HomeMy WebLinkAboutRS_Emergency-Repair_Material-SummaryType Description Total Note/Unit
Summary
Equipment Excavator 30.5 Operating
Equipment Excavator 10.5 Standby
Equipment Wheel Loader 8 Operating
Equipment Wheel Loader 31 Standby
Equipment Tractor 67 Operating
Equipment Trailor 67 Operating
Material Steel plate 17 Each
Material Geotextile 0 0
Material Coir mat 5 Rolls
Material Asphalt cold mix 26 Tons
Material Large rock (basalt, 3-5 ma 307.93 Tons
Material Top soil 26 Tons
Material Straw 0 0
Material Seed 0 0
Material Quarry spall (4-8 inch) 26 Tons
12/15/2025 12/16/2025 12/17/2025 12/18/2025
Johansen & County met
on site at 07:00 to
discuss scope of work.
Both agreed to general
scope of work. County
provided notice to
proceed. Johansen
mobilized excavator and
loader to site.
Contractor cleared two
trees and flattened area
near slide. Steel plates
delivered/placed. Cold
mix installed as ramp.
11 trucks of rock
delivered throughout day.
Geotextile fabric laid
down. Rock added to
match existing slope.
~307.93 tons delivered
(~237 CY).
Quarry spalls (4-8")
delivered/spread to fill
voids. Top soil delivered
to cover disturbed soils
where steel plates were.
TCP utilized throughout
day.
0 8 6.5 8
8 0 2.5 0
0022
8856
4 4 40 0
4 4 40 0
017 0 0
0000
0000
026 0 0
0 0 307.93 0
00026
0000
0000
00026
12/19/2025 12/22/2025
TCP setup. Haul off steel
plates, spread remaining
top soil and level ground.
Seed/mats placed.
Excavator tracked
out/smoothing. TCP
takedown/demob.
Johansen demobilized
excavator.
80
00
40
40
16 3
16 3
00
00
50
00
00
00
00
00
00