HomeMy WebLinkAboutAddendum - 2Supplemental Agreement
Number
Organization and Address
Phone:
Original Agreement Number
Project Number Execution Date Completion Date
Project Title New Maximum Amount Payable
Description of Work
The Local Agency of
desires to supplement the agreement entered in to with
and executed on DQGLGHQWL¿HGDV$JUHHPHQW1R
$OOSURYLVLRQVLQWKHEDVLFDJUHHPHQWUHPDLQLQHႇHFWH[FHSWDVH[SUHVVO\PRGL¿HGE\WKLVVXSSOHPHQW
The changes to the agreement are described as follows:
I
Section 1, SCOPE OF WORK, is hereby changed to read:
II
6HFWLRQ,97,0()25%(*,11,1*$1'&203/(7,21LVDPHQGHGWRFKDQJHWKHQXPEHURIFDOHQGDUGD\V
for completion of the work to read:
III
6HFWLRQ93$<0(17VKDOOEHDPHQGHGDVIROORZV
DVVHWIRUWKLQWKHDWWDFKHG([KLELW$DQGE\WKLVUHIHUHQFHPDGHDSDUWRIWKLVVXSSOHPHQW
If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate
VSDFHVEHORZDQGUHWXUQWRWKLVRႈFHIRU¿QDODFWLRQ
By:By:
Consultant Signature Approving Authority Signature
Date
DOT Form 140-063
Revised 09/2005
City of Renton
ESM Consulting Engineers, LLC
1/12/2026 CAG-24-311
The Scope of Work of the Original Agreement is supplemented to include the attached Exhibit A.
The completion date remains 12/31/2034
Refer to attached Exhibit A. The maximum amount payable is increased by $23,460 from
$120,353 to $143,813.
2
CAG-24-311
ESM Consulting Engineers, LLC
32001 32nd Ave S, Suite 200
Federal Way, WA 98001
253-838-6113
TED4004265 1/21/2026 12/31/2034
Maplewood Sidewalk Rehabilitation
This task includes providing engineering design support during construction.
Laura Bartenhagen Martin Pastucha, Public Works Administrator
Consultant Sig
aura Bartenhageng
"!#
$
CAG-24-311, Adden #2-26
Scope of Work
Task 9 - Design Support During Construction
SUPPLEMENTAL AGREEMENT ENGINEERING AND SURVEYING COST ESTIMATE WORKSHEET
ESM CONSULTING ENGINEERS, LLC ESM JOB NO: 215-006-011
PROJECT NO: CAG-24-311 Date: 1/16/2025
PROJECT NAME: MAPLEWOOD SIDEWALK REHABILITATION
137.13%
Pay rates are effective from January 1, 2026 to December 31, 2026, within the ranges shown in the attachment.23%
Only key staff are shown and other staff may work on and charge to the project as needed by the project manager.
ENGINEERING SURVEYING
Project
Manager
Quality
Control
Senior
Engineer Engineer II Senior
Designer
CAD
Support
Principal
PLS Survey P.M.Sr. Survey
Tech
2-Man Scan
Crew
Project
Admin
Initials LGB TLS BL DRD JJH BA ZL JG/BP
RG
KL/ML KEY
Cost Rate 80.00$80.00$59.00$42.00$56.00$36.00$76.44$52.00$40.00$82.00$31.50$
Overhead 109.70$109.70$80.91$57.59$76.79$49.37$104.82$71.31$54.85$112.45$43.20$
Fee (as % of Labor)18.40$18.40$13.57$9.66$12.88$8.28$17.58$11.96$9.20$18.86$7.25$
Fully Burdened Rate 208.10$208.10$153.48$109.25$145.67$93.65$198.84$135.27$104.05$213.31$81.94$
Work Task Hours Cost
1 Task 9 - Design Support During Construction
2 A. Design Support 8 16 2 2 28 397.69$
3 B. Coordination & Site Visits 24 2 2 28 397.69$
4 C. Attend all weekly construction mtgs 24 4 24 10
5 D. Review and response to all RFIs 8 22
6 E. Review and signature on all COs 8 8 1,664.83$
Total Hours 72404010060600138
Labor Costs 14,983.49$832.42$-$4,370.18$1,456.73$-$1,193.06$-$624.31$-$-$23,460.19$
Miscellaneous Expenses:Subconsultants:Subs
Item
1 Federal Express / Courier -$-$
2 Phone -$-$
3 Postage -$-$
4 Photography -$-$
5 Travel Expenses (mileage)-$-$
6 Reproduction -$-$
Total Reimbursable Expenses $0 -$
###
EXHIBIT A
This task includes providing engineering design support during construction.
TOTAL ESTIMATE
Total Subconsultants
23,460$
Reimb.
Cost
Overhead Rate
Fee as % of Labor
Item
"!#