SOIL AMENDMENT NOTES:
1. RETAIN AND PROTECT UNDISTURBED SOIL:
• Leave undisturbed vegetation and soil, and protect from compaction by
fencing and keeping materials storage and equipment off these areas
during construction.
• For all areas where soil or vegetation are disturbed, use option 2, 3, or 4.
PLANTING BEDS
2"-4" ARBORIST
/!%/!/!%/;
GRASS: SEED OR
I
WOOD CHIP MULCH
%��
0'
--------------
SOD
3" OF COMPOST
—
_—_—_ _—_ —
-------------
INCORPORATED INTO
SOIL TO A 8" DEPTH
— — — — — — —
------------ ---
SOIL TO A 8" DEPTH
— — — — — — — —
8'
_____________--
SUBSOIL SCARIFIED 4"
�������������������������
%����������������������
SUBSOIL SCARIFIED 4"
BELOW COMPOST
BELOW COMPOST
AMENDED LAYER (12"
i�x
�������
��i��i�i����%
������
AMENDED LAYER (12"
BELOW SOIL SURFACE)
����
12'
����
BELOW SOIL SURFACE)
Source: City of Seattle (reproduced with permission)
Figure 3.1. Cross—section of Soil Amendment
2. AMEND SOIL:
• Soil amendments shall be applied to all areas which are being set aside as
non —buildable areas (open space or natural resource protection areas) and
are in need of rehabilitation because of past land use disturbances such
as clearing and intrusion of invasive species. the purpose is to enhance
and accelerate the rehabilitation of the soil structure. the application will
be non—destructive to the existing vegetation that is retained by taking
care to taper depths of soil amendment near the surface roots.
• Amend existing site topsoil or subsoil either at default "pre —approved"
rates, or at custom calculated rates to meet the soil quality guidelines
based on engineering tests of the soil and amendment, (Refer to the
Building Soil manual [Stenn et al. 2016] or web site <www.buildingsoil.org>,
for custom calculation methods.)
3. STOCKPILE SOIL:
• Stockpile existing topsoil during grading and replace it prior to planting.
Amend stockpiled topsoil if needed to meet the organic matter or depth
requirements either at the default "pre —approved" rate or at the custom
calculated rate (refer to the Building So# manual [Stenn et al. 2016] or
website <www.buildingsoil.org , for custom calculation method). Scarify
subsoil and mulch planting beds, as described under the Soil Amendment
heading below.
STORM PIPE
CATCH BASIN
STORM MANHOLE
SANITARY SEWER PIPE
SANITARY SEWER MANHOLE
WATER MAINS
FIRE HYDRANT AND FDC
WATER METERS
WATER VALVES
FITTINGS WITH THRUST BLOCKS
SURFACE WTR AND PIPE DIRECTION FLOW
EXISTING CONTOUR LABELS
PROPOSED CONTOUR LABELS
GROUND SPOT ELEVATIONS (TENTHS)
FINISHED SURFACE ELEVATIONS (HUNDREDTHS)
COORDINATES, & LEADERS
0
— w w
W
�457
756.5
+ 756.5
756.55
+ 756.75
N low
4. IMPORT SOIL:
• Import topsoil mix of sufficient organic content and depth to meet the
requirements. Imported soils should contain excessive clay or silt fines
(more than 5 percent passing the US #200 sieve) because that could
restrict stormwater infiltration. Use imported topsoil that meets default
"pre —approved" rates.
• Scarify subsoil and mulch planting beds, as described under the Soil
Amendment heading below.
Note: more than one method may be used on different portions of the same site.
1. SEE PIERCE COUNTY STORMWATER MANAGEMENT
AND SITE DEVELOPMENT MANUAL VOLUME III
CHAPTER 3.1 FOR ADDITIONAL INFORMATION
REGARDING SOIL PRESERVATION AND AMENDMENT
2. RECYCLED CONCRETE AGGREGATE IS NOT ALLOWED
FOR CONSTRUCTION ENTRANCES OR DRIVEWAY
SURFACES.
3. FOR USE OF RECYCLED CONCRETE AGGREGATE FOR
SUBGRADE, PROVIDE SUPPLIER TESTING AND
CERTIFICATION FOR LEAD. TESTING SHALL BE NO
OLDER THAN 90 DAYS FROM THE DATE THE
MATERIAL IS DELIVERED TO THE SITE.
4. INSTALL CONSTRUCTION ENTRANCE AND SILT
FENCE AS DIRECTED BY THE INSPECTOR. SEE
ATTACHED DETAILS.
5. INSTALL SILT FENCE TO PREVENT ACCESS OTHER
THAN THE CONSTRUCTION ENTRANCE.
6. INSTALL POSITIVE DRAINAGE AWAY FROM
STRUCTURE PER ATTACHED DETAIL.
TOP OF WALL/TOE OF WALL
TOP AND TOE OF SLOPES
SLOPE INDICATORS
RIP RAP
FILTER FABRIC FENCING
RAIN WATER LEADERS (RWL)
CLEANOUTS (C.O.) SS, AND RWL
INTERCEPTOR AND BIO—SWALES
CEMENT CONCRETE
STUBBED & PLUGGED LINE
EXTRUDED CONC. CURB
CURB & GUTTER
ASPHALT CONCRETE PAVEMENT
296.E
292.0
0
X X
O
0
311
ad
REVISION
CONSTRUCTION SEQUENCE
1. FLAG CLEARING LIMITS AS SHOWN.
2. INSTALL TEMPORARY QUARRY ROCK CONSTRUCTION ENTRANCE.
3. INSTALL FILTER FENCE. CLEAR AND GRUB SITE. INSTALL
TEMPORARY EROSION CONTROL MEASURES (SILT FENCE) AS
CONSTRUCTION ACTIVITIES PROGRESS. ADDITIONAL FILTER FENCE
MAY BE REQUIRED AROUND THE PERIMETER TO PREVENT SILT
LADEN WATER FROM LEAVING THE SITE.
4. ANY AREA STRIPPED OF VEGETATION, WHERE NO FURTHER WORK
IS ANTICIPATED FOR A PERIOD OF 7 DAYS (2 DAYS DURING WET
SEASON),SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED
EROSION & SEDIMENT CONTROL METHODS, (E.G., SEEDING,
MULCHING. NETTING, EROSION & SEDIMENT CONTROL METHODS.)
5. ROUGH GRADE SITE, CONSTRUCT RESIDENCE AND DRIVEWAY.
6. HYDROSEED AND MULCH AND AMEND ALL EXPOSED AREAS.
7. REMOVE TEMPORARY EROSION CONTROL FACILITIES, ONLY, AFTER
ENTIRE SITE IS STABILIZED AND THE POTENTIAL FOR EROSION
HAS PASSED.
8. CLEAN ANY SILT THAT HAS ACCUMULATED IN THE PERMANENT
STORM DRAINAGE SYSTEM.
BENCHMARK AND DATUM
TOPOGRAPHIC INFORMATION IS BASED ON FIELD SURVEY INFORMATION
PROVIDED BY DEVELOPMENT ENGINEERING, PLLC AUGUST 27, 2025
USING RTK GPS SURVEY CONNECTED TO WSRN NETWORK, DATUM IS
NAVD 1988. PROPERTY BOUNDARY INFORMATION BASED ON RECORD
OF SURVEY PERFORMED BY CRONES LAND SURVEYING DATED
JANUARY 20, 2023
LEGAL DESCRIPTION
HILLMANS EARLINGTON GARDENS # 1 LESS ST HWY
PLAT BLOCK: 30
PLAT LOT: 3 THRU 11
ALL EXISTING UTILITIES AND EASEMENTS SHOWN ON PLANS ARE TO BE
VERIFIED HORIZONTALLY AND VERTICALLY PRIOR TO ANY
CONSTRUCTION. ALL EXISTING FEATURES INCLUDING BURIED UTILITIES
AND EASEMENTS ARE SHOWN AS INDICATED ON RECORD MAPS AND
SURVEY INFORMATION FURNISHED BY OTHERS. WE ASSUME NO
LIABILITY FOR THE ACCURACY OF THOSE RECORDS AND SURVEY,
FOR THE FINAL LOCATION OF EXISTING UTILITIES IN AREAS CRITICAL
TO CONSTRUCTION CONTACT THE UTILITY OWNER/AGENCY. THE
PROVIDED SITE PLAN DOES NOT REPRESENT A SURVEY, IT IS THE
OWNERS RESPONSIBILITY TO VERIFY ANY AND ALL ENCUMBRANCES
LOCATED ON THE PROPERTY PRIOR TO CONSTRUCTION.
SHEET INDEX
TITLE SHEET & VICINITY MAP ......................................................... C-0
DRAINAGE PLAN............................................................................... C-1
TESC NOTES & DETAILS.................................................................. C-2
GENERAL NOTES & DETAILS........................................................... C-3
SURVEYED:
DESIGNED:
WGC
DROWN:
NBC
CHECKED:
WGC
BY DATE APPR APPROVED:
WGC
SCALE: 1 »=20'
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
VERTICAL: NAVD 19M
HORIZONTAL: NAD 1983/1991
Agt]__)
DATUM
'Q
Airport
6
L VI
Ziy
N 4th St D
NE 4th St Q
>
Z
A > 4'
S LarigG..w� Rrl
JWay
Z
a N 3rd St
a c 3r6
f
_ate S 132nd St
A
2 NE
AuPat VJay 2
NE 2nd
It
r
yy
0�a�
St
s9 gQ sQ
Sw
D
•_r
SRO
S 3rd St '" N � ¢ Pa rF. F
e/L
S O > Q
9Z
p t
�sd l'S 4th 5t
eL
��
r Ceda- River
Natural Zone
a
PROJECT ';
n Gaa�
'th St
�
aaJ
SITE
hp
F,
__
rnon Pa rk
O D ent
r Park
c ^ Grad 41 c
W
N
-: rk
S.,ander Bi•: d
4
1
vd
ik-" ila
th 7t
orillia
v
a
Y j
o
SW 27th St
v
w
SW 34th St
v�
o S P!'4et Dr
S[
In
<
L
m
Q,
` fan}'
114
SE 16Eth St
NE 4'h St
v
Maplmocd
Go f Co u rse
D'1a1)le\COod
SE 164:h St Sp
Fq,rKG� 131"
v
Pa
rhl
L
Renton
SW 4: st St _ � _ .Y
ZJ .n Soos Creek
,E
SW 43rd St SCa<r •� Benson Hill Park and _
"
Trail
V�C� N STY MAP
N
SCALE. • 1 " = 112 MILE
OWNER
BRAUNSTEIN HOLDING GROUP
600 SW 13TH ST 98055
SITE ADDRESS
PARCEL NUMBER: 334040-5035
SITE ADDRESS: 600 SW 13TH ST 98055
CIVIL ENGINEER
DEVELOPMENT ENGINEERING, PLLC
9601 KEY PENINSULA HWY. NW
GIG HARBOR, WA 98329
(253) 228-0513
WWW.DE—CIVIL.COM
?5
R-438901
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING CURRENT PLANNING
HBra 12/19/2025 � AMorganroth
y 12/19/2025
Z
FjfarSurface Water Enginering o LUJ
ah 12/22/2025 DAM, z
0
• CITY OF BRAUNSTEIN PARKING 10/2/25
� RENTON 600 SW 13TH STREET FIELD900K: Q
• COVER SHEET Ir
DRAWING N0:
Planning/Building/Public Works Dept. C-0 m
SHEET: 1 OF. 4
z
w
z
Q
rr
m
SEEDING NOTES
m
00
1. SEEDING MIXTURE SHALL BE GRASS SEED AND SHALL BE APPLIED AT A RATE OF 1 LB PER
CY)
1000SQFT.
1
2. SEED BEDS PLANTED BETWEEN MAY 1 AND OCTOBER 1 WILL REQUIRE IRRIGATION AND OTHER
C)
MAINTENANCE AS NECESSARY TO FOSTER AND PROTECT ROOT STRUCTURE.
0
3. FOR SEED BEDS PLANTED BETWEEN OCTOBER 1 AND APRIL 30, ARMORING OF SEED BEDS
L1J
WILL BE NECESSARY (E.G., GEOTEXTILES, JUTE MAT, CLEAR PLASTIC COVERING).
4. BEFORE SEEDING, INSTALL NEEDED SURFACE RUNOFF CONTROL MEASURES SUCH AS
GRADIENT TERRACES, INTERCEPTOR DIKES, SWALES, LEVEL SPREADERS, AND SEDIMENT
BASINS.
5. THE SEED BEDS SHALL BE FIRM WITH A FAIRLY FINE SURFACE, FOLLOWING SURFACE
ROUGHENING. PERFORM ALL OPERATIONS ACROSS OR AT RIGHT ANGLES TO THE SLOPE.
6. FERTILIZERS ARE TO BE USED ACCORDING TO SUPPLIERS RECOMMENDATIONS. AMOUNTS
z
USED SHOULD BE MINIMIZED, ESPECIALLY ADJACENT TO WATER BODIES AND WETLANDS.
L LI
I-
V i
z
STOCKPILING SOIL NOTES
1. STOCKPILES SHALL BE STABILIZED (WITH PLASTIC COVERING OR OTHER APPROVED DEVICE)
m
DAILY BETWEEN OCTOBER 1 AND APRIL 30.
2. IN ANY SEASON, SEDIMENT LEACHING FROM PILES MUST BE PREVENTED.
3. TOPSOIL SHALL NOT BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION, WHEN THE
SUBGRADE IS EXCESSIVELY WET, OR WHEN CONDITIONS EXIST THAT MAY BE OTHERWISE
DETRIMENTAL TO PROPER GRADING OR PROPOSED SODDING OR SEEDING.
4. PREVIOUSLY ESTABLISHED GRADES ON THE AREAS TO BE TOPSOILED SHALL BE MAINTAINED
ACCORDING TO THE APPROVED PLAN.
T
w
DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
2"x2" 14 GAUGE WIRE, OR
EQUIVALENT, IF STANDARD
STRENGTH FABRIC USED -
2' MIN
FILTER FABRIC
-I� - - - - - - - - - - - -, - -
6' MAX. "I
POST SPACING MAY BE INCREASED 4"x4" MIN. TRENCH
TO 8' IF WIRE BACKING IS USED I I
BACKFILL TRENCH WITH NATIVE SOIL
OR 3/4" TO 1-1/2" WASHED GRAVEL
2"x4" WOOD POSTS, STEEL FENCE POSTS, OR EQUIVALENT (TYP.)
X W INEMIRIM2[1116
1. MULCH MATERIALS USED SHALL BE STRAW AND SHALL BE APPLIED AT A RATE OF 100LBS
PER 1000SQFT.
2. MULCHING SHALL BE APPLIED IN ALL AREAS WITH EXPOSED SLOPES GREATER THAN 2:1.
3. MULCHING SHALL BE USED IMMEDIATELY AFTER SEEDING OR IN AREAS WHICH CANNOT BE
SEEDED BECAUSE OF THE SEASON.
4. ALL AREAS NEEDING MULCH SHALL BE COVERED BY NOVEMBER 1.
1. CONDITIONS OF USE
1.I1. SLT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS.
1.2. SLT FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS, NOR IS IT INTENDED TO TREAT SUBSTANTIAL AMOUNTS OF OVERLAND FLOW. ANY CONCENTRATED
FLOW MUST BE CONVEYED THROUGH THE DRAINAGE SYSTEM TO A SEDIMENT TRAP OR POND.
2. DESIGN AND INSTALLATION SPECIFICATIONS
2.1. THE GEOTEXTILE USED MUST MEET THE STANDARD LISTED BELLOW. A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MUST BE AVAILABLE ON SITE.
AOS (ASTM D4751)
30-100 SIEVE SIZE (0.60-0.15mm) FOR SILT FILM
50-100 SIEVE SIZE (0.30-0.15mm) FOR OTHER FABRICS
WATER PERMITTIVITY (ASTM D4491)
0.02 SEC"' MINIMUM
GRAB TENSILE STRENGTH (ASTM D4632)
180 LBS. MIN. FOR EXTRA STRENGTH FABRIC
100 LBS. MIN. FOR STANDARD STRENGTH FABRIC
GRAB TENSILE ELONGATION (ASTM D4632)
30% MAX. (WOVEN)
ULTRAVIOLET RESISTANCE (ASTM D4355)
70% MIN.
2.2. STANDARD STRENGTH FABRIC REQUIRES WIRE BACKING TO INCREASE THE STRENGTH OF THE FENCE. WIRE BACKING OR CLOSER POST SPACING MAY BE REQUIRED
FOR EXTRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE.
2.3. WHERE THE FENCE IS INSTALLED, THE SLOPE SHALL NOT BE STEEPER THAN 2HAV
2.4. IF A TYPICAL SILT FENCE IS USED, THE STANDARD 4"X4" TRENCH MAY BE REDUCED AS LONG AS THE BOTTOM 8 INCHES OF THE SILT FENCE FABRIC IS WELL BURIED AND
SECURE IN A TRENCH THAT STABILIZES THE FENCE AND DOES NOT ALLOW WATER TO BYPASS OR UNDERMINE THE SILT FENCE.
2.5. FILTER FABRIC FENCES SHALL BE INSTALLED ALONG CONTOURS WHENEVER POSSIBLE.
3. MAINTENANCE STANDARDS
3.1. ANY DAMAGE SHALL BE REPAIRED IMMEDIATELY.
3.2. IF CONCENTRATED FLOWS ARE EVIDENT UPHILL OF THE FENCE, THEY MUST BE INTERCEPTED AND CONVEYED TO A SEDIMENT TRAP OR POND.
3.3. IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING AND ACTING AS A BARRIER TO FLOW AND THEN CAUSING
CHANNELIZATION OF FLOWS PARALLEL TO THE FENCE. IF THIS OCCURS, REPLACE THE FENCE OR REMOVE THE TRAPPED SEDIMENT.
3.4. SEDIMENT MUST BE REMOVED WHEN SEDIMENT IS 6 INCHES HIGH.
3.5. IF THE FILTER FABRIC (GEOTEXTILE) HAS DETERIORATED DUE TO ULTRAVIOLET BREAKDOWN, IT SHALL BE REPLACED.
UNLESS OTHERWISE NOTED, DRAWING IS NOTTO SCALE (NTS)
1DR)STD. PLAN - 214.00
DEPARTMENT PUBLIC WORKS SILT FENCE PR GAZ 9/28/2018 I
Nblk W,,k, Adm ,,t,,ro DATE
:45 AP
DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
INSTALL DRIVEWAY CULVERT
IF THERE IS A ROADSIDE
DITCH PRESENT, AS PER CITY
ROAD STANDARDS
Ey,\Sj\NO PO p,0
4%8" QUARRY SPALLS
f `�iISII��l:IL93�I��9
CONSTRUCTION ENTRANCE NOTES:
1. DRIVEWAYS SHALL BE PAVED TO
THE EDGE OF THE RIGHT-OF-WAY
PRIOR TO INSTALLATION OF THE
CONSTRUCTION ENTRANCE TO
AVOID DAMAGING OF THE
ROADWAY.
2. IT IS RECOMMENDED THAT THE
ENTRANCE BE CROWNED SO THAT
RUNOFF DRAINS OFF THE PAD
15' MIN.
PROVIDE FULL WIDTH OF
INGRESS/EGRESS AREA
NOTES:
1. CONDITION OF USE
1.1. CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER
PAVED AREAS WITHIN 1,000 FEET OF THE SITE.
1.2. FOR RESIDENTIAL CONSTRUCTION PROVIDE STABILIZED CONSTRUCTION ENTRANCES FOR EACH RESIDENCE IN ADDITION TO THE MAIN SUBDIVISION
ENTRANCE. STABILIZED SURFACES SHALL BE OF SUFFICIENT LENGTHIWIDTH TO PROVIDE VEHICLE ACCESS/PARKING, BASED ON LOT SIZE/CONFIGURATION.
2. DESIGN AND INSTALLATION SPECIFICATIONS
2.1. A SEPARATION GEOTEXTILE SHALL BE PLACED UNDER THE SPALLS TO PREVENT FINE SEDIMENT FROM PUMPING UP INTO THE ROCK PAD. THE GEOTEXTILE
SHALL MEET THE FOLLOWING STANDARDS:
GRAB TENSILE STRENGTH (ASTM D4632)
200 LBS. MIN.
GRAB TENSILE ELONGATION (ASTM D4632)
30 % MAX. (WOVEN)
CBR PUNCTURE STRENGTH (ASTM D6241)
495 LBS. MIN.
ADS (ASTM D4751)
20-45 (U.S. STANDARD SIEVE SIZE)
2.2. DO NOT USE CRUSHED CONCRETE, CEMENT, OR CALCIUM CHLORIDE FOR CONSTRUCTION ENTRANCE STABILIZATION BECAUSE THESE PRODUCTS RAISE pH
LEVELS IN STORMWATER AND CONCRETE DISCHARGE TO SURFACE WATERS OF THE STATE IS PROHIBITED.
2.3. HOG FUEL (WOOD BASED MULCH) MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN AREAS THAT WILL NOT BE USED FOR PERMANENT ROADS.
HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILIZATION IN URBAN AREAS. THE INSPECTOR MAY AT ANY TIME REQUIRE THE USE OF QUARRY SPALLS
IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT.
2.4. FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE.
2.5. WHENEVER POSSIBLE, THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM, COMPACTED SUBGRADE. THIS CAN SUBSTANTIALLY INCREASE THE
EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR MAINTENANCE.
3. MAINTENANCE STANDARDS
3.1. QUARRY SPALLS SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS.
3.2. IF THE ENTRANCE IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF
SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE IN THE DIMENSIONS OF THE ENTRANCE, OR THE INSTALLATION OF A WHEEL
WASH. IF WASHING IS USED, IT SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK, AND WASH WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND.
3.3. ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE
REMOVED OR STABILIZED ON SITE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET, EXCEPT WHEN SWEEPING IS INEFFECTIVE AND
THERE IS A THREAT TO PUBLIC SAFETY. IF IT IS NECESSARY TO WASH THE STREETS, A SMALL SUMP MUST BE CONSTRUCTED. THE SEDIMENT WOULD THEN BE
WASHED INTO THE SUMP WHERE IT CAN BE CONTROLLED AND DISCHARGED APPROPRIATELY. WASH WATER MUST BE PUMPED BACK ONTO THE SITE AND
CANNOT DISCHARGE TO SYSTEMS TRIBUTARY TO SURFACE WATERS.
3.4. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY.
3.5. IF VEHICLES ARE ENTERING OR EXITING THE SITES AT POINTS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL BE INSTALLED TO CONTROL
TRAFFIC.
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
STD. PLAN - 215.10
• PUBLIC WORKSAPPROVED:
DEPARTMENT STABILIZED CONSTRUCTION ENTRANCE GAZ 9/28/2018
P577
ublic Wuds Ad.miAr DATE
REVISION
SURVEYED:
DESIGNED:
WGC
DRAWN:
NBC
CHECKED:
WGC
BY DATE APPR APPROVED:
WGC
1 "=20'
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
:45 AP
VERTICAL: NAVD 19M
HORIZONTAL: NAD 1983/1991
A"')DATUM
DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES:
THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE EROSION AND SEDIMENT CONTROL (ESC) PLAN SET. ALL THE NOTES ON THE
LIST MAY NOT PERTAIN TO EVERY PROJECT. THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLICANT, MAY STRIKE OUT IRRELEVANT NOTES IF NOT
APPLICABLE TO THE PROJECT. HOWEVER, THE APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC
ASPECTS, THEY SHALL BE ADDED AFTER THE ESC STANDARD PLAN NOTES.
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY
REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANTS CONTRACTOR.
2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATER GENERAL
PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY
ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT.
3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION
COMMENCEMENT TO POST -PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS.
4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS
PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY OF
RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE
BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF
CONSTRUCTION.
5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT.
ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT
CLEAN AND TRACK -OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL
BE CLEANED THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING
WATERS OF THE STATE.
6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF -SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE
TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON -SITE DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE
WASHOUT AREAS.
7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF
SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL
SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER
CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON -SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION,
MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT.
8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY.
9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION
PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE
COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE
APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM
REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS,
CHANNELS, OR STORMWATER FACILITIES.
11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL.
12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST
THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED
ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM.
13. WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1ST AND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY.
14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS.
15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT.
INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY.
16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL STORM
DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED
TO A SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING
CONDITION.
17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE
CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM.
18. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHALL
PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE
TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT
FACILITY.
19. AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON -SITE BMPS (AMENDED SOILS, BIORETENTION, PERMEABLE PAVEMENT,
ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND COMPACTION DURING CONSTRUCTION.
20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR
SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON.
AN EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW.
21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT -LADEN WATER FROM LEAVING THE PROJECT SITE,
ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES, AND ON -SITE BMPS SHALL BE RESTORED TO THEIR FULLY
FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM,
DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH
WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST.
22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS
RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF
ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE.
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
STD. PLAN - 268.00
A110PRIPUBLIC WORKS EROSION AND SEDIMENT CONTROL PPS °
DEPARTMENT GAZ 9/28/2018 1
STANDARD PLAN NOTES
Public Woks Adminl-I., DATE
11120125
0 CITY OF
RENTON
Planning/Building/Public Works Dept.
:45 AP
Know what'sbeloW.
Call before you dig.
R-438903
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING "
HBray 12/19/2025
BRAUNSTEIN PARKING
600 SW 13TH STREET
COVER SHEET
z
LU
I-
U)
DATE.
10/2/25
7
D
FlELDBOOK:
PAGE
- J
fLT�
DRAWING NO:
C-2
0°
SHEET: 3 OF. 4
91
Cif
00
C'M
O
Nt
0 PAVED DRIVEWAY OVER FIRM
LLI UNYIELDING SUBGRADE SEE 1 /C1
I-
2%
GRASS FILTER STRIP L=10'. SEED W/
40% TURF TYPE RYE
40% FESCUE
10% WHITE DUTCH CLOVER
1" LIP TO 10% COLONIAL BENTGRASS
GRADE
i=
l-Frl
Uj
EXISTING GRADE
U) 24" WIDE X 6" DEEP,---,
z GRAVEL FLOW SPREADER
Q
m
DRIVEWAY SECTION
T
w
DocuSign Envelope ID: 3B1B34D3-7EOA-476C-ADB3-4329FFEOC108
SURFACE WATER STANDARD PLAN NOTES:
57. (MAX)
2(MIN)
"s<j1
AMMENDED SOIL, 2" OF
COMPOST TILLED TO 6"
DEPTH (MIN)
SCALE : NTS
THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE DRAINAGE PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY
PROJECT. THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLICANT, MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THE
APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE
SURFACE WATER STANDARD PLAN NOTES.
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY
REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR.
2. THE APPLICANT SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY CITY, STATE, AND FEDERAL PERMITS PRIOR TO CONSTRUCTION.
3. ALL STORM DRAINAGE IMPROVEMENTS SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH THE LATEST EDITION OF THE CITY OF RENTON SURFACE
WATER DESIGN MANUAL (RENTON SWDM), RENTON MUNICIPAL CODE (RMC), AND THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL
CONSTRUCTION PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA). IT SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT TO
CORRECT ANY ERROR, OMISSION OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THE PLANS. ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST TO
THE CITY.
4. APPROVAL OF THE ROAD, GRADING, PARKING, BUILDING, AND DRAINAGE PLAN DOES NOT CONSTITUTE AS APPROVAL OF ANY OTHER CONSTRUCTION (E.G. WATER,
SEWER, GAS, ELECTRICAL. ETC.). PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING WALLS REQUIRE A SEPARATE REVIEW AND APPROVAL BY
THE CITY PRIOR TO CONSTRUCTION. THE SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS. ANY DEVIATION
FROM THE APPROVED PLANS WILL REQUIRE COORDINATION FOLLOWED BY WRITTEN APPROVAL FROM THE CITY.
5. A COPY OF THE APPROVED PLANS SHALL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
6. THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN HEREON HAVE BEEN ESTABLISHED BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHALL
THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE APPLICANT AND THE APPLICANT'S
CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT
SHOWN HEREON THAT MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. THE APPLICANT SHALL RECORD ON THE AS -BUILT DRAWINGS ALL
UNDOCUMENTED UTILITIES DISCOVERED AND ANY CHANGES TO THE APPROVED PLANS. THE APPLICANT SHALL IMMEDIATELY NOTIFY THE ENGINEER OF RECORD IF A
CONFLICT EXISTS.
7. VERTICAL DATUM SHALL BE NAVD 88 AND HORIZONTAL DATUM SHALL BE NAD 83 (WA STATE PLANE, NORTH), UNLESS OTHERWISE APPROVED BY THE CITY.
REFERENCE BENCHMARK, DATUM, AND ELEVATIONS SHALL BE NOTED ON THE PLANS.
8. ALL UTILITY TRENCH BACKFILL AND ROADWAY SUBGRADE SHALL BE COMPACTED TO 95 % MAXIMUM DRY DENSITY PER SECTION 2-03.3(14)D - COMPACTION AND
MOISTURE CONTROL TESTS OF THE WSDOT STANDARD SPECIFICATIONS. IN PERMEABLE PAVEMENT AND OTHER INFILTRATION AREAS, ALL TRENCH BACKFILL SHALL
BE FIRM AND UNYIELDING BUT IN NO CASE SHALL BE COMPACTED TO MORE THAN 92% OF MAXIMUM DRY DENSITY.
9. OPEN CUTTING OF EXISTING ROADWAYS FOR STORM DRAINAGE WORK IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY AND NOTED ON THESE
APPROVED PLANS. ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH THE CITY TRENCH RESTORATION STANDARDS.
10. ALL PIPE AND STRUCTURES SHALL BE STAKED FOR SURVEY LINE AND GRADE PRIOR TO THE START OF CONSTRUCTION. WHERE SHOWN ON THE PLANS OR WHERE
DIRECTED BY THE CITY, THE EXISTING MANHOLES, CATCH BASINS, OR INLETS SHALL BE ADJUSTED TO THE GRADE AS STAKED.
11. ALL FLOW CONTROL FACILITIES SHALL BE INSTALLED AND IN OPERATION PRIOR TO, OR IN CONJUNCTION WITH, ANY CONSTRUCTION ACTIVITY UNLESS OTHERWISE
APPROVED BY THE CITY.
12. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH THE CURRENT STATE OF WASHINGTON STANDARD
SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION
MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE
SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING AND BACKFILL SHALL BE AS SHOWN ON THE CITY STANDARD PLAN 220.00, 220.10, AND
220.20.
13. STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT 1, 2, OR 5 INSIDE AND OUTSIDE.
14. ALL DRAINAGE STRUCTURES SUCH AS CATCH BASINS AND MANHOLES SHALL BE FITTED WITH DUCTILE IRON, BOLT -LOCKING LIDS PER THE CITY STANDARD PLAN
204.10, 204.20, 204.30, 204.40, AND 204.50. STRUCTURES SHALL HAVE:
• RECTANGULAR OR ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND OUTSIDE OF THE ROADWAY.
• ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND LOCATED WITHIN THE ROADWAY, BUT OUTSIDE OF THE CURB/GUTTER LINE.
• ROUND, SOLID LIDS DISPLAYING THE CITY LOGO WHEN WITHIN THE PUBLIC RIGHT-OF-WAY OR IN AN EASEMENT TO THE CITY. PRIVATE STRUCTURE LIDS OUTSIDE
PUBLIC RIGHT-OF-WAY AND EASEMENTS TO THE CITY SHALL NOT DISPLAY THE CITY LOGO.
15. BUILDINGS AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WITH TABLE 4.1 EASEMENT WIDTHS AND BUILDING SETBACKS LINES OF THE RENTON SWDM.
16. LIDS OF MANHOLES/CATCH BASINS WITHIN PUBLIC RIGHT-OF-WAY SHALL NOT BE ADJUSTED TO FINAL GRADE UNTIL AFTER PAVING. ALL MANHOLE/CATCH BASIN RIMS
SHALL BE ADJUSTED TO BE FLUSH WITH FINAL FINISHED GRADES, UNLESS OTHERWISE SHOWN.
17. ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY RIGHT-OF-WAY SHALL BE OF SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EDGE OF THE
DRIVEWAY TO THE BOTTOM OF THE DITCH.
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
STD. PLAN - 267,00
PUBLIC WORKS SURFACE WATER STANDARD PLAN E UEflgWribdby:
DEPARTMENT NOTES (1 OF 2) h lartin Pastucha8/13/2020
nn.,,oazmma DATE
1 8:48
NOTE:
GRASS GRASS AREA MAY BE
SUBSTITUTED FOR
UNDISTURBED AREAS.
DocuSign Envelope ID: 3131 B34D3-7EOA-476C-ADB3-4329FFEOC108
SURFACE WATER STANDARD PLAN NOTES:
Q
104
°
a .. 2" CLR.
#4@12" H f =
a
#4@18" V II-III=III=I
III=1 I I=1 11=
1 11=III=III=1
COMPACTED III=1I1=_I' COMPACTED
STRUCTURAL 6 a 11-111=i' o STRUCTURAL
BACKFILL q II II I�' BACKFILL
°a
COMPETENT
NATIVE SOILS
D=1.5HFOR H: 1 )
GENERAL NOTES:
1. DUMMY JOINTS SHALL BE PLACED NOT TO EXCEED 15'-0"oc, THEY
SHALL BE NOT LESS THAN 3/16" IN THICKNESS AND SHALL EXTEND
2" BELOW THE GUTTER LINE.
2. THRU JOINTS - 3/4" THRU JOINTS SHALL BE PLACED AT ALL COLD
JOINTS OR AS DIRECTED BY THE ENGINEER AND SHALL EXTEND
1" BELOW BOTTOM OF CONCRETE.
EXTENDED DEPTH CURB DETAILS
THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE DRAINAGE PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY
PROJECT. THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLICANT, MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THE
APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE
SURFACE WATER STANDARD PLAN NOTES.
18. ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY ROCK PLACED TO A MINIMUM DEPTH OF ONE (1) FOOT
AND SHALL MEET THE FOLLOWING SPECIFICATIONS:
• 4 - 81NCH ROCK / 40 - 70% PASSING;
• 2 - 4 INCH ROCK / 30 - 40% PASSING; AND
• LESS THAN 2 INCH ROCK / 10 - 20 % PASSING.
19. FOOTING DRAINAGE SYSTEMS AND ROOF DOWNSPOUT SYSTEMS SHALL NOT BE INTERCONNECTED AND SHALL SEPARATELY CONVEY COLLECTED FLOWS TO THE
CONVEYANCE SYSTEM OR FLOW CONTROL FACILITY ON THE SITE, UNLESS APPROVED BY THE CITY. FOOTING DRAINS SHALL NOT BE CONNECTED TO ON -SITE BMPS.
20. THE END OF EACH STORM DRAIN STUB SHALL BE CAPPED. A CLEANOUT TOPPED WITH A BOLT -LOCKING LID MARKED "STORM" OR "DRAIN" SHALL BE LOCATED AT THE
PROPERTY LINE OR AT THE POINT OF CONNECTION OF A PRIVATE STORM DRAINAGE CONVEYANCE SYSTEM PER THE CITY STANDARD PLAN 227.00.
21. ALL STORM SYSTEM EXTENSIONS SHALL BE STAKED FOR LINE AND GRADE BY A SURVEYOR LICENSED IN WASHINGTON STATE, AND CUT SHEETS SHALL BE PROVIDED
TO THE CITY PRIOR TO CONSTRUCTION.
22. ALL NEWLY -INSTALLED AND NEWLY -REHABILITATED (PUBLIC AND PRIVATE) STORM CONVEYANCE SYSTEMS SHALL BE INSPECTED BY MEANS OF REMOTE CCTV
ACCORDING TO THE CITY STANDARD PLAN 266.00. CCTV INSPECTIONS AND REPORTS SHALL BE SUBMITTED TO THE CITY PRIOR TO RECEIVING APPROVAL TO INSTALL
PROJECT CURBS, GUTTERS AND/OR PAVEMENT.
23. ALL STORM SYSTEMS AND CONNECTIONS TO EXISTING MAINS SHALL BE TESTED IN ACCORDANCE WITH SECTION 7-04.3(1) OF THE WSDOT STANDARD SPECIFICATIONS
AND IN THE PRESENCE OF A REPRESENTATIVE OF THE CITY. STORM DRAIN STUBS SHALL BE TESTED FOR ACCEPTANCE AT THE SAME TIME THE MAIN STORM IS
TESTED.
24. FOR ALL DISTURBED PERVIOUS AREAS (COMPACTED, GRADED, LANDSCAPED, ETC.) OF THE DEVELOPMENT SITE, TO MAINTAIN THE MOISTURE CAPACITY OF THE SOIL
EITHER STOCKPILE AND REDISTRIBUTE THE EXISTING DUFF LAYER AND NATIVE TOPSOIL OR AMEND THE SOIL WITH COMPOST IN ACCORDANCE WITH STANDARD PLAN
264.00.
25. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY DOES NOT RELIEVE THE APPLICANT OF THE CONTINUING LEGAL OBLIGATION AND/OR LIABILITY
CONNECTED WITH STORMWATER DISPOSAL. THE CITY DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE STORM
SYSTEM PROVIDED DURING CONSTRUCTION.
26. ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER ACTIONS NEEDED TO PROTECT THE LIFE, HEALTH, AND SAFETY OF
THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK SHALL BE PROVIDED. ANY WORK WITHIN THE TRAVELED
RIGHT-OF-WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVED BY THE CITY. ALL SECTIONS OF THE WSDOT
STANDARD SPECIFICATIONS 1-10 TEMPORARY TRAFFIC CONTROL SHALL APPLY.
27. PROJECTS LOCATED WITHIN THE CITY'S AQUIFER PROTECTION AREA (APA) SHALL COMPLY WITH SPECIAL REQUIREMENT #6 OF THE RENTON SWDM AND AQUIFER
PROTECTION REGULATIONS (RMC 4-3-050).
28. PLACEMENT OF SURFACE APPURTENANCES (CATCH BASIN/MANHOLE LIDS, CLEANOUTS, INLETS, ETC.) IN THE STREET TRAVEL LANE WHEEL PATH, INTERSECTIONS OF
STREET TRAVEL LANES, BIKE LANES, SIDEWALKS, AND CROSSWALKS SHALL BE AVOIDED WHENEVER POSSIBLE. ANY SURFACE APPURTENANCE PLACED IN A
SIDEWALK OR CROSSWALK SHALL BE FITTED WITH A NON -SLIP OR NON-SKID LID PER ADA REQUIREMENTS.
29. CLEARLY LABEL PUBLIC AND PRIVATE SYSTEMS ON THE PLANS. PRIVATE SYSTEMS SHALL BE MAINTAINED BY THE APPLICANT.
30. MINIMUM COVER OVER STORM DRAINAGE PIPE SHALL CONFORM TO TABLE 4.2.1.A2 OF THE RENTON SWDM.
31. CONSTRUCTED PERMEABLE PAVEMENT SHALL BE PERMEABLE ENOUGH TO ABSORB WATER AT A MINIMUM RATE OF 20 INCHES PER HOUR IMMEDIATELY AFTER THE
PAVEMENT SURFACE HAS BEEN WETTED CONTINUOUSLY FOR AT LEAST 10 MINUTES. COMPLIANCE WITH THIS MINIMUM RATE SHALL BE CHECKED PRIOR TO
CONSTRUCTION APPROVAL OF THE PAVEMENT. COMPLIANCE MAY BE CHECKED USING A SIMPLE BUCKET TEST IN WHICH 5 GALLONS OF WATER IS POURED ONTO THE
PAVEMENT SURFACE ALL AT ONCE. IF ONLY A MINOR AMOUNT OF WATER PONDS OR RUNS OFF THE SURFACE, THEN THE PAVEMENT IS CONSIDERED TO MEET THE
MINIMUM RATE OF ABSORPTION. AT LEAST ONE TEST SHALL BE CONDUCTED PER 1,000 SQUARE FEET OF PERMEABLE PAVEMENT. IF THIS TEST IS NOT CONCLUSIVE,
THEN ANOTHER TEST PER ASTM C1701 SHALL BE CONDUCTED. FOR LARGE AREAS (E.G., PARKING AREAS), TESTING OBSERVATION MAY BE ACCOMPLISHED WHILE
WALKING BEHIND A SLOWLY MOVING WATER TRUCK DISCHARGING WATER AT A RATE SIMILAR TO THE BUCKET TEST. PERMEABLE PAVERS SHALL BE TESTED USING
ASTM C1781.
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
Aomlbk STD, PLAN - 267.10
URI• PUBLIC WORKS SURFACE WATER STANDARD PLAN jRedby:
DEPARTMENT NOTES (2 OF 2) F Aartin PastuchJ�13/2020
mxrcm Pa:mcna DATE
�®SA3�FA986kAAIgD...
REVISION
SURVEYED:
DESIGNED:
WGC
DRAWN:
NBC
CHECKED:
WGC
BY DATE APPR APPROVED:
WGC
E:M:3
1 "=20'
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
VERTICAL: NAVD 19M
HORIZONTAL NAD 1983/1991
A"')DATUM
?5
0 CITY OF
RENTON
Planning/Building/Public Works Dept.
•
C� °
0 4 .
a
4
171
Q
#4@12" H o
a
#4@18" V
1 /2" CLR.
° °
III=III-III=
COMPACTED o .
11=III=11I-'
STRUCTURAL
II 1=
BACKFILL
II II
0
1 G c d . • d_ . ' 'Q'
J
U d
0i
04
E
PARAMETERS
12" < H s 36"
D= 1'-6"
B = 0.5 (HT.)
COMPACTED
STRUCTURAL
BACKFILL
COMPETENT
NATIVE SOILS
SCALE : NTS
Know what'sbeloW.
Call before you dig.
R-438904
IN COMPLIANCE WITH CITY OF RENTON STANDARDS