HomeMy WebLinkAboutW-438410INLkU 611 -, 1 4 " PINE - _ _ _ I�VC l q' PINEPINE _ -
SYMBOLSLEGEND
a" �'I 1 2" IN E _ z�-�
SPINDYI 1 PINE Q _ fo P1
x �o J �J PI E 6' PI +� n r � �3 PROPERTY LINE Iz
c
Pi E Iz
�M -- -- --- - = �r— -- — — --- — �' --- — — — -- --- --- ----- -- — ----- -- ---- -- — — —— —� - ------------- — o EXISTING CONCRETE TO REMAIN = — 4)
W _ L
/��
TR 8 PINE
q E . V ? _— — — — — — �g { EXISTING TO REMAIN
i ILn +
( c
o
b cp .a — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — N N
7r �
CV .s — — — — — a+25.0�-y P EXISTING PARKING STRIPE TO REMAIN
26 47 Lx �
+2655
u�
$'o�to AD �$ EXISTING CONCRETE TO BE SAWCUTAN❑ REMOVED n,
�j IE(W)=25.96'
1
b 4"PVC EXIS�JT�AREMOVED
IVA
12"CMP�NDERWAI
PROPOSED ASPHALT PAVEMENT TO MATCH EXISTING
t rr 2%� PROPOSED CONCRETE TANK PAD
v— — c
IE(F)=25.94'
4fPROPOSED
4"P V C
A EXISTING GRADE
A L.i4 I I i4 J
+ - t` MEG 26.50 J~c „ _� � 26.55 MEG e .° _ �� PROPOSED EDGE OF PAVEMENT ELEVATION (FT) C)
0
U)
tr 260 PROPOSED TOP OF CONCRETE f EDGE OF PAVEMENT Co
zs.T 3 +28.s� 0 0 ELEVATION (FT) J w 200
❑ter
+ MEG 26.50 MEG
PROPOSED SURFACE FLOW J LU CO
+_���
t2s,5; i if PROPOSED UNEVEN TRANSITION }
^,^
{'a W �• � b a i� i4
PROPOSED EVEN TRANSITION W —
q g k " ABBREVIATIONS: ❑
H� el,�
in ?a �.96�_99 p0 �4 r ti
+' - +26.89 .� + ,� `�',�' " " AST ABOVEGROUND STORAGE TANK
DEF DIESEL EXHAUST FLUID W r
❑W DOUBLE WALL
FE FIRE EXTINGUISHER N
'00q FIFE FINISHED FLOOR ELEVATION
HP HIGH POINT
MAX MAXIMUM
MEG MATCH EXISTING GRADE
MIN MINIMUM
O.C. ON CENTER
TOC TOP OF CURB
TOS TOP OF SLAB
TYP TYPICAL
UST UNDERGROUND STORAGE TANK
VIF VERIFY IN FIELD
ENTf,Y ~ \ EN 2Y ~ ~ BEN N , ~
ra K
w
BUILDING
LL
ENTRY ENTRY ENTRY
14
A
o�
EN- Y
F
L
:%FA J 5�
.fi£ 4�=321
BUILDING HT=23.7'
VENT N
ENZRY
U_
LL
4.
.q
'. I
+`)'6
'
°
7 �9
I�
e
O cy
196b 4-
7
v:
4'
a d
d
W
le.
I
a
�
C
q �
A.
e
d
A. I
�
27-63
03
a.
7:. 4
d
°
p19¢
a2k
q
v.
d.
d
r
�0
. tO) ..4
q
a.
Y
a
zv
T
e
f
4
a .
if
4
a
4
q J
d
a a s
a .
44 a d
i \ +
�Ifo a 9 �pR
MEG
ti
MEG[
MEG
MEG
266,$
CONSTRUCTION
NOTE:
CONTRACTOR TO VERIFY ALL UNDERGROUND UTILITIES BEFORE
CONSTRUCTION BEGINS. NOTIFY THE FOR IN CASE OF ANY DISCREPANCY.
CONTRACTOR TO ENSURE THE EXISTING DRAINAGE PATTERN FOR THE SITE
SHALL BE MAINTAINED AT ALL TIMES
THIS SHEET NOT REVIEWED BY CITY OF REfVTON
z
�C'L
V
C)
00
Nt
C)
C)
LO
N
6 ,
u
i FINITY ENGINEERIItiG
CROUP, LLC
1208 East Kcnncdy Butilcr-ard
Suitc 230
Tampa, Florida 33602
[p ]: 813.131.4770
[f : 813.445.4211
W %'w.icprouP.nct
Cw. of Auth. No. 603-536-314
O z LO CL 0
o
r r
CVj O >1
13
CD
I` Y
d3
a
RICHARD HERNANDEZ, P.E.
WA REG. NO. 50841
Digitally signed b
Richard Hernande
HEN DN: c=U5,
Ok
WA '4 serialNumber=AA 202
Sw �� 40410344595,
cn=Richard Herna e7,
email=rchard@ie up
50841 net
is a` Date: 2025.12.1 1
Ow Ai.
AdubeAcrobave ion,
� 1k
GRADING PLAN
, ASCALE : 1" = 10'
1
ISP-4-4 / P—`t
-438410