HomeMy WebLinkAboutR-436303NW 1/4 OF NW 1/4 & THE NE 1/4 OF NW 1/4 SEC 9, TWN 23 N, RGE05E,W.M.
3
U
0
0
0
0
U
N
0
-)
U
U
0
0
CD
U
/
N
a
E
0
3
0
E!
00
00
N
0
0
N
CD
N
0
0
0
0
N
IV
W
W
x
ti
m
E
E
Ln
CD
N
CD
CITY OF RENTON EROSION CONTROL NOTES
CITY OF RENTON WATER PLAN GENERAL NOTES:
cn
ABBREVIATIONS
cfl
(COR STD PLAN 268.00):
(COR
STD PLAN 300.00):
co
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A
15.
THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM
1.
ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE
AD
AREA DRAIN
PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY
OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. INSPECTION AND
CITY OF RENTON PUBLIC WORKS STANDARD SPECIFICATIONS AND SPECIAL PROVISIONS
APPROX
APPROXIMATELY
REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR.
MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY.
AND WSDOT / APWA STANDARD SPECIFICATIONS, LATEST EDITION AS AMENDED BY THE
BC
BOTTOM OF CURB
0
CITY OF RENTON. A SET OF CITY APPROVED PLANS SHALL BE KEPT AT THE JOB SITE
BE
BOTTOM OF EXCAVATION
~
2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT
16.
BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER
WHENEVER CONSTRUCTION IS IN PROGRESS. A PRE -CONSTRUCTION CONFERENCE
BMP
BEST MANAGEMENT PRACTICES
OF ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATER GENERAL PERMIT, IF IT IS
THE CITY STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS
SHALL BE HELD PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR AND OR
BOE
BOTTOM OF EXCAVATION
REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL
DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS
DEVELOPER SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY PERMITS PRIOR TO
BP
BOTTOM OF POND
MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION
THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP.
CONSTRUCTION.
BW
BACK OF WALL
STORMWATER GENERAL PERMIT.
ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS
CB
CATCH BASIN
NECESSARY TO ENSURE FULLY FUNCTIONING CONDITION.
2.
ALL EXISTING UTILITIES SHALL REMAIN IN SERVICE DURING CONSTRUCTION UNLESS
CCR
COORDINATED CIVIL REVIEW
w
3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE
OTHERWISE NOTED. THE CONTRACTOR SHALL CALL 1- 800-424- 5555 TO VERIFY UTILITY
CL
CENTERLINE
2
ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO
17.
AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE
LOCATIONS BEFORE BEGINNING EXCAVATION.
CO
CLEAN OUT
0
POST -PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS.
CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED
COMM
COMMUNICATIONS
=
PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER
3.
ALL MATERIALS USED FOR THE CONSTRUCTION OF WATER SYSTEM IMPROVEMENTS
COR
CITY OF RENTON
Z
4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND
INTO THE DOWNSTREAM SYSTEM.
��
SHALL BE NEW AND UNDAMAGED, AND CATALOG CUTS FOR ALL MATERIALS SHALL BE
DI
DUCTILE IRON
AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE
APPROVED IN WRITING BY THE CITY OF RENTON PRIOR TO BRINGING ANY MATERIALS ON-
DOE
DEPARTMENT OF ECOLOGY
O
PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN
18.
ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING
SITE.
DOM
DOMESTIC
ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN
BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHALL PROVIDE
DR
DOOR
Q
MANUAL (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE
ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY
4.
ALL WATER MAIN PIPE MATERIALS SHALL BE CEMENT LINED DUCTILE IRON PIPE,
EL
ELEVATION
Ir
CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE
FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY
THICKNESS CLASS 52 PER AWWA C 151 AND C 104. PIPE JOINTS SHALL BE PUSH -ON OR
ELEC
ELECTRICAL
W
PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC
FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST
MECHANICAL JOINT. CAST IRON OR DUCTILE IRON PIPE FITTINGS SHALL BE CLASS 250 AS
EX/EXIST
EXISTING
I
J
SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY.
PER ANSI/ AWWA C110/ A21. 10- 82. ALL DUCTILE IRON PIPE AND FITTINGS SHALL BE
FD
FRENCH DRAIN
0
WRAPPED WITH 8 -MIL BLACK, TUBE -TYPE, POLYETHYLENE PLASTIC PER AWWA C105
FDC
FIRE DEPARTMENT CONNECTION
5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF
19.
AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR
STANDARDS.
FF
FINISHED FLOOR
CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL
ON -SITE BMPS (AMENDED SOILS, BIORETENTION, PERMEABLE PAVEMENT, ETC.) SHALL BE
FG
FINISHED GRADE
MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE
CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND
5.
MINIMUM COVER FROM TOP OF WATER MAINS TO FINISHED GRADE SHALL BE 36 INCHES
FL
FLOW LINE
REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK -OUT TO
COMPACTION DURING CONSTRUCTION.
FOR PIPE DIAMETER OF 10 -INCH OR LESS AND 48 INCHES FOR PIPE DIAMETER OF 12 -INCH
FS
E
FIRE SERVICE
ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF
AND LARGER. MAXIMUM COVER FOR ALL WATER MAINS SHALL BE 60 INCHES. ANY
FW
FACE WALL
SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL BE CLEANED THOROUGHLY AT THE
20.
PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1 ST), ALL DISTURBED AREAS
DEVIATIONS MUST BE APPROVED BY THE CITY OF RENTON PRIOR TO CONSTRUCTION.
HIP
HIGH POINT
END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO
SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR SEEDED IN
WHERE UTILITY CONFLICTS OCCUR, THE PROFILE OF THE WATER MAIN SHALL BE
INVERT ELEVATION
PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE.
PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED
ADJUSTED AS NECESSARY TO CLEAR CONFLICTS AND TO PROVIDE MINIMUM COVER. PIPE
LID
LANDING
WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. AN EXHIBIT OF THOSE AREAS
DEFLECTION SHALL NOT EXCEED ONE- HALF OF PIPE MANUFACTURER'S SPECIFICATION
LF
LINEAL FEET
6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF -SITE OR IN DESIGNATED
TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE
FOR SIZE OF PIPE USED. ALL TRENCH BACKFILL SHALL BE COMPACTED TO 95 PERCENT
LP
LOW POINT
CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE
SUBMITTED TO THE CITY FOR REVIEW.
MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED PROCTOR TEST METHOD (MDD)
LT
ME
LEFT
MATCH EXISTING
GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON -SITE DUMPING OF EXCESS
IN ROADWAYS, ROADWAY SHOULDERS, ROADWAY PRISM AND DRIVEWAYS, AND 85
MECH
MECHANICAL
CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS.
21.
PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED
PERCENT MDD IN UNPAVED AREAS. ALL PIPE ZONE COMPACTION SHALL BE 95 MDD.
MEP
MECHANICAL ELECTRICAL
TO PREVENT SEDIMENT -LADEN WATER FROM LEAVING THE PROJECT SITE, ALL ESC BMPS
PLUMBING
7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND
SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES, AND
6.
CONCRETE BLOCKING FOR WATER MAINS SHALL BE DESIGNED, INSTALLED AND POURED
MH
MANHOLE
CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO
ON -SITE BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING CONDITION. ALL
IN PLACE IN ACCORDANCE WITH CITY OF RENTON STANDARD DETAILS AND
MMA
METHYL METHACRYLATE
SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL
DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE
SPECIFICATIONS AND SHALL BE INSTALLED AT ALL VERTICAL AND HORIZONTAL BENDS,
MON
MONUMENT
BE MAINTAINED IN A SATISFACTORY CONDITION UNTILSUCH TIME THAT CLEARING AND/OR
PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR
FITTINGS AND BASE OF HYDRANTS. MEGA -LUGS (OR SIMILAR PRODUCT) MAY BE
N0.
NUMBER
NUMBE
CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. ALL
SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY
REQUIRED ON ALL MECHANICAL JOINTS IN ADDITION TO CONCRETE BLOCKING.
NOS
NOT TO SCALE SCALE
NOT
ESC BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS
AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE
PE
ETHELYNE
BEEN STABILIZED TO ENSURE POTENTIAL FOR ON -SITE EROSION DOES NOT EXIST. THE
LANDSCAPED BEFORE OCTOBER 1ST.
7.
ALL NEW WATER MAIN PIPES AND FITTINGS SHALL HAVE A FOAM PIPE PIG RUN THROUGH
PIED
PEDESTRIAN
IMPLEMENTATION, MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC
THEM PRIOR TO BEING FLUSHED, DISINFECTED, AND TESTED. CLEANING, PRESSURE AND
PIV
POST INDICATOR VALVE
BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT.
22.
ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION
PURITY TESTING SHALL BE DONE IN THE PRESENCE OF AND UNDER THE SUPERVISION OF
POC
POINT OF CONNECTION
CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL
A CITY OF RENTON UTILITY INSPECTOR. THE CONTRACTOR SHALL SUPPLY, INSTALL AND
PSE
PUGET SOUND ENERGY
8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO
ROCKERIES IN CITY ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE
REMOVE PLUGS, CORPORATION STOPS, BLOW -OFF ASSEMBLIES, AND THRUST RESTRAINT
R
RADIUS
POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY.
WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS -OF -WAY SHALL BE
/ BLOCKING FOR TESTING AND PURITY ACCEPTANCE. NO CONNECTION SHALL BE MADE
RD
ROOF DRAIN
CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE.
BETWEEN THE NEW MAIN OR BETWEEN THE NEW WET -TAP VALVE TO AN EXISTING MAIN
ROW
RIGHT OF WAY
9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM
UNTIL THE NEW PIPING HAS BEEN FOAM -PIGGED, DISINFECTED, FLUSHED, AND PASSED
RT
RIGHT
REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION
BOTH PRESSURE AND PURITY TESTING.
SD
STORM DRAIN
PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT
SQ
SQUARE FEET
SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE
8.
NEW WATER MAINS INCLUDING SERVICE LATERALS SHALL BE TESTED AT A STATIC
SS
SANITARY SEWER
SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION,
PRESSURE OF 150 PSI ABOVE WORKING PRESSURE WITH A MINIMUM OF 225 PSI TEST
SSS
SANITARY SIDE SEWER
IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE APPLICANT TO ADDRESS ANY
PRESSURE FOR 120 MINUTES WITH A MAXIMUM OF 5 PSI PRESSURE DROP DURING THE
ST
SOUND TRANSIT
NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE
ENTIRE TEST PERIOD. UPON SATISFACTORY COMPLETION OF THE PRESSURE TEST, THE
STA
STATION
ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED,
LINE SHALL BE DISINFECTED, FLUSHED, AND THEN WATER SAMPLES SHALL BE TAKEN FOR
STD
STANDARD
TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE
PURITY TESTING BY THE PUBLIC WORKS INSPECTOR.
STW
STORMWATER
SYSTEM.
TIC
TOP OF CURB
9.
THE CONTRACTOR SHALL NOTIFY THE CITY OF RENTON WATER UTILITY AND
TESC
TEMPORARY EROSION AND
11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER
MAINTENANCE DEPARTMENTS AT LEAST 10 WORKING DAYS PRIOR TO MAKING
SEDIMENTATION CONTROL
FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL.
CONNECTIONS TO THE EXISTING WATER SYSTEM. THE CONTRACTOR SHALL EXPOSE THE
TP
TOP OF POND
EXISTING WATER MAIN AND FITTINGS AT THE CONNECTION POINT BEFORE ORDERING THE
TW
TOP OF WALL
12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE
NECESSARY ADAPTORS AND FITTINGS REQUIRED FOR THE FINAL CONNECTION. THE
TYP
TYPICAL
DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH APRIL
CONTRACTOR SHALL EXCAVATE, REMOVE ALL SURFACE MATERIALS, AND PROVIDE
W
WATER
30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH)
SHORING AND ALL MATERIALS REQUIRED FOR THE CITY OF RENTON TO PERFORM THE
WQ
WATER QUALITY
SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G.,
CONNECTION TO THE EXISTING WATER SYSTEM. THE CONTRACTOR SHALL PROVIDE AND
WSDOT
WASHINGTON STATE DEPARTMENT
SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF
INSTALL BACKFILL, CONCRETE BLOCKING, AND COMPLETE SURFACE RESTORATION.
OF TRANSPORTATION
THE RENTON SWDM.
13. WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN
OCTOBER 1ST AND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY.
14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION,
SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS.
• Call 811
• • two business days
before you dig
2 CIVIL CONSTRUCTION PERMIT - 3RD SUBMITTAL JSF
1 CIVIL CONSTRUCTION PERMIT - 2ND SUBMITTAL JSF
0 CIVIL CONSTRUCTION PERMIT MDR
NO. REVISION BY
SURVEYED:
ZLN
DESIGNED:
MDR
12/8/2025
JSF
08/31/2025
JSF
°RPWN' RAG
D5/27/2024
JSF
CHECKED:
DATE
APPR
APPROVED:
JSF
1601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www_knff.com
12/09/2025
HORIZZOM� HAD 1983%1991 CITY OF
R
RENTON
ONE INCH DATUM •
AT FULL SCALE Planning/Building/Public Works Dept.
IF NOT ONE INCH
SCALE ACCORDINGLY
�>z�c�.1Ec�•x�
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
FWATER UTILITY DEVELOPMENT ENGINEERING
j�Valdez 12/18/2025 HBray 12/31/2025 '
SOLERA TOWNHOMES
2842 NE SUNSET BLVD
RENTON, WA 98056
GENERAL NOTES & ABBREVIATIONS
DATE:
05/30/202
PAGE:
C0.02
IT:OF:
3 55
co
ti
1117-
O
Ln
U
co
M
C)O
O
Liz
M
O
0
4
CN
J