HomeMy WebLinkAboutChange Order - 581/15/2026 ! "           # CAG-22-163, CO #58-26 Approved by Cheryl Beyer via email 1/16/2026 Change Order No. 58 Contract Title: Rainier Ave S. Corridor Improvements – Phase 4 Contract No. CAG-22-163 Page 2 of 13 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: This Change adds the installation of a 2-inch Schedule 80 conduit from the proposed small cable vault at approximately STA 200+80 LT to STA 204+55 LT, along with the installation of a new Type 2 junction box at STA 204+55 LT to access where the existing conduit will be intercepted. This Change adds the removal of the existing junction boxes at approx. STA 201+13 LT, 202+20 LT, 202+36 LT, and 204+52 LT. This Change adds the removal of the existing fiber cable from the existing conduit and repulling it from the new junction box at approx. 204+55 LT to the small cable vault through the newly installed conduit. Proposal Schedule of Prices: ADD the following to Schedule A: 58-A235 – Added Conduit and Junction Box to Maintain Existing Interconnect on S 3rd St, 1 EST @ $16,000.00 = $16,000.00 Specification and/or Special Provision: No change. Description: The Contractor shall install a 2-inch Schedule 80 conduit from the proposed small cable vault at approximately STA 200+80 LT to approximately STA 204+55 LT. The Contractor shall install a new Type 2 junction box at approximately STA 204+55 LT to access and intercept the existing conduit. The Contractor shall remove the existing junction boxes at approx. STA 201+13 LT, 202+20 LT, 202+36 LT, and 204+52 LT., pull the existing fiber cable out of the existing conduit, and repull it from the junction box at STA 204+55 LT to the small cable vault at STA 200+80 LT through the new conduit as directed in the response to RFI 503. Materials: As specified in Special Provision 8-20. Measurement: ADD the following section 2-03.4: No unit of measurement shall apply to the force account item “Added Conduit and Junction Box to Maintain Existing Interconnect on S 3rd St.” ! "         Change Order No. 58 Contract Title: Rainier Ave S. Corridor Improvements – Phase 4 Contract No. CAG-22-163 Page 3 of 13 Payment: ADD the following section 2-03.5: “Added Conduit and Junction Box to Maintain Existing Interconnect on S 3rd St ,” force account. Plans: As shown in response to RFI 503. Reason for Change: There was existing City fiber interconnect along the north curb line of S 3rd St., including multiple junction boxes containing active fiber that were in conflict with the proposed roadway. To construct the roadway as shown in the plans, the fiber and junction boxes needed to be removed. To maintain system continuity, new conduit and a new junction box needed to be installed. This Change is necessary to establish a new conduit route for interconnect fiber while meeting the requirements of the roadway plans. This Change is required to create an item to compensate the Contractor for the efforts needed to remove the existing junction boxes and install the new conduit and junction box as required by the response to RFI #503. Equitable Adjustment: This Change Order does include an equitable adjustment per Section 1-09.4 of the 2022 WSDOT/APWA Standard Specifications. See attached. Estimated Cost: $16,000.00 Extended Overhead: $ 0.00 Force Account Time Related Damages per 1-09.6.6.d: $ 0.00 Estimated Sales Tax (if applicable): $ 0.00 Total: $16,000.00 58-A235 – Added Conduit and Junction Box to Maintain Existing Interconnect on S 3rd St An independent estimate was prepared for the cost of removing existing junction boxes and installing conduit and a new junction box on S 3rd St. The cost was calculated to be $15,218.16 and has been rounded to an estimated cost of $16,000.00. Extension of Time: The Time for Completion is extended 0 Working Days. ! "         Change Order No. 58 Contract Title: Rainier Ave S. Corridor Improvements – Phase 4 Contract No. CAG-22-163 Page 4 of 13 Affects DBE Work: Yes. Sections 1-04.4 and 1-04.5 of the 2022 WSDOT/APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor because of this change. To be attached to Change Order: ܈ 1-Estimated Change Order Cost ܈ 2-Plans ܈ 3-Field Directive/Request for Information Response ܆ 4-Change Order Quotation ܆ 5-Project Labor List ܆ 6-Force Account Equipment Rate Request (DOT Form 422-010 EF) ܆ 7-Equitable Adjustment Determination ܆ 8-Additional Working Days Calculation ! "         ^dWh>Ͳϭϲϭϱ;ϬϬϱͿ LJ͗ WĞƌƚĞĞƚ ĂƚĞ͗ /ƚĞŵEŽ͘ YƵĂŶƚŝƚLJ hŶŝƚWƌŝĐĞ ƐƚŝŵĂƚĞĚŽƐƚ ϱϴͲϮϯϱ ϯϮ ϭϭϴ͘ϬϬΨ ϯ͕ϳϳϲ͘ϬϬΨ Ϯϴ ϲϱ͘ϬϬΨ ϭ͕ϴϮϬ͘ϬϬΨ ϴ ϲϱ͘ϬϬΨ ϱϮϬ͘ϬϬΨ ϲ͕ϭϭϲ͘ϬϬΨ Ϭ͘ϯϭΨ ϭ͕ϴϵϱ͘ϵϲΨ ϯϮ ϰϲ͘ϬϬΨ ϭ͕ϰϳϮ͘ϬϬΨ Ϯϰ ϱϯ͘ϬϬΨ ϭ͕ϮϳϮ͘ϬϬΨ ϴϴ͘ϬϬΨ ϲϰ͘ϬϬΨ Ϯ͕ϴϬϴ͘ϬϬΨ Ϭ͘ϮϭΨ ϱϴϵ͘ϲϴΨ ϰϬϬ ϰ͘ϬϬΨ ϭ͕ϲϬϬ͘ϬϬΨ ϭ ϭϬϬ͘ϬϬΨ ϭϬϬ͘ϬϬΨ ϭ ϭϬϬ͘ϬϬΨ ϭϬϬ͘ϬϬΨ ϭ͕ϴϬϬ͘ϬϬΨ Ϭ͘ϮϭΨ ϯϳϴ͘ϬϬΨ ϭϯ͕ϱϴϳ͘ϲϰΨ Ϭ͘ϭϮΨ ϭ͕ϲϯϬ͘ϱϮΨ ϭϱ͕Ϯϭϴ͘ϭϲΨ ϭϲ͕ϬϬϬ͘ϬϬΨ ϱϴͲϮϯϱ ϭ Ψϭϲ͕ϬϬϬ͘ϬϬ Ψϭϲ͕ϬϬϬ͘ϬϬ ϭϲ͕ϬϬϬ͘ϬϬΨ ^ƵŵŵĂƌLJŽĨŽŶƚƌĂĐƚŽƌƐYƵŽƚĞƐ͗ /ƚĞŵ YƵŽƚĞ>ŽĐĂƚŝŽŶ Eͬ dŽƚĂůYƵŽƚĞĚĚĚĞĚŽƐƚ͗ ĚĚĞĚŽŶĚƵŝƚĂŶĚ:ƵŶĐƚŝŽŶŽdžƚŽDĂŝŶƚĂŝŶdžŝƐƚŝŶŐ /ŶƚĞƌĐŽŶŶĞĐƚŽŶ^ϯƌĚ^ƚ >ĂďŽƌͲ'ŽůĚĞŶ'ĂƚĞ;ůĞĐƚƌŝĐŝĂŶ&ŽƌĞŵĂŶͿ ,ŽƵƌƐ /ŶĚĞƉĞŶĚĞŶƚŽƐƚƐƚŝŵĂƚĞ /ƚĞŵŚĂŶŐĞ ĞƐĐƌŝƉƚŝŽŶ hŶŝƚ ĞŶƚƐͬŽůůĂƌ DĂƚĞƌŝĂůƐ;'ŽůĚĞŶ'ĂƚĞͿ;ϮΗ^ĐŚ͘ϴϬŽŶĚƵŝƚͿ >& DĂƚĞƌŝĂůƐDĂƌŬƵƉ;'ŽůĚĞŶ'ĂƚĞͿ ĞŶƚƐͬŽůůĂƌ ^ƵďĐŽŶƚƌĂĐƚŽƌDĂƌŬƵƉ͕фΨϮϱ͕ϬϬϬ ĞŶƚƐͬŽůůĂƌ ,ŽƵƌƐ ƋƵŝƉŵĞŶƚDĂƌŬƵƉ;'ŽůĚĞŶ'ĂƚĞͿ ŚĂŶŐĞKƌĚĞƌŽƐƚ;ƋƵŝƚĂďůĞĚũƵƐƚŵĞŶƚͿ ŚĂŶŐĞKƌĚĞƌEŽ͘ϱϴ WƌŽũĞĐƚEĂŵĞ͗ZĂŝŶŝĞƌǀĞ^ŽƌƌŝĚŽƌ/ŵƉƌŽǀĞŵĞŶƚƐͲWŚĂƐĞϰ ŽŶƚƌĂĐƚŽƌ͗WŝǀĞƚƚĂƌŽƚŚĞƌƐŽŶƐƚƌƵĐƚŝŽŶ͕/ŶĐ͘ ŽŶƚƌĂĐƚEŽ͗'ͲϮϮͲϭϲϯ &ĞĚĞƌĂůŝĚEŽ͗^ŚĂŶŶŽŶdƌĞŵƉĞƌ ŽŶƐƚƌƵĐƚŝŽŶDĂŶĂŐĞƌ͗ϭϮͬϭͬϮϬϮϱ ĚĚĞĚŽŶĚƵŝƚĂŶĚ:ƵŶĐƚŝŽŶŽdžƚŽDĂŝŶƚĂŝŶdžŝƐƚŝŶŐ /ŶƚĞƌĐŽŶŶĞĐƚŽŶ^ϯƌĚ^ƚ ^d dKd>,E'KZZK^d YƵŽƚĞĚŽƐƚ Eͬ >ĂďŽƌͲ'ŽůĚĞŶ'ĂƚĞ;ƉƉƌĞŶƚŝĐĞůĞĐƚƌŝĐŝĂŶͿ ,ŽƵƌƐ >ĂďŽƌͲ'ŽůĚĞŶ'ĂƚĞ;ƉƉƌĞŶƚŝĐĞůĞĐƚƌŝĐŝĂŶͿ ,ŽƵƌƐ >ĂďŽƌDĂƌŬƵƉ;'ŽůĚĞŶ'ĂƚĞͿ ĞŶƚƐͬŽůůĂƌ ^d/DddKd>͗ ƋƵŝƉŵĞŶƚͲ'ŽůĚĞŶ'ĂƚĞ;WŝĐŬƵƉdƌƵĐŬͿ ,ŽƵƌƐ ƋƵŝƉŵĞŶƚͲ'ŽůĚĞŶ'ĂƚĞ;ƵŵƉdƌĂŝůĞƌͿ ,ŽƵƌƐ ƋƵŝƉŵĞŶƚͲ'ŽůĚĞŶ'ĂƚĞ;ŽďĐĂƚdžĐĂǀĂƚŽƌͿ DĂƚĞƌŝĂůƐ;'ŽůĚĞŶ'ĂƚĞͿ;tŝƌĞͿ >^ DĂƚĞƌŝĂůƐ;'ŽůĚĞŶ'ĂƚĞͿ;DŝƐĐ͘&ŝƚƚŝŶŐƐͿ >^ >h>ddKd>͗ 3rd St Fiber - Estimated Change Order Cost CO #58, Page 5 of 13 ! "         „ŘĺĤôèťώIJÍıôϡ @ώbŪıæôŘϡ "Íťôϡ ‹ŪæϱèĺIJťŘÍèťĺŘώIJÍıô @ĺīîôIJώ@Íťôώ(īôèťŘĖè >ĖæôŘώiŕťĖèώ‹ĖƏĖIJČ ͓ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͒͗Ϡ͕͕͐ϟ͖͕ щ͘Ϡ͕͔͐ϟ͕͏ щ͕Ϡ͔͗͘Ϡ͕͔͑ϟ͕͏ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ ēÍIJČôώťĺώ‹èēôîŪīôώ͗͏͔ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͖͓͐Ϡ͐͒͘ϟ͗͘ щ͓͐͗Ϡ͓͐͐ϟ͐͏ щ͖Ϡ͓͐͒Ϡ͏͕͒ϟ͖͏ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ „ŘĺèŪŘôώV˜“ώaÍťôŘĖÍīŜ ͖ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͘͘Ϡ͏͘͏ϟ͏͏ щ͓͔Ϡ͏͏͏ϟ͏͏ щ͖Ϡ͖͐͘Ϡ͏͕͒ϟ͖͏ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ iŽôŘēôÍîώîîôîώ"ÍƅŜώċĺŘώV˜“ώaÍťôŘĖÍīώ"ôīĖŽôŘƅ ͗ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͑͒͐Ϡ͓͔͓ϟ͓͑ щ͖͑Ϡ͏͏͏ϟ͏͏ щ͖Ϡ͑͏͕Ϡ͏͕͒ϟ͖͏ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ «ĖèťĺŘĖÍώ‹èēώ͗͏ώĺIJîŪĖť ͘ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͐͏͒Ϡ͔͗͒ϟ͓͐ щ͑͑Ϡ͓͏͕ϟ͓͏ щ͖Ϡ͑͑͗Ϡ͓͓͒ϟ͐͏ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ ‡ôıĺŽÍīώĺċώ„ŘĖŽÍťôώ[ŪıĖÍIJĖŘôŜώЭώŪŜĖIJôŜŜώ‹ĖČIJώĖIJώ ‡i®͓͐ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͕͑Ϡ͏͏͏ϟ͏͏ щ͐͒Ϡ͏͏͏ϟ͏͏ щ͖Ϡ͓͑͐Ϡ͓͓͒ϟ͐͏ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ a„ώċĺŘώ>ĺŪIJîÍťĖĺIJŜ ͕͐ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͒͗Ϡ͔͑͑ϟ͏͏ щ͑͘Ϡ͔͗͐ϟ͏͏ щ͖Ϡ͖͑͐Ϡ͏͓͑ϟ͐͏ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ ‡ôŜĺīŪťĖĺIJώĺċώĺIJċīĖèťŜώċĺŘώ‹ĖČIJÍīώЭώIīīŪıĖIJÍťĖĺIJ ͖͐ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͔͏Ϡ͏͏͏ϟ͏͏ щ͔͑Ϡ͏͏͏ϟ͏͏ щ͖Ϡ͕͑͘Ϡ͏͓͑ϟ͐͏ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ (īôèťŘĖèÍīώ‹ôŘŽĖèôώĺIJIJôèťĖĺIJŜ ͑͐ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͔͐͘Ϡ͏͏͏ϟ͏͏ щ͓͐͒Ϡ͐͒͘ϟ͖͐ щ͖Ϡ͓͒͘Ϡ͖͒͘ϟ͗͐ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ V˜“ώ"ôſÍťôŘĖIJČώÍIJîώ˜ťĖīĖťƅώĺIJċīĖèťŜώIıŕÍèťŜ ͑͑ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͓͕͐Ϡ͓͗͘ϟ͖͑ щ͐͒͏Ϡ͔͒͘ϟ͖͑ щ͖Ϡ͔͖͏Ϡ͔͒͐ϟ͔͒ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ îîĖťĖĺIJÍīώ(īôèťŘĖèÍīώĺIJIJôèťĖĺIJ ͕͑ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͒Ϡ͗͏͏ϟ͏͏ щ͒Ϡ͒͑͘ϟ͕͗ щ͖Ϡ͔͖͒Ϡ͓͑͘ϟ͒͘ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ ͓͒ϱ͐͗͘IIJŜťÍīīώĺŘŘŪČÍťôîώaôťÍīώ„ĖŕôώÍťώ‹ĖČIJÍīώ„ĺīôώ >ĺŪIJîÍťĖĺIJŜϠώ͔ϱċĺĺť ͓͒ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ ͘Ϡ͗͑͗ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͗Ϡ͖͖͔ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͗Ϡ͖͖͔ϟ͏͏щώώώώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ ͓͒ϱ͐͘͘IIJŜťÍīīώĺŘŘŪČÍťôîώaôťÍīώ„ĖŕôώÍťώ[ŪıĖIJÍĖŘôώ„ĺīôώ >ĺŪIJîÍťĖĺIJŜϠώ͓ϱ>ĺĺť ͓Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͒Ϡ͔͖͔ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͒Ϡ͔͖͔ϟ͏͏щώώώώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ ͓͒ϱ͑͏͏IIJŜťÍīīώĺŘŘŪČÍťôîώaôťÍīώ„ĖŕôώÍťώ[ŪıĖIJÍĖŘôώ„ĺīôώ >ĺŪIJîÍťĖĺIJŜϠώ͗ϱ>ĺĺť ͐Ϡ͑͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͐Ϡ͏͖͔ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͐Ϡ͏͖͔ϟ͏͏щώώώώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ ͓͒ϱ͑͏͐IIJŜťÍīīώĺŘŘŪČÍťôîώaôťÍīώ„ĖŕôώÍťώ[ŪıĖIJÍĖŘôώ„ĺīôώ >ĺŪIJîÍťĖĺIJŜϠώ͐͏ϱ>ĺĺť ͖Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͕Ϡ͔͑͏ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͕Ϡ͔͑͏ϟ͏͏щώώώώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ ͒͗ϱ"͖͕‡ôŜĺīŪťĖĺIJώĺċώ˜ťĖīĖťƅώĺIJċīĖèťŜώôťſôôIJώ„ŘĺŕĺŜôîώ V˜“ώÍIJîώ(ƄĖŜťĖIJČώ„‹(ώ«ÍŪīť ͒͗ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ ͐͏Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώ ͑Ϡ͔͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͑Ϡ͔͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ ͒͗ϱ"͖͖ ‡ôŜĺīŪťĖĺIJώĺċώ˜ťĖīĖťƅώĺIJċīĖèťŜώ®Ėťēώ[ĖŽôώ„‹(ώ®ĖŘôŜ ώ ͒͏Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώ ͐͏Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώ ͐͏Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ ͓͐ϱ͑͏͕ îîĖťĖĺIJÍīώ®ĺŘħώťĺώ‡ôīĺèÍťôώÍIJîώIIJŜťÍīīώ IIJťôŘèĺIJIJôèťώ«ÍŪīťŜϠώ͔@ϠώIīīŪıĖIJÍťĖĺIJώÍIJîώ‹ĖČIJÍīώ VŪIJèťĖĺIJώĺƄôŜ ͓͐ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ ͕͐͐Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώ ͖͗Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώ ͖͗Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ ͓͑ϱ͑͏͖ îîĖťĖĺIJÍīώ®ĺŘħώťĺώIIJŜťÍīīώĺıæĖIJôîώ“ŘÍċċĖèώ‹ĖČIJÍīώ ĺIJťŘĺīīôŘώÍæĖIJôťϯ(īôèťŘĖèÍīώ‹ôŘŽĖèôώÍæĖIJôťώ >ĺŪIJîÍťĖĺIJώÍťώ‡ôŽĖŜôîώ[ĺèÍťĖĺIJ ͓͑ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ ͐͏Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώ ͗Ϡ͔͒͏ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͗Ϡ͔͒͏ϟ͏͏щώώώώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ ώ͓͒ϱ"͖͗ώ ώIIJŜťÍīīώîîĖťĖĺIJÍīώ„‹(ώ„Ūīīώ«ÍŪīťώ ͓͒ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ ώщώώώώώώώώώώώώώώώ͕͐Ϡ͏͏͏ϟ͏͏ώ ώщώώώώώώώώώώώώώώώ͐͑Ϡ͖͏͏ϟ͏͏ώ ώщώώώώώώώώώώώώώώώώώώώώ͐͑Ϡ͖͏͏ϟ͏͏ώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ ͓͗ϱ͔͑͐IIJŜťÍīīÍťĖĺIJώĺċώ‹ťĺŘıώ„ĖŕôώċŘĺıώϭ͔͒ώťĺώϭ͕͒ώ ċĺŘώ͑IJîώ‹ťώ‹ťĺŘıώ‡ôîôŜĖČIJ ͓͗ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ ͐͐͐Ϡ͖͓͘ϟ͔͑щώώώώώώώώώώώώ ͐͏Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώ ͐͏Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ ͓͗ϱ͕͑͐ ‡ôıĺŽĖIJČώÍIJîώ‡ôĖIJŜťÍīīĖIJČώ„ŘôŽĖĺŪŜīƅώIIJŜťÍīīôîώ ‹ĖČIJÍīϠώIīīŪıĖIJÍťĖĺIJϠώÍIJîώIIJťôŘèĺIJIJôèťώĺIJîŪĖťŜώ ťĺώ>ÍèĖīĖťÍťôώťēôώ͑IJîώ‹ťώ‹ťĺŘıώ‡ôîôŜĖČIJ ͐͏Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώ ͐͏Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ ͔͓ϱ͓͑͑(ƄťôIJîôîώIIJťôŘèĺIJIJôèťώĺIJIJôèťĖĺIJώťĺώ“ÍƅīĺŘώ ‹ĖČIJÍī ͔͓ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ ͔Ϡ͔͒͘ϟ͒͗щώώώώώώώώώώώώώώώώώώ ͔Ϡ͔͒͘ϟ͒͗щώώώώώώώώώώώώώώώώώώ ͖͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ ͔͓ϱ͔͑͑“ŘôIJèēĖIJČώÍIJîώIIJŜťÍīīώĺIJîŪĖťώċĺŘώ(ƄťôIJîôîώ IIJťôŘèĺIJIJôèťώĺIJIJôèťĖĺIJώťĺώ“ÍƅīĺŘώ‹ĖČIJÍī ͔͓ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ ͔Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͓Ϡ͔͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώ ͓Ϡ͔͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ „ŘôŽĖĺŪŜώēÍIJČôώiŘîôŘώ“ĺťÍīŜϡ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ щ͐Ϡ͓͓͒Ϡ͖͑͑ϟ͐͐ щ͖͕͗Ϡ͕͑͗ϟ͖͖ щ͖Ϡ͖͒͘Ϡ͓͒͘ϟ͒͘ щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏ ͔͗ϱ͔͑͒ îîôîώ‹ώ͒Řîώ‹ťώĺIJîŪĖťώÍIJîώVŪIJèťĖĺIJώĺƄ ͔͗ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ ͕͐Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώώώώώώ ͐͒Ϡ͔͏͏ϟ͏͏щώώώώώώώώώώώώώώώ ͐͒Ϡ͔͏͏ϟ͏͏щώώώώώώώώώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώώ ŪıŪīÍťĖŽô щ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щ͐Ϡ͓͔͏Ϡ͖͑͑ϟ͐͐щ͖͗͑Ϡ͐͑͗ϟ͖͖щ͖Ϡ͖͔͑Ϡ͓͗͘ϟ͕͒͘Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ “ĺťÍīŜ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώ ͐Ϡ͓͔͏Ϡ͖͑͑ϟ͐͐щώώώώώώώ ͖͗͑Ϡ͐͑͗ϟ͖͖щώώώώώώώώώώώ ͖Ϡ͖͔͑Ϡ͓͗͘ϟ͒͘щώώώώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ ĺŘĖÍ ēÍIJČôώťĺώ‹ŕôèĖÍīώ„ŘĺŽĖŜĖĺIJŜώċĺŘώ͗ϱ͏͑ϟ͒ϼ͐͐Ͻώώ ÍŘħώÍIJîώ®ĺĺîώēĖŕώaŪīèē ͔͖ ͓͏͐Ϡ͔͐͑ϟ͏͘щώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ͓͏͐Ϡ͔͐͑ϟ͏͘щώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ŪıŪīÍťĖŽô ͓͏͐Ϡ͔͐͑ϟ͏͘щώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ͓͏͐Ϡ͔͐͑ϟ͏͘щώώώώώώώώώώώώώ “ĺťÍīŜ ͓͏͐Ϡ͔͐͑ϟ͏͘щώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ϱщώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώώ ͓͏͐Ϡ͔͐͑ϟ͏͘щώώώώώώώώώώώώώ ͖Ϡ͖͔͑Ϡ͓͗͘ϟ͒͘щώώώώώώώώώ ͓͏͐Ϡ͔͐͑ϟ͏͘щώώώώώώώώώώώώώ ͗Ϡ͔͓͐Ϡ͏͏͐ϟ͓͗щώώώώώώώώώ ͕Ϡ͖͔͘Ϡ͖͓͘ϟ͏͏щώώώώώώώώώ ´ŪώFĺIJČώ®ŪϠώ„ŘôŜĖîôIJť "Íťô @ĺīîôIJώ@Íťôώ(īôèťŘĖèώЭώĺIJŜťŘŪèťĖĺIJϠώ[[ @ĺīîôIJώ@Íťôώ(īôèťŘĖèώЭώĺIJŜťŘŪèťĖĺIJώ[[ώϼГ@ĺīîôIJώ@ÍťôГϽώÍČŘôôŜώſĖťēώťēôώôƄťŘÍώſĺŘħώîôťÍĖīôîώĖIJώťēôώÍæĺŽôώīĖŜťôîώèēÍIJČôώĺŘîôŘŜϟώ>ŪŘťēôŘıĺŘôϠώ@ĺīîôIJώ@ÍťôώēÍŜώIJĺťώŜŪċċôŘôîώîÍıÍČôŜώîŪôώťĺώ ťēôώÍîîĖťĖĺIJÍīώſĺŘħϟ ŪŘŘôIJťώĺIJťŘÍèťώiώ"(ώ„ÍŘťĖèĖŕÍťĖĺIJ ŽÍĖīÍæīôώŪŘŘôIJťώĺIJťŘÍèťώbĺIJϱiώ"(ώ„ÍŘťĖèĖŕÍťĖĺIJ ŪŘŘôIJťώĺIJťŘÍèťώiώŕīŪŜώIJĺIJϱiώ"(ώ„ÍŘťĖèĖŕÍťĺIJ ıĺŪIJťώĺċώiώŕīŪŜώIJĺIJϱiώ"(ώ„ÍŘťĖèĖŕÍťĺIJώώŕŕīĖôîώťĺώiώĺııĖťıôIJťώϼıÍƅώæôώèēÍIJČôîώæƅώ®‹"i“Ͻώ bĺIJϱiώ"(Ŝ ĖîώIťôıώ bŪıæôŘ ώiŘĖČĖIJÍīώĺIJťŘÍèťώ ÍıĺŪIJťώŜŜĖČIJôîώ ťĺώIJĺIJϱiώ"(ώ ώbôťώēÍIJČôώiŘîôŘώ ıĺŪIJťώŜŜĖČIJôîώťĺώ IJĺIJϱiώ"(ώ ‡ÍĖIJĖôŘώŽôϟώĺŘŘĖîĺŘώIıŕŘĺŽôıôIJťŜώϱώ„ēÍŜôώ͓ ͐͐ϯ͑͏ϯ͑͏͔͑ ώbôſώIJĺIJϱiώ"(ώ ‹ťÍťŪŜώæƅώ ŜŪæèĺIJťŘÍèťĺŘώÍIJîώ æĖîώĖťôıώ ώēÍIJČôώiŘîôŘώ ıĺŪIJťώϼѭϯϱϽώ "ôŜèŘĖŕťĖĺIJ ēÍIJČôώ iŘîôŘ ώiŘĖČĖIJÍīώĺIJťŘÍèťώ ıĺŪIJťώ ēÍIJČôώiŘîôŘώ"(ώ„ÍŘťĖèĖŕÍťĖĺIJώ“ŘÍèħĖIJČώϼ[@ώ͕͑ϟ͔͒Ͻ ώbôſώiώ"(ώ „ÍŘťĖèĖŕÍťĖĺIJώæƅώ ‹ŪæèĺIJťŘÍèťĺŘώÍIJîώ ĖîώIťôıώ ĖîώIťôıώ bŪıæôŘ ēÍIJČôώ iŘîôŘ ώĺIJťŘÍèťώiώ ĺııĖťıôIJťώ ώēÍIJČôώiŘîôŘώ ıĺŪIJťώϼѭϯϱϽώ ώbôťώēÍIJČôώiŘîôŘώ ıĺŪIJťώŜŜĖČIJôîώ ťĺώiώ"(ώ "ôŜèŘĖŕťĖĺIJ ώŪŘŘôIJťώiώ"(ώ ĺııĖťıôIJťώώϼıÍƅώ æôώèēÍIJČôîώæƅώ ®‹"i“Ͻώ @ϱ͑͑ϱ͕͐͒ iώ"(Ŝ IJť 12/9/2025 3rd St Fiber - DBE Change Order Table CO #58, Page 6 of 13 ! "         Pivetta Brothers Construction, Inc. 1812 Pease Avenue, Sumner, Washington 98390 P: (800) 748-3882 Project: 2022-148 Rainier Ave S Phase 4 Renton, Washington RFI #503: Ex Fiber on S 3rd St Revision 0 Status Closed on 06/16/25 To Jordan Howe (Perteet)From Russell Owen (Pivetta Brothers Construction, Inc.) 1812 Pease Ave Sumner, Washington 98390 Date Initiated Apr 14, 2025 Due Date Apr 19, 2025 Location Project Stage Cost Impact TBD Schedule Impact TBD Spec Section Cost Code Drawing Number 200, 208, 212 Reference Linked Drawings 212 Received From Alan Guthmiller (Golden Gate Electric) Copies To Bill Adams (Pivetta Brothers Construction, Inc.), Joey Cooper , Ben Fiscus (Pivetta Brothers Construction, Inc.), Jordan Howe (Perteet), Matt June (Pivetta Brothers Construction, Inc.), Chris McKinnon (Perteet), Joe Nerlfi (City of Renton), Russell Owen (Pivetta Brothers Construction, Inc.), William Schroeder (Pivetta Brothers Construction, Inc.), Anthony Trail (Pivetta Brothers Construction, Inc.) Activity Question Question from Russell Owen Pivetta Brothers Construction, Inc.on Monday, Apr 14, 2025 at 05:40 PM PDT There is existing city fiber interconnect running E-W in the north curb line of S 3rd St. This fiber shall be intercepted near the intersection per sheet 212. There is fiber conduit and approximately 4 junction boxes heading east on 3rd St with fiber in them. These boxes must be removed for roadway widening. Pivetta is unsure if the fiber conduit can remain with the boxes being removed. A new pathway for fiber may need to be established. Please note the conduit from the intersection to 204+50, LT has already been installed so adding conduit would require re-digging this trench and adding conduit. Please provide direction regarding the existing fiber conflict with new roadway and the potential fiber intercept redesign. Attachments interconnect in ex boxes on S 3rd St.pdf Official Response Response from Jordan Howe Perteet on Friday, Jun 13, 2025 at 12:50 PM PDT As discussed it is acceptable to tie the new fiber and lighting into the one junction box location where it will continue in one conduit. Jordan Howe - 6/13/2025 Official Response Response from Jordan Howe Perteet on Monday, Apr 28, 2025 at 12:43 PM PDT As the existing conduit to the east of the existing box contains box fiber and illumination wiring it is acceptable to perform both the illumination tie in and the fiber tie in in the same junction box. Jordan Howe - 4/28/2025 Pivetta Brothers Construction, Inc. Page 1 of 2 Printed On: Nov 19, 2025 03:20 PM EST 3rd St Fiber - RFI 503 CO #58, Page 7 of 13 ! "         Official Response Response from Jordan Howe Perteet on Thursday, Apr 17, 2025 at 04:02 PM PDT As discussed in the weekly construction meeting on 4/17/2025 please install an additional Schedule 80 2" conduit from the proposed small cable vault at approximately STA 200+80 LT to approximately STA 204+55 LT. Install a new Type 2 junction box at approximately STA 204+55 LT to access the existing conduit. Pull the existing fiber cable out of the existing conduit and repull it from the junction box at STA 204+55 LT to the small cable vault at STA 200+80 LT through the new conduit. This work will be tracked by force account and paid as part of a future change order. Jordan Howe - 4/17/2025 RFI #503 - Ex Fiber on S 3rd St Project: 2022-148 Rainier Ave S Phase 4 Pivetta Brothers Construction, Inc. Page 2 of 2 Printed On: Nov 19, 2025 03:20 PM EST 3rd St Fiber - RFI 503 CO #58, Page 8 of 13 ! "         3r d S t F i b e r - R F I 5 0 3 CO # 5 8 , P a g e 9 o f 1 3   !       "                                Fi e l d D i r e c t i v e # 3 3 - R e m o v a l o f E x i s t i n g P r i v a t e L u m i n a i r e s . p d f RF I 1 4 0 RF I 3 5 9 3r d S t F i b e r - R F I 5 0 3 CO # 5 8 , P a g e 1 0 o f 1 3   !       "                                RF I 1 4 0 RF I 1 4 0 RF I 3 4 9 RF I 4 8 6 RF I 4 8 7 RF I 4 9 6 RF I 4 8 7 3r d S t F i b e r - R F I 5 0 3 CO # 5 8 , P a g e 1 1 o f 1 3   !       "                                RF I 2 7 1 RF I 2 8 4 RF I 2 8 6 RF I 3 1 2 RF I 3 3 6 3r d S t F i b e r - R F I 5 0 3 CO # 5 8 , P a g e 1 2 o f 1 3   !       "                                3r d S t F i b e r - R F I 5 0 3 CO # 5 8 , P a g e 1 3 o f 1 3   !       "