HomeMy WebLinkAboutChange Order - 581/15/2026
! "
#
CAG-22-163, CO #58-26
Approved by Cheryl Beyer via email 1/16/2026
Change Order No. 58
Contract Title: Rainier Ave S. Corridor Improvements – Phase 4
Contract No. CAG-22-163
Page 2 of 13
THE CONTRACT IS MODIFIED AS FOLLOWS:
Description of Change:
This Change adds the installation of a 2-inch Schedule 80 conduit from the proposed small cable
vault at approximately STA 200+80 LT to STA 204+55 LT, along with the installation of a new Type
2 junction box at STA 204+55 LT to access where the existing conduit will be intercepted. This
Change adds the removal of the existing junction boxes at approx. STA 201+13 LT, 202+20 LT,
202+36 LT, and 204+52 LT. This Change adds the removal of the existing fiber cable from the
existing conduit and repulling it from the new junction box at approx. 204+55 LT to the small cable
vault through the newly installed conduit.
Proposal Schedule of Prices:
ADD the following to Schedule A:
58-A235 – Added Conduit and Junction Box to Maintain Existing Interconnect on S 3rd
St, 1 EST @ $16,000.00 = $16,000.00
Specification and/or Special Provision:
No change.
Description:
The Contractor shall install a 2-inch Schedule 80 conduit from the proposed small cable
vault at approximately STA 200+80 LT to approximately STA 204+55 LT. The Contractor shall
install a new Type 2 junction box at approximately STA 204+55 LT to access and intercept
the existing conduit. The Contractor shall remove the existing junction boxes at approx. STA
201+13 LT, 202+20 LT, 202+36 LT, and 204+52 LT., pull the existing fiber cable out of the
existing conduit, and repull it from the junction box at STA 204+55 LT to the small cable
vault at STA 200+80 LT through the new conduit as directed in the response to RFI 503.
Materials:
As specified in Special Provision 8-20.
Measurement:
ADD the following section 2-03.4:
No unit of measurement shall apply to the force account item “Added Conduit and Junction
Box to Maintain Existing Interconnect on S 3rd St.”
! "
Change Order No. 58
Contract Title: Rainier Ave S. Corridor Improvements – Phase 4
Contract No. CAG-22-163
Page 3 of 13
Payment:
ADD the following section 2-03.5:
“Added Conduit and Junction Box to Maintain Existing Interconnect on S 3rd St ,” force
account.
Plans:
As shown in response to RFI 503.
Reason for Change:
There was existing City fiber interconnect along the north curb line of S 3rd St., including
multiple junction boxes containing active fiber that were in conflict with the proposed
roadway. To construct the roadway as shown in the plans, the fiber and junction boxes
needed to be removed. To maintain system continuity, new conduit and a new junction box
needed to be installed. This Change is necessary to establish a new conduit route for
interconnect fiber while meeting the requirements of the roadway plans.
This Change is required to create an item to compensate the Contractor for the efforts
needed to remove the existing junction boxes and install the new conduit and junction box
as required by the response to RFI #503.
Equitable Adjustment:
This Change Order does include an equitable adjustment per Section 1-09.4 of the 2022
WSDOT/APWA Standard Specifications. See attached.
Estimated Cost: $16,000.00
Extended Overhead: $ 0.00
Force Account Time Related Damages per 1-09.6.6.d: $ 0.00
Estimated Sales Tax (if applicable): $ 0.00
Total: $16,000.00
58-A235 – Added Conduit and Junction Box to Maintain Existing Interconnect on S 3rd St
An independent estimate was prepared for the cost of removing existing junction boxes
and installing conduit and a new junction box on S 3rd St. The cost was calculated to be
$15,218.16 and has been rounded to an estimated cost of $16,000.00.
Extension of Time: The Time for Completion is extended 0 Working Days.
! "
Change Order No. 58
Contract Title: Rainier Ave S. Corridor Improvements – Phase 4
Contract No. CAG-22-163
Page 4 of 13
Affects DBE Work:
Yes.
Sections 1-04.4 and 1-04.5 of the 2022 WSDOT/APWA Standard Specifications shall govern
this Change Order. The Work of the referenced Contract is modified to include the changes
detailed herein. The payment provided for herein shall constitute the complete and final
settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all
other claims that may be made by the Contractor because of this change.
To be attached to Change Order:
܈ 1-Estimated Change Order Cost
܈ 2-Plans
܈ 3-Field Directive/Request for Information Response
܆ 4-Change Order Quotation
܆ 5-Project Labor List
܆ 6-Force Account Equipment Rate Request (DOT Form 422-010 EF)
܆ 7-Equitable Adjustment Determination
܆ 8-Additional Working Days Calculation
! "
^dWh>Ͳϭϲϭϱ;ϬϬϱͿ LJ͗
WĞƌƚĞĞƚ ĂƚĞ͗
/ƚĞŵEŽ͘ YƵĂŶƚŝƚLJ hŶŝƚWƌŝĐĞ ƐƚŝŵĂƚĞĚŽƐƚ
ϱϴͲϮϯϱ
ϯϮ ϭϭϴ͘ϬϬΨ ϯ͕ϳϳϲ͘ϬϬΨ
Ϯϴ ϲϱ͘ϬϬΨ ϭ͕ϴϮϬ͘ϬϬΨ
ϴ ϲϱ͘ϬϬΨ ϱϮϬ͘ϬϬΨ
ϲ͕ϭϭϲ͘ϬϬΨ Ϭ͘ϯϭΨ ϭ͕ϴϵϱ͘ϵϲΨ
ϯϮ ϰϲ͘ϬϬΨ ϭ͕ϰϳϮ͘ϬϬΨ
Ϯϰ ϱϯ͘ϬϬΨ ϭ͕ϮϳϮ͘ϬϬΨ
ϴϴ͘ϬϬΨ ϲϰ͘ϬϬΨ
Ϯ͕ϴϬϴ͘ϬϬΨ Ϭ͘ϮϭΨ ϱϴϵ͘ϲϴΨ
ϰϬϬ ϰ͘ϬϬΨ ϭ͕ϲϬϬ͘ϬϬΨ
ϭ ϭϬϬ͘ϬϬΨ ϭϬϬ͘ϬϬΨ
ϭ ϭϬϬ͘ϬϬΨ ϭϬϬ͘ϬϬΨ
ϭ͕ϴϬϬ͘ϬϬΨ Ϭ͘ϮϭΨ ϯϳϴ͘ϬϬΨ
ϭϯ͕ϱϴϳ͘ϲϰΨ Ϭ͘ϭϮΨ ϭ͕ϲϯϬ͘ϱϮΨ
ϭϱ͕Ϯϭϴ͘ϭϲΨ
ϭϲ͕ϬϬϬ͘ϬϬΨ
ϱϴͲϮϯϱ ϭ Ψϭϲ͕ϬϬϬ͘ϬϬ Ψϭϲ͕ϬϬϬ͘ϬϬ
ϭϲ͕ϬϬϬ͘ϬϬΨ
^ƵŵŵĂƌLJŽĨŽŶƚƌĂĐƚŽƌƐYƵŽƚĞƐ͗
/ƚĞŵ YƵŽƚĞ>ŽĐĂƚŝŽŶ
Eͬ
dŽƚĂůYƵŽƚĞĚĚĚĞĚŽƐƚ͗
ĚĚĞĚŽŶĚƵŝƚĂŶĚ:ƵŶĐƚŝŽŶŽdžƚŽDĂŝŶƚĂŝŶdžŝƐƚŝŶŐ
/ŶƚĞƌĐŽŶŶĞĐƚŽŶ^ϯƌĚ^ƚ
>ĂďŽƌͲ'ŽůĚĞŶ'ĂƚĞ;ůĞĐƚƌŝĐŝĂŶ&ŽƌĞŵĂŶͿ ,ŽƵƌƐ
/ŶĚĞƉĞŶĚĞŶƚŽƐƚƐƚŝŵĂƚĞ
/ƚĞŵŚĂŶŐĞ
ĞƐĐƌŝƉƚŝŽŶ hŶŝƚ
ĞŶƚƐͬŽůůĂƌ
DĂƚĞƌŝĂůƐ;'ŽůĚĞŶ'ĂƚĞͿ;ϮΗ^ĐŚ͘ϴϬŽŶĚƵŝƚͿ >&
DĂƚĞƌŝĂůƐDĂƌŬƵƉ;'ŽůĚĞŶ'ĂƚĞͿ ĞŶƚƐͬŽůůĂƌ
^ƵďĐŽŶƚƌĂĐƚŽƌDĂƌŬƵƉ͕фΨϮϱ͕ϬϬϬ ĞŶƚƐͬŽůůĂƌ
,ŽƵƌƐ
ƋƵŝƉŵĞŶƚDĂƌŬƵƉ;'ŽůĚĞŶ'ĂƚĞͿ
ŚĂŶŐĞKƌĚĞƌŽƐƚ;ƋƵŝƚĂďůĞĚũƵƐƚŵĞŶƚͿ ŚĂŶŐĞKƌĚĞƌEŽ͘ϱϴ
WƌŽũĞĐƚEĂŵĞ͗ZĂŝŶŝĞƌǀĞ^ŽƌƌŝĚŽƌ/ŵƉƌŽǀĞŵĞŶƚƐͲWŚĂƐĞϰ
ŽŶƚƌĂĐƚŽƌ͗WŝǀĞƚƚĂƌŽƚŚĞƌƐŽŶƐƚƌƵĐƚŝŽŶ͕/ŶĐ͘
ŽŶƚƌĂĐƚEŽ͗'ͲϮϮͲϭϲϯ
&ĞĚĞƌĂůŝĚEŽ͗^ŚĂŶŶŽŶdƌĞŵƉĞƌ
ŽŶƐƚƌƵĐƚŝŽŶDĂŶĂŐĞƌ͗ϭϮͬϭͬϮϬϮϱ
ĚĚĞĚŽŶĚƵŝƚĂŶĚ:ƵŶĐƚŝŽŶŽdžƚŽDĂŝŶƚĂŝŶdžŝƐƚŝŶŐ
/ŶƚĞƌĐŽŶŶĞĐƚŽŶ^ϯƌĚ^ƚ ^d
dKd>,E'KZZK^d
YƵŽƚĞĚŽƐƚ
Eͬ
>ĂďŽƌͲ'ŽůĚĞŶ'ĂƚĞ;ƉƉƌĞŶƚŝĐĞůĞĐƚƌŝĐŝĂŶͿ ,ŽƵƌƐ
>ĂďŽƌͲ'ŽůĚĞŶ'ĂƚĞ;ƉƉƌĞŶƚŝĐĞůĞĐƚƌŝĐŝĂŶͿ ,ŽƵƌƐ
>ĂďŽƌDĂƌŬƵƉ;'ŽůĚĞŶ'ĂƚĞͿ ĞŶƚƐͬŽůůĂƌ
^d/DddKd>͗
ƋƵŝƉŵĞŶƚͲ'ŽůĚĞŶ'ĂƚĞ;WŝĐŬƵƉdƌƵĐŬͿ ,ŽƵƌƐ
ƋƵŝƉŵĞŶƚͲ'ŽůĚĞŶ'ĂƚĞ;ƵŵƉdƌĂŝůĞƌͿ ,ŽƵƌƐ
ƋƵŝƉŵĞŶƚͲ'ŽůĚĞŶ'ĂƚĞ;ŽďĐĂƚdžĐĂǀĂƚŽƌͿ
DĂƚĞƌŝĂůƐ;'ŽůĚĞŶ'ĂƚĞͿ;tŝƌĞͿ >^
DĂƚĞƌŝĂůƐ;'ŽůĚĞŶ'ĂƚĞͿ;DŝƐĐ͘&ŝƚƚŝŶŐƐͿ >^
>h>ddKd>͗
3rd St Fiber - Estimated Change Order Cost
CO #58, Page 5 of 13
! "
ŘĺĤôèťώIJÍıôϡ
@ώbŪıæôŘϡ
"Íťôϡ
ŪæϱèĺIJťŘÍèťĺŘώIJÍıô
@ĺīîôIJώ@Íťôώ(īôèťŘĖè >ĖæôŘώiŕťĖèώĖƏĖIJČ ͓ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͒͗Ϡ͕͕͐ϟ͖͕ щ͘Ϡ͕͔͐ϟ͕͏ щ͕Ϡ͔͗͘Ϡ͕͔͑ϟ͕͏ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏
ēÍIJČôώťĺώèēôîŪīôώ͗͏͔ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͖͓͐Ϡ͐͒͘ϟ͗͘ щ͓͐͗Ϡ͓͐͐ϟ͐͏ щ͖Ϡ͓͐͒Ϡ͏͕͒ϟ͖͏ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏
ŘĺèŪŘôώVώaÍťôŘĖÍīŜ ͖ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͘͘Ϡ͏͘͏ϟ͏͏ щ͓͔Ϡ͏͏͏ϟ͏͏ щ͖Ϡ͖͐͘Ϡ͏͕͒ϟ͖͏ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏
iŽôŘēôÍîώîîôîώ"ÍƅŜώċĺŘώVώaÍťôŘĖÍīώ"ôīĖŽôŘƅ ͗ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͑͒͐Ϡ͓͔͓ϟ͓͑ щ͖͑Ϡ͏͏͏ϟ͏͏ щ͖Ϡ͑͏͕Ϡ͏͕͒ϟ͖͏ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏
«ĖèťĺŘĖÍώèēώ͗͏ώĺIJîŪĖť ͘ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͐͏͒Ϡ͔͗͒ϟ͓͐ щ͑͑Ϡ͓͏͕ϟ͓͏ щ͖Ϡ͑͑͗Ϡ͓͓͒ϟ͐͏ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏
ôıĺŽÍīώĺċώŘĖŽÍťôώ[ŪıĖÍIJĖŘôŜώЭώŪŜĖIJôŜŜώĖČIJώĖIJώ
i®͓͐ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͕͑Ϡ͏͏͏ϟ͏͏ щ͐͒Ϡ͏͏͏ϟ͏͏ щ͖Ϡ͓͑͐Ϡ͓͓͒ϟ͐͏ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏
aώċĺŘώ>ĺŪIJîÍťĖĺIJŜ ͕͐ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͒͗Ϡ͔͑͑ϟ͏͏ щ͑͘Ϡ͔͗͐ϟ͏͏ щ͖Ϡ͖͑͐Ϡ͏͓͑ϟ͐͏ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏
ôŜĺīŪťĖĺIJώĺċώĺIJċīĖèťŜώċĺŘώĖČIJÍīώЭώIīīŪıĖIJÍťĖĺIJ ͖͐ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͔͏Ϡ͏͏͏ϟ͏͏ щ͔͑Ϡ͏͏͏ϟ͏͏ щ͖Ϡ͕͑͘Ϡ͏͓͑ϟ͐͏ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏
(īôèťŘĖèÍīώôŘŽĖèôώĺIJIJôèťĖĺIJŜ ͑͐ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͔͐͘Ϡ͏͏͏ϟ͏͏ щ͓͐͒Ϡ͐͒͘ϟ͖͐ щ͖Ϡ͓͒͘Ϡ͖͒͘ϟ͗͐ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏
Vώ"ôſÍťôŘĖIJČώÍIJîώťĖīĖťƅώĺIJċīĖèťŜώIıŕÍèťŜ ͑͑ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͓͕͐Ϡ͓͗͘ϟ͖͑ щ͐͒͏Ϡ͔͒͘ϟ͖͑ щ͖Ϡ͔͖͏Ϡ͔͒͐ϟ͔͒ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏
îîĖťĖĺIJÍīώ(īôèťŘĖèÍīώĺIJIJôèťĖĺIJ ͕͑ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͒Ϡ͗͏͏ϟ͏͏ щ͒Ϡ͒͑͘ϟ͕͗ щ͖Ϡ͔͖͒Ϡ͓͑͘ϟ͒͘ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏
͓͒ϱ͐͗͘IIJŜťÍīīώĺŘŘŪČÍťôîώaôťÍīώĖŕôώÍťώĖČIJÍīώĺīôώ
>ĺŪIJîÍťĖĺIJŜϠώ͔ϱċĺĺť ͓͒ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ ͘Ϡ͗͑͗ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͗Ϡ͖͖͔ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͗Ϡ͖͖͔ϟ͏͏щώώώώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ
͓͒ϱ͐͘͘IIJŜťÍīīώĺŘŘŪČÍťôîώaôťÍīώĖŕôώÍťώ[ŪıĖIJÍĖŘôώĺīôώ
>ĺŪIJîÍťĖĺIJŜϠώ͓ϱ>ĺĺť ͓Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͒Ϡ͔͖͔ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͒Ϡ͔͖͔ϟ͏͏щώώώώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ
͓͒ϱ͑͏͏IIJŜťÍīīώĺŘŘŪČÍťôîώaôťÍīώĖŕôώÍťώ[ŪıĖIJÍĖŘôώĺīôώ
>ĺŪIJîÍťĖĺIJŜϠώ͗ϱ>ĺĺť ͐Ϡ͑͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͐Ϡ͏͖͔ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͐Ϡ͏͖͔ϟ͏͏щώώώώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ
͓͒ϱ͑͏͐IIJŜťÍīīώĺŘŘŪČÍťôîώaôťÍīώĖŕôώÍťώ[ŪıĖIJÍĖŘôώĺīôώ
>ĺŪIJîÍťĖĺIJŜϠώ͐͏ϱ>ĺĺť ͖Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͕Ϡ͔͑͏ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͕Ϡ͔͑͏ϟ͏͏щώώώώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ
͒͗ϱ"͖͕ôŜĺīŪťĖĺIJώĺċώťĖīĖťƅώĺIJċīĖèťŜώôťſôôIJώŘĺŕĺŜôîώ
VώÍIJîώ(ƄĖŜťĖIJČώ(ώ«ÍŪīť ͒͗ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ ͐͏Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώ ͑Ϡ͔͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͑Ϡ͔͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ
͒͗ϱ"͖͖ ôŜĺīŪťĖĺIJώĺċώťĖīĖťƅώĺIJċīĖèťŜώ®Ėťēώ[ĖŽôώ(ώ®ĖŘôŜ ώ ͒͏Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώ ͐͏Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώ ͐͏Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ
͓͐ϱ͑͏͕
îîĖťĖĺIJÍīώ®ĺŘħώťĺώôīĺèÍťôώÍIJîώIIJŜťÍīīώ
IIJťôŘèĺIJIJôèťώ«ÍŪīťŜϠώ͔@ϠώIīīŪıĖIJÍťĖĺIJώÍIJîώĖČIJÍīώ
VŪIJèťĖĺIJώĺƄôŜ
͓͐ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ ͕͐͐Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώ ͖͗Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώ ͖͗Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ
͓͑ϱ͑͏͖
îîĖťĖĺIJÍīώ®ĺŘħώťĺώIIJŜťÍīīώĺıæĖIJôîώŘÍċċĖèώĖČIJÍīώ
ĺIJťŘĺīīôŘώÍæĖIJôťϯ(īôèťŘĖèÍīώôŘŽĖèôώÍæĖIJôťώ
>ĺŪIJîÍťĖĺIJώÍťώôŽĖŜôîώ[ĺèÍťĖĺIJ
͓͑ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ ͐͏Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώ ͗Ϡ͔͒͏ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͗Ϡ͔͒͏ϟ͏͏щώώώώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ
ώ͓͒ϱ"͖͗ώ ώIIJŜťÍīīώîîĖťĖĺIJÍīώ(ώŪīīώ«ÍŪīťώ ͓͒ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ ώщώώώώώώώώώώώώώώώ͕͐Ϡ͏͏͏ϟ͏͏ώ ώщώώώώώώώώώώώώώώώ͐͑Ϡ͖͏͏ϟ͏͏ώ ώщώώώώώώώώώώώώώώώώώώώώ͐͑Ϡ͖͏͏ϟ͏͏ώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ
͓͗ϱ͔͑͐IIJŜťÍīīÍťĖĺIJώĺċώťĺŘıώĖŕôώċŘĺıώϭ͔͒ώťĺώϭ͕͒ώ
ċĺŘώ͑IJîώťώťĺŘıώôîôŜĖČIJ ͓͗ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ ͐͐͐Ϡ͖͓͘ϟ͔͑щώώώώώώώώώώώώ ͐͏Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώ ͐͏Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ
͓͗ϱ͕͑͐
ôıĺŽĖIJČώÍIJîώôĖIJŜťÍīīĖIJČώŘôŽĖĺŪŜīƅώIIJŜťÍīīôîώ
ĖČIJÍīϠώIīīŪıĖIJÍťĖĺIJϠώÍIJîώIIJťôŘèĺIJIJôèťώĺIJîŪĖťŜώ
ťĺώ>ÍèĖīĖťÍťôώťēôώ͑IJîώťώťĺŘıώôîôŜĖČIJ
͐͏Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώ ͐͏Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ
͔͓ϱ͓͑͑(ƄťôIJîôîώIIJťôŘèĺIJIJôèťώĺIJIJôèťĖĺIJώťĺώÍƅīĺŘώ
ĖČIJÍī ͔͓ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ ͔Ϡ͔͒͘ϟ͒͗щώώώώώώώώώώώώώώώώώώ ͔Ϡ͔͒͘ϟ͒͗щώώώώώώώώώώώώώώώώώώ ͖͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ
͔͓ϱ͔͑͑ŘôIJèēĖIJČώÍIJîώIIJŜťÍīīώĺIJîŪĖťώċĺŘώ(ƄťôIJîôîώ
IIJťôŘèĺIJIJôèťώĺIJIJôèťĖĺIJώťĺώÍƅīĺŘώĖČIJÍī ͔͓ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ ͔Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͓Ϡ͔͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͓Ϡ͔͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ
ŘôŽĖĺŪŜώēÍIJČôώiŘîôŘώĺťÍīŜϡ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͐Ϡ͓͓͒Ϡ͖͑͑ϟ͐͐ щ͖͕͗Ϡ͕͑͗ϟ͖͖ щ͖Ϡ͖͒͘Ϡ͓͒͘ϟ͒͘ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏
͔͗ϱ͔͑͒ îîôîώώ͒ŘîώťώĺIJîŪĖťώÍIJîώVŪIJèťĖĺIJώĺƄ ͔͗ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ ͕͐Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώ ͐͒Ϡ͔͏͏ϟ͏͏щώώώώώώώώώώώώώώώ ͐͒Ϡ͔͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ
ŪıŪīÍťĖŽô щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щ͐Ϡ͓͔͏Ϡ͖͑͑ϟ͐͐щ͖͗͑Ϡ͐͑͗ϟ͖͖щ͖Ϡ͖͔͑Ϡ͓͗͘ϟ͕͒͘Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ
ĺťÍīŜ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώ ͐Ϡ͓͔͏Ϡ͖͑͑ϟ͐͐щώώώώώώώ ͖͗͑Ϡ͐͑͗ϟ͖͖щώώώώώώώώώώώ ͖Ϡ͖͔͑Ϡ͓͗͘ϟ͒͘щώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ
ĺŘĖÍ ēÍIJČôώťĺώŕôèĖÍīώŘĺŽĖŜĖĺIJŜώċĺŘώ͗ϱ͏͑ϟ͒ϼ͐͐Ͻώώ
ÍŘħώÍIJîώ®ĺĺîώēĖŕώaŪīèē ͔͖ ͓͏͐Ϡ͔͐͑ϟ͏͘щώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ͓͏͐Ϡ͔͐͑ϟ͏͘щώώώώώώώώώώώώώώ
ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ
ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ
ŪıŪīÍťĖŽô ͓͏͐Ϡ͔͐͑ϟ͏͘щώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ͓͏͐Ϡ͔͐͑ϟ͏͘щώώώώώώώώώώώώώ
ĺťÍīŜ ͓͏͐Ϡ͔͐͑ϟ͏͘щώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ͓͏͐Ϡ͔͐͑ϟ͏͘щώώώώώώώώώώώώώ
͖Ϡ͖͔͑Ϡ͓͗͘ϟ͒͘щώώώώώώώώώ
͓͏͐Ϡ͔͐͑ϟ͏͘щώώώώώώώώώώώώώ
͗Ϡ͔͓͐Ϡ͏͏͐ϟ͓͗щώώώώώώώώώ
͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ
´ŪώFĺIJČώ®ŪϠώŘôŜĖîôIJť "Íťô
@ĺīîôIJώ@Íťôώ(īôèťŘĖèώЭώĺIJŜťŘŪèťĖĺIJϠώ[[
@ĺīîôIJώ@Íťôώ(īôèťŘĖèώЭώĺIJŜťŘŪèťĖĺIJώ[[ώϼГ@ĺīîôIJώ@ÍťôГϽώÍČŘôôŜώſĖťēώťēôώôƄťŘÍώſĺŘħώîôťÍĖīôîώĖIJώťēôώÍæĺŽôώīĖŜťôîώèēÍIJČôώĺŘîôŘŜϟώ>ŪŘťēôŘıĺŘôϠώ@ĺīîôIJώ@ÍťôώēÍŜώIJĺťώŜŪċċôŘôîώîÍıÍČôŜώîŪôώťĺώ
ťēôώÍîîĖťĖĺIJÍīώſĺŘħϟ
ŪŘŘôIJťώĺIJťŘÍèťώiώ"(ώÍŘťĖèĖŕÍťĖĺIJ
ŽÍĖīÍæīôώŪŘŘôIJťώĺIJťŘÍèťώbĺIJϱiώ"(ώÍŘťĖèĖŕÍťĖĺIJ
ŪŘŘôIJťώĺIJťŘÍèťώiώŕīŪŜώIJĺIJϱiώ"(ώÍŘťĖèĖŕÍťĺIJ
ıĺŪIJťώĺċώiώŕīŪŜώIJĺIJϱiώ"(ώÍŘťĖèĖŕÍťĺIJώώŕŕīĖôîώťĺώiώĺııĖťıôIJťώϼıÍƅώæôώèēÍIJČôîώæƅώ®"iϽώ
bĺIJϱiώ"(Ŝ ĖîώIťôıώ
bŪıæôŘ
ώiŘĖČĖIJÍīώĺIJťŘÍèťώ
ÍıĺŪIJťώŜŜĖČIJôîώ
ťĺώIJĺIJϱiώ"(ώ
ώbôťώēÍIJČôώiŘîôŘώ
ıĺŪIJťώŜŜĖČIJôîώťĺώ
IJĺIJϱiώ"(ώ
ÍĖIJĖôŘώŽôϟώĺŘŘĖîĺŘώIıŕŘĺŽôıôIJťŜώϱώēÍŜôώ͓
͐͐ϯ͑͏ϯ͑͏͔͑
ώbôſώIJĺIJϱiώ"(ώ
ťÍťŪŜώæƅώ
ŜŪæèĺIJťŘÍèťĺŘώÍIJîώ
æĖîώĖťôıώ
ώēÍIJČôώiŘîôŘώ
ıĺŪIJťώϼѭϯϱϽώ
"ôŜèŘĖŕťĖĺIJ ēÍIJČôώ
iŘîôŘ
ώiŘĖČĖIJÍīώĺIJťŘÍèťώ
ıĺŪIJťώ
ēÍIJČôώiŘîôŘώ"(ώÍŘťĖèĖŕÍťĖĺIJώŘÍèħĖIJČώϼ[@ώ͕͑ϟ͔͒Ͻ
ώbôſώiώ"(ώ
ÍŘťĖèĖŕÍťĖĺIJώæƅώ
ŪæèĺIJťŘÍèťĺŘώÍIJîώ
ĖîώIťôıώ
ĖîώIťôıώ
bŪıæôŘ
ēÍIJČôώ
iŘîôŘ
ώĺIJťŘÍèťώiώ
ĺııĖťıôIJťώ
ώēÍIJČôώiŘîôŘώ
ıĺŪIJťώϼѭϯϱϽώ
ώbôťώēÍIJČôώiŘîôŘώ
ıĺŪIJťώŜŜĖČIJôîώ
ťĺώiώ"(ώ
"ôŜèŘĖŕťĖĺIJ
ώŪŘŘôIJťώiώ"(ώ
ĺııĖťıôIJťώώϼıÍƅώ
æôώèēÍIJČôîώæƅώ
®"iϽώ
@ϱ͑͑ϱ͕͐͒
iώ"(Ŝ
IJť
12/9/2025
3rd St Fiber - DBE Change Order Table
CO #58, Page 6 of 13
! "
Pivetta Brothers Construction, Inc.
1812 Pease Avenue,
Sumner, Washington 98390
P: (800) 748-3882
Project: 2022-148 Rainier Ave S Phase 4
Renton, Washington
RFI #503: Ex Fiber on S 3rd St
Revision 0 Status Closed on 06/16/25
To Jordan Howe (Perteet)From Russell Owen (Pivetta Brothers Construction, Inc.)
1812 Pease Ave
Sumner, Washington 98390
Date Initiated Apr 14, 2025 Due Date Apr 19, 2025
Location Project Stage
Cost Impact TBD Schedule Impact TBD
Spec Section Cost Code
Drawing Number 200, 208, 212 Reference
Linked Drawings 212
Received From Alan Guthmiller (Golden Gate Electric)
Copies To Bill Adams (Pivetta Brothers Construction, Inc.),
Joey Cooper , Ben Fiscus (Pivetta Brothers
Construction, Inc.), Jordan Howe (Perteet), Matt
June (Pivetta Brothers Construction, Inc.), Chris
McKinnon (Perteet), Joe Nerlfi (City of Renton),
Russell Owen (Pivetta Brothers Construction, Inc.),
William Schroeder (Pivetta Brothers Construction,
Inc.), Anthony Trail (Pivetta Brothers Construction,
Inc.)
Activity
Question Question from Russell Owen Pivetta Brothers Construction, Inc.on Monday, Apr 14, 2025 at 05:40 PM PDT
There is existing city fiber interconnect running E-W in the north curb line of S 3rd St. This fiber shall be intercepted near the
intersection per sheet 212. There is fiber conduit and approximately 4 junction boxes heading east on 3rd St with fiber in
them. These boxes must be removed for roadway widening. Pivetta is unsure if the fiber conduit can remain with the boxes
being removed. A new pathway for fiber may need to be established. Please note the conduit from the intersection to 204+50,
LT has already been installed so adding conduit would require re-digging this trench and adding conduit.
Please provide direction regarding the existing fiber conflict with new roadway and the potential fiber intercept redesign.
Attachments
interconnect in ex boxes on S 3rd St.pdf
Official Response Response from Jordan Howe Perteet on Friday, Jun 13, 2025 at 12:50 PM PDT
As discussed it is acceptable to tie the new fiber and lighting into the one junction box location where it will continue in one
conduit.
Jordan Howe - 6/13/2025
Official Response Response from Jordan Howe Perteet on Monday, Apr 28, 2025 at 12:43 PM PDT
As the existing conduit to the east of the existing box contains box fiber and illumination wiring it is acceptable to perform both
the illumination tie in and the fiber tie in in the same junction box.
Jordan Howe - 4/28/2025
Pivetta Brothers Construction, Inc. Page 1 of 2 Printed On: Nov 19, 2025 03:20 PM EST
3rd St Fiber - RFI 503
CO #58, Page 7 of 13
! "
Official Response Response from Jordan Howe Perteet on Thursday, Apr 17, 2025 at 04:02 PM PDT
As discussed in the weekly construction meeting on 4/17/2025 please install an additional Schedule 80 2" conduit from the
proposed small cable vault at approximately STA 200+80 LT to approximately STA 204+55 LT. Install a new Type 2 junction
box at approximately STA 204+55 LT to access the existing conduit. Pull the existing fiber cable out of the existing conduit and
repull it from the junction box at STA 204+55 LT to the small cable vault at STA 200+80 LT through the new conduit. This work
will be tracked by force account and paid as part of a future change order.
Jordan Howe - 4/17/2025
RFI #503 - Ex Fiber on S 3rd St Project: 2022-148 Rainier Ave S Phase 4
Pivetta Brothers Construction, Inc. Page 2 of 2 Printed On: Nov 19, 2025 03:20 PM EST
3rd St Fiber - RFI 503
CO #58, Page 8 of 13
! "
3r
d
S
t
F
i
b
e
r
-
R
F
I
5
0
3
CO
#
5
8
,
P
a
g
e
9
o
f
1
3
!
"
Fi
e
l
d
D
i
r
e
c
t
i
v
e
#
3
3
-
R
e
m
o
v
a
l
o
f
E
x
i
s
t
i
n
g
P
r
i
v
a
t
e
L
u
m
i
n
a
i
r
e
s
.
p
d
f
RF
I
1
4
0
RF
I
3
5
9
3r
d
S
t
F
i
b
e
r
-
R
F
I
5
0
3
CO
#
5
8
,
P
a
g
e
1
0
o
f
1
3
!
"
RF
I
1
4
0
RF
I
1
4
0
RF
I
3
4
9
RF
I
4
8
6
RF
I
4
8
7
RF
I
4
9
6
RF
I
4
8
7
3r
d
S
t
F
i
b
e
r
-
R
F
I
5
0
3
CO
#
5
8
,
P
a
g
e
1
1
o
f
1
3
!
"
RF
I
2
7
1
RF
I
2
8
4
RF
I
2
8
6
RF
I
3
1
2
RF
I
3
3
6
3r
d
S
t
F
i
b
e
r
-
R
F
I
5
0
3
CO
#
5
8
,
P
a
g
e
1
2
o
f
1
3
!
"
3r
d
S
t
F
i
b
e
r
-
R
F
I
5
0
3
CO
#
5
8
,
P
a
g
e
1
3
o
f
1
3
!
"