WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND. 3.3.ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVED OR STABILIZED ON SITE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET, EXCEPT WHEN SWEEPING IS INEFFECTIVE AND THERE IS A THREAT TO PUBLIC SAFETY. IF IT IS NECESSARY TO WASH THE STREETS, A SMALL SUMP MUST BE CONSTRUCTED. THE SEDIMENT WOULD THEN BE WASHED INTO THE SUMP WHERE IT CAN BE CONTROLLED AND DISCHARGED APPROPRIATELY. WASH WATER MUST BE PUMPED BACK ONTO THE SITE AND CANNOT DISCHARGE TO SYSTEMS TRIBUTARY TO SURFACE WATERS. 3.4.ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY. 3.5.IF VEHICLES ARE ENTERING OR EXITING THE SITES AT POINTS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL BE INSTALLED TO CONTROL TRAFFIC. NOTES: 1.CONDITIONS OF USE 1.1.SILT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS. 1.2.SILT FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS, NOR IS IT INTENDED TO TREAT SUBSTANTIAL AMOUNTS OF OVERLAND FLOW. ANY CONCENTRATED FLOW MUST BE CONVEYED THROUGH THE DRAINAGE SYSTEM TO A SEDIMENT TRAP OR POND. 2.DESIGN AND INSTALLATION SPECIFICATIONS 2.1.THE GEOTEXTILE USED MUST MEET THE STANDARD LISTED BELLOW. A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MUST BE AVAILABLE ON SITE. 2.2.STANDARD STRENGTH FABRIC REQUIRES WIRE BACKING TO INCREASE THE STRENGTH OF THE FENCE. WIRE BACKING OR CLOSER POST SPACING MAY BE REQUIRED FOR EXTRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE. 2.3.WHERE THE FENCE IS INSTALLED, THE SLOPE SHALL NOT BE STEEPER THAN 2H:1V 2.4.IF A TYPICAL SILT FENCE IS USED, THE STANDARD 4"X4" TRENCH MAY BE REDUCED AS LONG AS THE BOTTOM 8 INCHES OF THE SILT FENCE FABRIC IS WELL BURIED AND SECURE IN A TRENCH THAT STABILIZES THE FENCE AND DOES NOT ALLOW WATER TO BYPASS OR UNDERMINE THE SILT FENCE. 2.5.FILTER FABRIC FENCES SHALL BE INSTALLED ALONG CONTOURS WHENEVER POSSIBLE. 3.MAINTENANCE STANDARDS 3.1.ANY DAMAGE SHALL BE REPAIRED IMMEDIATELY. 3.2.IF CONCENTRATED FLOWS ARE EVIDENT UPHILL OF THE FENCE, THEY MUST BE INTERCEPTED AND CONVEYED TO A SEDIMENT TRAP OR POND. 3.3.IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING AND ACTING AS A BARRIER TO FLOW AND THEN CAUSING CHANNELIZATION OF FLOWS PARALLEL TO THE FENCE. IF THIS OCCURS, REPLACE THE FENCE OR REMOVE THE TRAPPED SEDIMENT. 3.4.SEDIMENT MUST BE REMOVED WHEN SEDIMENT IS 6 INCHES HIGH. 3.5.IF THE FILTER FABRIC (GEOTEXTILE) HAS DETERIORATED DUE TO ULTRAVIOLET BREAKDOWN, IT SHALL BE REPLACED. CONSTRUCTION ENTRANCE NOTES: 1.DRIVEWAYS SHALL BE PAVED TO THE EDGE OF THE RIGHT-OF WAY PRIOR TO INSTALLATION OF THE CONSTRUCTION ENTRANCE TO AVOID DAMAGING OF THE ROADWAY. 2.IT IS RECOMMENDED THAT THE ENTRANCE BE CROWNED SO THAT RUNOFF DRAINS OFF THE PAD. 1 C-007 STABILIZED CONSTRUCTION ENTRANCE NOT TO SCALE REFERENCE: CITY OF RENTON STD. PLAN - 215.10 J:\ R 1 5 0 2 7 8 . 5 3 - S o o s C r e e k A M D 2 5 \ 1 0 C A D D & B I M \ 1 0 . 1 A u t o C A D \ S h e e t s \ 1 5 0 2 7 8 5 3 C - 0 0 8 . d w g T u e s d a y , O c t o b e r 0 7 , 2 0 2 5 2 : 4 8 p m IN COMPLIANCE WITH CITY OF RENTON STANDARDS 201 So. Jackson Street, Suite 700 Telephone: (206) 477-4527 Parks and Recreation Division Seattle, Washington 98104 Fax: (206) 263-6217 Department of Natural Resources and Parks King Street Center, KSC-NR-0700 OF SHEET TITLE CHECKED BY ID DRAWN BY FILE DATE DESCRIPTION ISSUE / REVISIONS CONTRACT NO. PH A S E 5 A E X T E N S I O N 150278.53 E00091E07 - AM. 25 SO O S C R E E K T R A I L SITE NO. PROJECT NO. ww w . h u i t t - z o l l a r s . c o m 17 0 0 7 t h A v e n u e , S u i t e 2 0 7 5 Se a t t l e , W a s h i n g t o n 9 8 1 0 1 - 1 3 6 0 20 6 . 3 2 4 . 5 5 0 0 KI N G C O U N T Y D E P A R T M E N T O F N A T U R A L RE S O U R C E S A N D P A R K S 3911 C-008 RHT VUL TESC STANDARD NOTES AND DETAILS 1 2 5/5/25 8/29/25 50% SUBMITTAL 90% SUBMITTAL 1 C-008 STRAW WATTLES NOT TO SCALE REFERENCE: CITY OF RENTON STD. PLAN - 213.40 10 APPENDIX B – SAMPLE CSWPP WORKSHEET FORMS CITY OF RENTON SURFACE WATER DESIGN MANUAL 2022 City of Renton Surface Water Design Manual 6/22/2022 8-E-1 REFERENCE 8-E CSWPP WORKSHEET FORMS E S C M A I N T E N A N C E R E P O R T Performed By: ___________________________ Date: ___________________________ Project Name: ___________________________ CED Permit #: ___________________________ Clearing Limits Damage OK Problem Visible OK Problem Intrusions OK Problem Other OK Problem Mulch Rills/Gullies OK Problem Thickness OK Problem Other OK Problem Nets/Blankets Rills/Gullies OK Problem Ground Contact OK Problem Other OK Problem Plastic Tears/Gaps OK Problem Other OK Problem Seeding Percent Cover OK Problem Rills/Gullies OK Problem Mulch OK Problem Other OK Problem Sodding Grass Health OK Problem Rills/Gullies OK Problem Other OK Problem Perimeter Protection including Silt Fence Damage OK Problem Sediment Build-up OK Problem Concentrated Flow OK Problem Other OK Problem REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET 6/22/2022 2022 City of Renton Surface Water Design Manual Ref 8-E-2 Flow Control, Treatment, and On-site BMP/Facility Protection Damage OK Problem Sedimentation OK Problem Concentrated Flow OK Problem Rills/Gullies OK Problem Intrusions OK Problem Other OK Problem Brush Barrier Damage OK Problem Sediment Build-up OK Problem Concentrated Flow OK Problem Other OK Problem Vegetated Strip Damage OK Problem Sediment Build-up OK Problem Concentrated Flow OK Problem Other OK Problem Construction Entrance Dimensions OK Problem Sediment Tracking OK Problem Vehicle Avoidance OK Problem Other OK Problem Wheel Wash Dimensions OK Problem Sed build up or tracking OK Problem Other OK Problem Construction Road Stable Driving Surf. OK Problem Vehicle Avoidance OK Problem Other OK Problem Sediment Trap/Pond Sed. Accumulation OK Problem Overtopping OK Problem Inlet/Outlet Erosion OK Problem Other OK Problem Catch Basin/Inlet Protection Sed. Accumulation OK Problem Damage OK Problem Clogged Filter OK Problem Other OK Problem Interceptor Dike/Swale Damage OK Problem Sed. Accumulation OK Problem Overtopping OK Problem Other OK Problem REFERENCE 8-E: CSWPP WORKSHEET FORMS 2022 City of Renton Surface Water Design Manual 6/22/2022 8-E-3 Pipe Slope Drain Damage OK Problem Inlet/Outlet OK Problem Secure Fittings OK Problem Other OK Problem Ditches Damage OK Problem Sed. Accumulation OK Problem Overtopping OK Problem Other OK Problem Outlet Protection Scour OK Problem Other OK Problem Level Spreader Damage OK Problem Concentrated Flow OK Problem Rills/Gullies OK Problem Sed. Accumulation OK Problem Other OK Problem Dewatering Controls Sediment OK Problem Dust Control Palliative applied OK Problem Miscellaneous Wet Season Stockpile OK Problem Other OK Problem Comments: Actions Taken: Problems Unresolved: