Loading...
HomeMy WebLinkAboutChange Order - 66 #"$ !        %   CAG-20-001, CO #66-26 Approved by Cheryl Beyer via email 10/29/2025 ŚĂŶŐĞKƌĚĞƌEŽ͘ ϲϲ ŽŶƚƌĂĐƚdŝƚůĞ͗ tŝůůŝĂŵƐǀĞ^ĂŶĚtĞůůƐǀĞ^ŽŶǀĞƌƐŝŽŶWƌŽũĞĐƚ ŽŶƚƌĂĐƚEŽ͘ 'ͲϮϬͲϬϬϭ WĂŐĞϮŽĨϭϭ d,KEdZd/^DK/&/^&K>>Kt^͗ ĞƐĐƌŝƉƚŝŽŶ͗ dŚŝƐŚĂŶŐĞƌĞƋƵŝƌĞƐƚŚĞŽŶƚƌĂĐƚŽƌƚŽƌĞŵŽǀĞƚŚĞĞdžŝƐƚŝŶŐƚƌĞĞŐƌĂƚĞƐĂŶĚŝŶƐƚĂůůŶĞǁ ĨƌĂŵĞƐĂƚ^dϯϭнϰϱZdĂŶĚ^dϵϰнϬϬ>d͕ƚŚĞŶƌĞŝŶƐƚĂůůƚŚĞĞdžŝƐƚŝŶŐƚƌĞĞŐƌĂƚĞƐŽŶƚŽƚŚĞ ŶĞǁĨƌĂŵĞƐƉĞƌ&ŝĞůĚŝƌĞĐƚŝǀĞηϳϱĂŶĚƚŚĞƌĞƐƉŽŶƐĞƚŽZ&/ηϭϲϱ͘dŚŝƐĐŚĂŶŐĞŽƌĚĞƌ ƌĞƉůĂĐĞƐƉĂLJŝƚĞŵĐƌĞĂƚĞĚǁŝƚŚĐŚĂŶŐĞŽƌĚĞƌϰϲ͘ WƌŽƉŽƐĂů^ĐŚĞĚƵůĞŽĨWƌŝĐĞƐ͗ ƚŚĞĨŽůůŽǁŝŶŐďŝĚŝƚĞŵƚŽ^ĐŚĞĚƵůĞϭ͗ ϭϰϲͲϭϲϲʹZĞŵŽǀĞĂŶĚZĞŝŶƐƚĂůůĚĚŝƚŝŽŶĂůdƌĞĞ'ƌĂƚĞƐ͕Ͳϭ^dΛΨϳ͕ϬϬϬ͘ϬϬсͲ Ψϳ͕ϬϬϬ͘ϬϬ ϭϲϲͲϭϵϬʹZĞǀŝƐĞĚZĞŵŽǀĂůĂŶĚZĞŝŶƐƚĂůůĂƚŝŽŶŽĨĚĚĞĚdƌĞĞ'ƌĂƚĞ&ƌĂŵĞƐ͕ϭ>^Λ Ψϱ͕Ϭϱϱ͘ϮϵсΨϱ͕Ϭϱϱ͘Ϯϵ ^ƉĞĐŝĨŝĐĂƚŝŽŶĂŶĚͬŽƌ^ƉĞĐŝĂůWƌŽǀŝƐŝŽŶ͗ EŽŶĞ͘ DĂƚĞƌŝĂůƐ͗ EŽŶĞ͘ DĞĂƐƵƌĞŵĞŶƚ͗ ƚŚĞĨŽůůŽǁŝŶŐƚŽ^WϴͲϯϰ͘ϰ͗ EŽƵŶŝƚŽĨŵĞĂƐƵƌĞŵĞŶƚƐŚĂůůĂƉƉůLJƚŽƚŚĞůƵŵƉƐƵŵŝƚĞŵ͞ZĞǀŝƐĞĚZĞŵŽǀĂůĂŶĚ ZĞŝŶƐƚĂůůĂƚŝŽŶŽĨĚĚĞĚdƌĞĞ'ƌĂƚĞ&ƌĂŵĞƐ͘͟ WĂLJŵĞŶƚ͗ ƚŚĞĨŽůůŽǁŝŶŐƚŽ^WϴͲϯϰ͘ϱ͗ ͞ZĞǀŝƐĞĚZĞŵŽǀĂůĂŶĚZĞŝŶƐƚĂůůĂƚŝŽŶŽĨĚĚĞĚdƌĞĞ'ƌĂƚĞ&ƌĂŵĞƐ͕͟ůƵŵƉƐƵŵ͘ WůĂŶƐ͗ EŽŶĞ͘ ZĞĂƐŽŶĨŽƌŚĂŶŐĞ͗ dŚĞĞdžŝƐƚŝŶŐƚƌĞĞŐƌĂƚĞƐĂƚ^dϯϭнϰϱZdĂŶĚ^dϵϰнϬϬ>dĂďƵƚƚĞĚƚŚĞƉƌŽƉŽƐĞĚƐŝĚĞǁĂůŬ͘ ƵƌŝŶŐƌĞŵŽǀĂůŽĨƚŚĞĞdžŝƐƚŝŶŐƐŝĚĞǁĂůŬ͕ŝƚǁĂƐĚŝƐĐŽǀĞƌĞĚƚŚĂƚĂŶĐŚŽƌƐĨƌŽŵƚŚĞĞdžŝƐƚŝŶŐ ƚƌĞĞŐƌĂƚĞĨƌĂŵĞƐǁĞƌĞĞŵďĞĚĚĞĚŝŶƚŚĞĐŽŶĐƌĞƚĞƚŽďĞƌĞŵŽǀĞĚ͘ƐĂƌĞƐƵůƚ͕ƚŚĞĞdžŝƐƚŝŶŐ ĨƌĂŵĞƐǁĞƌĞŝŵƉĂĐƚĞĚďLJƚŚĞƐŝĚĞǁĂůŬƌĞŵŽǀĂůĂŶĚƌĞƋƵŝƌĞĚƌĞƉůĂĐĞŵĞŶƚ͘dŚŝƐĐŚĂŶŐĞ ŽƌĚĞƌƌĞƉůĂĐĞƐƉĂLJŝƚĞŵĐƌĞĂƚĞĚǁŝƚŚĐŚĂŶŐĞŽƌĚĞƌϰϲ͘ ƋƵŝƚĂďůĞĚũƵƐƚŵĞŶƚ͗dŚŝƐŚĂŶŐĞKƌĚĞƌĚŽĞƐŝŶĐůƵĚĞĂŶĞƋƵŝƚĂďůĞĂĚũƵƐƚŵĞŶƚƉĞƌ^ĞĐƚŝŽŶϭͲ Ϭϵ͘ϰŽĨƚŚĞϮϬϭϴt^KdͬWt^ƚĂŶĚĂƌĚ^ƉĞĐŝĨŝĐĂƚŝŽŶƐ͘^ĞĞĂƚƚĂĐŚĞĚ͘  #"$ !       #"$ !      ,/Wh>Ͳ^dWϵϵϭϳ;ϯϰͿ LJ͗ WĞƌƚĞĞƚ ĂƚĞ͗ /ƚĞŵEŽ͘ YƵĂŶƚŝƚLJ hŶŝƚWƌŝĐĞ ϴ ϴϱ͘ϬϬΨ ΨϲϴϬ͘ϬϬ Ϭ͘ϮϵΨ ϴ ϴϱ͘ϬϬΨ ΨϲϴϬ͘ϬϬ Ϭ͘ϮϵΨ ϴ Ϯϱ͘ϬϬΨ ΨϮϬϬ͘ϬϬ Ϭ͘ϮϭΨ ϴ Ϯϱ͘ϬϬΨ ΨϮϬϬ͘ϬϬ Ϭ͘ϮϭΨ Ϯ ϱϬϬ͘ϬϬΨ Ψϭ͕ϬϬϬ͘ϬϬ Ϭ͘ϮϭΨ ϰ ϯϬϬ͘ϬϬΨ Ψϭ͕ϮϬϬ͘ϬϬ Ϭ͘ϮϭΨ Ψϭ͕ϭϭϵ͘ϮϬ ΨϬ͘ϭϮ >h>ddKd>͗ ^d/DddKd>͗ ϭϰϲͲϭϲϲ Ͳϭ ϳ͕ϬϬϬ͘ϬϬΨ ϭϲϲͲϭϵϬ ϭ ϱ͕Ϭϱϱ͘ϮϵΨ ^ƵŵŵĂƌLJŽĨŽŶƚƌĂĐƚŽƌƐYƵŽƚĞƐ͗ /ƚĞŵ YƵŽƚĞ>ŽĐĂƚŝŽŶ ϭϰϲͲϭϲϲ ^>ϮϬϲ dŽƚĂůYƵŽƚĞĚĚĚĞĚŽƐƚ͗ ƋƵŝƉŵĞŶƚDĂƌŬƵƉ ĞŶƚƐͬŽůůĂƌ ΨϰϮ͘ϬϬ ZĞŵŽĞůĂŶĚZĞŝŶƐƚĂůůĚĚĞĚdƌĞĞ'ƌĂƚĞƐ ^d ͲΨϳ͕ϬϬϬ͘ϬϬ >ĂďŽƌ;ĂƐĐĂĚĞͿͲZĞŵŽǀĞdžŝƐƚŝŶŐdƌĞĞ'ƌĂƚĞƐ ,ŽƵƌƐ ΨϲϴϬ͘ϬϬ ƋƵŝƉŵĞŶƚ;ĂƐĐĂĚĞͿͲZĞŵŽǀĞdžŝƐƚŝŶŐdƌĞĞ'ƌĂƚĞƐ ,ŽƵƌƐ ΨϮϬϬ͘ϬϬ >ĂďŽƌ;^ĂůŝŶĂƐͿͲ/ŶƐƚĂůůEĞǁ&ƌĂŵĞƐĨŽƌdƌĞĞ'ƌĂƚĞƐ ,ŽƵƌƐ ΨϲϴϬ͘ϬϬ >ĂďŽƌDĂƌŬƵƉ;^ĂůŝŶĂƐͿ ĞŶƚƐͬŽůůĂƌ Ψϭϵϳ͘ϮϬ ͲΨϭ͕ϵϰϰ͘ϳϭ ƋƵŝƉŵĞŶƚ;^ĂůŝŶĂƐͿͲ/ŶƐƚĂůůEĞǁ&ƌĂŵĞƐĨŽƌdƌĞĞ'ƌĂƚĞƐ ,ŽƵƌƐ ΨϮϬϬ͘ϬϬ ƋƵŝƉŵĞŶƚDĂƌŬƵƉ;^ĂůŝŶĂƐͿ ĞŶƚƐͬŽůůĂƌ ΨϰϮ͘ϬϬ Ψϭ͕ϮϬϬ͘ϬϬ ^ĞƌǀŝĐĞƐDĂƌŬƵƉ ĞŶƚƐͬŽůůĂƌ ΨϮϱϮ͘ϬϬ Ψϱ͕Ϭϱϱ͘Ϯϵ Ψϭϯϰ͘ϯϬ DĂƚĞƌŝĂůƐDĂƌŬƵƉ ĞŶƚƐͬŽůůĂƌ ΨϮϭϬ͘ϬϬ  Ψϭ͕ϬϬϬ͘ϬϬ ϱ͕Ϭϱϱ͘ϮϵΨ  ƐƚŝŵĂƚĞĚŚĂŶŐĞKƌĚĞƌŽƐƚ ĞŶƚƐͬŽůůĂƌ >^ ^ƵďĐŽŶƚƌĂĐƚŽƌDĂƌŬƵƉ;^ĂůŝŶĂƐͿ YƵŽƚĞĚŽƐƚ ϱ͕Ϭϱϱ͘ϮϵΨ  ŚĂŶŐĞKƌĚĞƌEŽ͘ϲϲ ^ŚĂŶŶŽŶdƌĞŵƉĞƌ ϭϬͬϵͬϮϬϮϱ tŝůůŝĂŵƐǀĞŶƵĞ^ΘtĞůůƐǀĞŶƵĞ^ŽŶǀĞƌƐŝŽŶWƌŽũĞĐƚ ĂƐĐĂĚĞŝǀŝůŽŶƐƚƌƵĐƚŝŽŶ 'ͲϮϬͲϬϬϭ ŚĂŶŐĞKƌĚĞƌŽƐƚ;ƋƵŝƚĂďůĞĚũƵƐƚŵĞŶƚͿ WƌŽũĞĐƚEĂŵĞ͗ ŽŶƚƌĂĐƚŽƌ͗ &ĞĚĞƌĂůŝĚEŽ͗ ŽŶƚƌĂĐƚEŽ͗ ŽŶƐƚƌƵĐƚŝŽŶDĂŶĂŐĞƌ͗ ĞƐĐƌŝƉƚŝŽŶ &ŽƌĐĞĐĐŽƵŶƚ hŶŝƚ ƐƚŝŵĂƚĞĚŽƐƚ Ψϱ͕Ϭϯϰ͘ϳϬ Ψϱ͕ϭϬϬ͘ϬϬ ŝĚ/ƚĞŵŚĂŶŐĞ ZĞǀŝƐĞĚZĞŵŽǀĂůĂŶĚZĞŝŶƐƚĂůůĂƚŝŽŶŽĨĚĚĞĚdƌĞĞ'ƌĂƚĞ&ƌĂŵĞƐ ^ĞƌǀŝĐĞƐ;WƌŽsĂĐͿͲZĞŵŽǀĞdƌĞĞZŽŽƚƐ ,ŽƵƌƐ DĂƚĞƌŝĂůƐ;ĂƐĐĂĚĞͿͲEĞǁ&ƌĂŵĞƐĨŽƌZĞŝŶƐƚĂůůĞĚdƌĞĞ'ƌĂƚĞƐ Ψϭϵϳ͘ϮϬ>ĂďŽƌDĂƌŬƵƉ ĞŶƚƐͬŽůůĂƌ Revised Removal and Replacement of Tree Grate Frames - Estimated Change Order Cost CO #66, Page 4 of 11  #"$ !      Project name: CAG Number: Date: COA DBE Bid Item Number Description Change Order Contract COA Commitment Change Order Amount (+/-) Net Change Order Amount Assigned to COA DBE New COA DBE Participation by Subcontractor and Bid Item Current COA DBE Participation (may be changed by WSDOT) O'Bunco 1-FA-A1 Houser Ave S Added Work 1 49,965.00$ 150,000.00$ 2,500.00$ 52,465.00$ 49,965.00$ O'Bunco 1-FA-B Houser Ave S Added Work 1 49,965.00$ 200,000.00$ 2,500.00$ 54,965.00$ 49,965.00$ O'Bunco 1-FA-C Houser Ave S Added Work 1 49,965.00$ 150,000.00$ 2,500.00$ 57,465.00$ 49,965.00$ O'Bunco 6-407 Sanitary Sewer on 2nd from Burnett to Williams 6 & 12 49,965.00$ 627,109.59$ 5,000.00$ 62,465.00$ 49,965.00$ O'Bunco 11-130 Elevation Revisions 11 49,965.00$ 70,000.00$ 31,000.00$ 93,465.00$ 49,965.00$ O'Bunco 25-218 Water Revisions 2nd (Wells) 25 49,965.00$ 7,000.00$ 2,500.00$ 95,965.00$ 49,965.00$ O'Bunco 25-219 Water Revisions 2nd (Williams) 25 49,965.00$ 2,000.00$ 2,500.00$ 98,465.00$ 49,965.00$ O'Bunco 56-180 Replace and Reestablish Monuments 56 49,965.00$ 3,386.20$ 3,211.70$ 101,676.70$ 49,965.00$ O'Bunco 65-189 Replace and Reestablish Monuments 65 49,965.00$ 1,979.60$ 1,767.50$ 103,444.20$ 49,965.00$ CUMULATIVE 49,965.00$ 53,479.20$ 98,465.00$ 49,965.00$ COA DBE Bid Item Number Description Change Order Contract COA Commitment Change Order Amount (+/-) Net Change Order Amount Assigned to COA DBE New COA DBE Participation by Subcontractor and Bid Item Current COA DBE Participation (may be changed by WSDOT) OMA Construction 11-130 Elevation Revisions 11 75,000.00$ 70,000.00$ 3,500.00$ 78,500.00$ 75,000.00$ OMA Construction 26-312 Remove and Replace CB#99 26 75,000.00$ 12,320.00$ 1,000.00$ 79,500.00$ 75,000.00$ CUMULATIVE 75,000.00$ 4,500.00$ 79,500.00$ 75,000.00$ COA DBE Bid Item Number Description Change Order Contract COA Commitment Change Order Amount (+/-) Net Change Order Amount Assigned to COA DBE New COA DBE Participation by Subcontractor and Bid Item Current COA DBE Participation (may be changed by WSDOT) Salinas 6-407 Sanitary Sewer on 2nd from Burnett to Williams 6 & 12 932,430.00$ 627,109.59$ 15,000.00$ 947,430.00$ 932,430.00$ Salinas 8-129 S 3rd ST Revised Work Sequence 8 932,430.00$ 70,714.00$ 24,200.00$ 971,630.00$ 932,430.00$ Salinas 11-130 Elevation Revisions 11 932,430.00$ 70,000.00$ 6,500.00$ 978,130.00$ 932,430.00$ Salinas 20-137 Added Concrete Pavement Reinforcement 20 932,430.00$ 20,000.00$ 18,000.00$ 996,130.00$ 932,430.00$ Salinas 25-223 Water Revisions 2nd 25 932,430.00$ 40,000.00$ 6,500.00$ 1,002,630.00$ 932,430.00$ Salinas 34-151 Reinforce Pavement Over CenturyLink Vault 34 932,430.00$ 10,000.00$ 8,000.00$ 1,010,630.00$ 932,430.00$ Salinas 37-311 Cement Conc. Traffic Curb and Gutter 37 932,430.00$ 1,125.00$ 800.00$ 1,011,430.00$ 932,430.00$ Salinas 37-313 Storm Sewer Revisions 37 932,430.00$ 30,000.00$ 5,700.00$ 1,017,130.00$ 932,430.00$ Salinas 41-157 Revised Concrete Labor Cost 41 932,430.00$ 8,799.64$ 8,799.64$ 1,025,929.64$ 932,430.00$ Salinas 42-158 Revised Sidewalk Around Coal Chute 42 932,430.00$ 17,000.00$ 8,500.00$ 1,034,429.64$ 932,430.00$ Salinas 45-165 Install Dragon Plaque 45 932,430.00$ 1,000.00$ 800.00$ 1,035,229.64$ 932,430.00$ Salinas 46-166 Tree Grate 46 932,430.00$ 7,000.00$ 2,000.00$ 1,037,229.64$ 932,430.00$ Salinas 48-66 Cement Conc. Sidewalk 48 932,430.00$ 112.00$ 90.00$ 1,037,319.64$ 932,430.00$ Salinas 49-170 Cement Conc. Pavement (Class 4000 Portland cement concrete) 49 932,430.00$ 133,778.71$ 133,778.71$ 1,171,098.35$ 932,430.00$ Salinas 49-171 Scored Colored Cement Conc. Crosswalk Pavement (Class 4000) 49 932,430.00$ 64,226.73$ 64,226.73$ 1,235,325.09$ 932,430.00$ Salinas 49-172 Cement Conc. Driveway Entrance (Class 4000 Portland cement concr 49 932,430.00$ 33,455.10$ 33,455.10$ 1,268,780.19$ 932,430.00$ Salinas 49-173 Cement Conc. Sidewalk (Class 4000 Portland cement concrete) 49 932,430.00$ 289,441.20$ 289,441.20$ 1,558,221.39$ 932,430.00$ Salinas 49-174 Thickened Edge Sidewalk (Class 4000 Portland cement concrete) 49 932,430.00$ 33,788.10$ 33,788.10$ 1,592,009.49$ 932,430.00$ Salinas 49-20 Cement Conc. Pavement 49 932,430.00$ (149,075.00)$ (149,075.00)$ 1,442,934.49$ 932,430.00$ Salinas 49-21 Scored Colored Cement Conc. Crosswalk Pavement 49 932,430.00$ (69,824.00)$ (69,824.00)$ 1,373,110.49$ 932,430.00$ Salinas 49-61 Cement Conc. Driveway Entrance 49 932,430.00$ (35,700.00)$ (35,700.00)$ 1,337,410.49$ 932,430.00$ Salinas 49-66 Cement Conc. Sidewalk 49 932,430.00$ (309,120.00)$ (309,120.00)$ 1,028,290.49$ 932,430.00$ Salinas 49-67 Thickened Edge Sidewalk 49 932,430.00$ (36,180.00)$ (36,180.00)$ 992,110.49$ 932,430.00$ Salinas 53-176 Markup for Concrete Subcontractor Labor Rate Increase 53 932,430.00$ 3,914.08$ 3,914.08$ 996,024.57$ 932,430.00$ Salinas 49-170 Cement Conc. Pavement (Class 4000 Portland cement concrete) 54 932,430.00$ (133,778.71)$ (133,778.71)$ 862,245.85$ 932,430.00$ Salinas 49-171 Scored Colored Cement Conc. Crosswalk Pavement (Class 4000) 54 932,430.00$ (64,226.73)$ (64,226.73)$ 798,019.12$ 932,430.00$ Salinas 54-177 Cement Conc. Pavement (Class 4000 3-Day Paving Mix instead of Cl 54 932,430.00$ 138,372.61$ 138,372.61$ 936,391.73$ 932,430.00$ Salinas 54-178 Scored Colored Cement Conc. Crosswalk Pavement (Class 4000 3-Da 54 932,430.00$ 65,907.75$ 65,907.75$ 1,002,299.47$ 932,430.00$ Salinas 66-166 Revised Removal and Reinstallation of Added Tree Grate Frames 66 932,430.00$ (7,000.00)$ (2,000.00)$ (2,000.00)$ 932,430.00$ Salinas 66-190 Revised Removal and Reinstallation of Added Tree Grate Frames 66 932,430.00$ 5,055.20$ 1,200.00$ (800.00)$ 932,430.00$ CUMULATIVE 932,430.00$ 69,069.47$ 1,000,354.67$ 932,430.00$ TOTALS 1,057,395.00$ 127,048.67$ 1,178,319.67$ 1,057,395.00$ Non-COA DBE Bid Item Number Description Change Order Contract COA Commitment Change Order Amount (+/-) Net Change Order Amount Assigned to COA DBE New COA DBE Participation by Subcontractor and Bid Item Current COA DBE Participation (may be changed by WSDOT) Out West 30-45 PS Amelanchier laevis 'JFS-ARB'/ Spring Flurry Serviceberry; 2.5" cal., 1 30 154,950.00$ (11,400.00)$ (11,400.00)$ 143,550.00$ 154,950.00$ Williams Ave S and Wells Ave S Conversion Project 10/10/2025 Change Order DBE Participation Tracking (LAG 26.35) CAG-20-001  #"$ !      Out West 30-46 PS Acer x Freemanii 'Scarsen'/ Scarlet Sentinel Maple; 2.5" cal., 12'-14' 30 154,950.00$ (3,000.00)$ (3,000.00)$ 140,550.00$ 154,950.00$ Out West 30-49 PS Spiraea japonica 'Yan'/ Double Play Gold Spirea; 2 Gal. Cont. 30 154,950.00$ (500.00)$ (500.00)$ 140,050.00$ 154,950.00$ Out West 30-142 PS Parrotia Persica 'Vanessa'/Persian Ironwood; 2" cal, 10'-14' ht. 30 154,950.00$ 4,928.00$ 4,928.00$ 144,978.00$ 154,950.00$ Out West 30-143 PS Nyssa Sylvatica 'Wildfire'/Wildfire Tupelo; 2" cal, 10'-14' ht. 30 154,950.00$ 7,280.00$ 7,280.00$ 152,258.00$ 154,950.00$ Out West 30-144 PS Sorbus American 'Dwarfcrown'/Red Cascade Mountain Ash, 2.5" c 30 154,950.00$ 2,240.00$ 2,240.00$ 154,498.00$ 154,950.00$ Out West 30-145 PS Zelkova Serrata 'JFD-KW1'/City Sprite, 2.5" cal; 10'-14' ht. 30 154,950.00$ 840.00$ 840.00$ 155,338.00$ 154,950.00$ Out West 30-146 PS Amelanchier laevis 'JFS-ARB'/Spring Flurry Serviceberry; 1.5" cal, 10 30 154,950.00$ 1,960.00$ 1,960.00$ 157,298.00$ 154,950.00$ Out West 30-147 PS Berberis Thunbergii 'Admiration'/Japanese Barberry; 2 Gal Cont. 30 154,950.00$ 1,232.00$ 1,232.00$ 158,530.00$ 154,950.00$ Out West 52-156 Delete Remaining Punch List Items 52 154,950.00$ (10,500.00)$ (1,000.00)$ 157,530.00$ 154,950.00$ Out West 59-183 Irrigation Revisions 59 154,950.00$ 2,314.96$ 2,091.66$ 159,621.66$ 154,950.00$ CUMULATIVE 154,950.00$ 4,671.66$ 159,621.66$ 154,950.00$ Non-COA DBE Bid Item Number Description Change Order Contract COA Commitment Change Order Amount (+/-) Net Change Order Amount Assigned to COA DBE New COA DBE Participation by Subcontractor and Bid Item Current COA DBE Participation (may be changed by WSDOT) Mak's 21-138 Removal Railroad Ties and Concrete 21 2,000.00$ 40,000.00$ 10,000.00$ 12,000.00$ 2,000.00$ Mak's 25-223 Disconnect Existing Water Mains at 2nd and Burnett 25 2,000.00$ 40,000.00$ 1,000.00$ 13,000.00$ 2,000.00$ Mak's 6-407 Sanitary Sewer on 2nd from Burnett to Williams 6 & 12 2,000.00$ 627,109.59$ 5,000.00$ 18,000.00$ 2,000.00$ CUMULATIVE 2,000.00$ 16,000.00$ 18,000.00$ 2,000.00$ TOTALS 156,950.00$ 20,671.66$ 177,621.66$ 156,950.00$ 1,178,319.67$ 177,621.66$ 1,355,941.33$ 1,214,345.00$ Amount of COA plus non-COA DBE Participation Applied to COA (may be changed by WSDOT) Current Contract COA DBE Participation Available Current Contract Non-COA DBE Participation Current Contract COA plus non-COA DBE Participation  #"$ !      FFIELD D I RE CT I VE Project Name Federal Aid # Contract No. Date Field Directive Description Field Directive No. Contractor Project Engineer (or Representative) Date Jordan Howe Williams Ave S and Wells Ave S Conversion Project 2707 Colby Avenue, Suite 900, Everett, WA 98201 | P 425.252.7700 4/19/2021 Cascade Civil Construction Tree Pit at STA 31+45 RT 075 HIPUL-STP 9917 (034) CAG 20-001 4/19/2021 dŚĞĨŽůůŽǁŝŶŐŝƐĚŽĐƵŵĞŶƚĂƚŝŽŶŽĨĂŶŽƌĂůŽƌĚĞƌŐŝǀĞŶďLJƚŚĞŶŐŝŶĞĞƌƉĞƌt^Kd^ƉĞĐŝĨŝĐĂƚŝŽŶϭͲϬϰ͘ϰ͘ dŚĞŽŶƚƌĂĐƚŽƌƐŚĂůůƌĞŵŽǀĞƚŚĞƐŝĚĞǁĂůŬƚŽ^dϯϭнϱϬŽŶƚŚĞĞĂƐƚƐŝĚĞŽĨtŝůůŝĂŵƐ͘dŚĞŽŶƚƌĂĐƚŽƌƐŚĂůůĂůƐŽƌĞŵŽǀĞƚŚĞƚƌĞĞ ƐƚƵŵƉĂŶĚƚƌĞĞŐƌĂƚĞ͘dŚĞŽŶƚƌĂĐƚŽƌƐŚĂůůŝŶƐƚĂůůĂŶĞǁƚƌĞĞ;dƵƉĞůŽͲ DĂƚĐŚƚŚĞZĞƐƚŽĨƚŚĞdƌĞĞƐͲ Ϯ͘ϱΗĐĂů͕ϭϬΖͲϭϰΖŚĞŝŐŚƚͿ͕ƌĞŝŶƐƚĂůů ƚŚĞƚƌĞĞŐƌĂƚĞĂƚ^dϯϭнϰϱZd͕ĂŶĚŝŶƐƚĂůůŶĞǁƐŝĚĞǁĂůŬ͘ dŚĞǁŽƌŬƚŽƌĞŵŽǀĞĂŶĚƌĞƐƚŽƌĞƚŚŝƐƐĞĐƚŝŽŶŽĨƐŝĚĞǁĂůŬĂŶĚƚŽŝŶƐƚĂůůƚŚĞƚƌĞĞǁŝůůďĞƉĂŝĚďLJďŝĚŝƚĞŵ͘dŚĞǁŽƌŬƚŽƌĞŵŽǀĞĂŶĚ ƌĞƉůĂĐĞƚŚĞƚƌĞĞŐƌĂƚĞĂŶĚƌĞŵŽǀĞƚŚĞĞdžŝƐƚŝŶŐƚƌĞĞƐƚƵŵƉǁŝůůďĞƚƌĂĐŬĞĚĂŶĚƉĂŝĚďLJĨŽƌĐĞĂĐĐŽƵŶƚĂƐƉĂƌƚŽĨĂĨƵƚƵƌĞŚĂŶŐĞ KƌĚĞƌ͘ Revised Removal and Replacement of Tree Grate Frames - Field Directive 75 CO #66, Page 7 of 11  #"$ !      Revised Removal and Replacement of Tree Grate Frames - Contractor's Quote CO #66, Page 8 of 11  #"$ !      Re v i s e d R e m o v a l a n d R e p l a c e m e n t o f T r e e G r a t e F r a m e s - C o n t r a c t o r ' s Q u o t e CO # 6 6 , P a g e 9 o f 1 1   # "       $   !                                   Revised Removal and Replacement of Tree Grate Frames - Contractor's Quote CO #66, Page 10 of 11  #"$ !      Revised Removal and Replacement of Tree Grate Frames - Contractor's Quote CO #66, Page 11 of 11  #"$ !