Loading...
HomeMy WebLinkAboutC25004509 Meadow Ave Short Plat V1 - 785-202-35110/15/2025 Attendees Joe Stowell (jstowell@rentonwa.gov) Huy Huynh (hhuynh@rentonwa.gov) Ashley Wragge (awragge@rentonwa.gov) ppierson (ppierson@rentonwa.gov) Becca Tjelle (btjelle@rentonwa.gov) cbarnes (cbarnes@rentonwa.gov) mbenoit (mbenoit@rentonwa.gov) Jvaldez (jvaldez@rentonwa.gov) KRevans (krevans@rentonwa.gov) Joe Farah (jfarah@rentonwa.gov) SRary (srary@rentonwa.gov) jgrant (jgrant@rentonwa.gov) cthomas (cthomas@rentonrfa.org) Documents RS_TIR_250826_v1.pdf P_Landscape_Plans_250826_v1.pdf S_Bond_Quantity_Worksheet_250826_v1.pdf L_Draft_Deed_of_Dedication_250826_v2.pdf M_Exempt_Street_Lightning_Calculaton_250826_v1.pdf P_Civil_Plans_250826_v1.pdf A_Civil_Construction_Permit_Application_250826_v1.pdf Record Message Date Time Document Page Number 1 Huy Huynh: Joined Session 9/10/2025 3:02 PM 2 Huy Huynh: Added 'A_Civil_Construction_Permit_Application_250826_v1.pdf' 9/10/2025 3:03 PM A_Civil_Construction_ Permit_Application_2 50826_v1.pdf 3 Huy Huynh: Added 'L_Draft_Deed_of_Dedication_250826_v2.pdf' 9/10/2025 3:03 PM L_Draft_Deed_of_De dication_250826_v2.p df 4 Huy Huynh: Added 'M_Exempt_Street_Lightning_Calculaton_250826_v1.pdf' 9/10/2025 3:03 PM M_Exempt_Street_Lig htning_Calculaton_25 0826_v1.pdf Message Date Time Document Page Number 5 Huy Huynh: Added 'P_Civil_Plans_250826_v1.pdf'9/10/2025 3:08 PM P_Civil_Plans_25082 6_v1.pdf 6 Huy Huynh: Added 'P_Landscape_Plans_250826_v1.pdf'9/10/2025 3:08 PM P_Landscape_Plans_ 250826_v1.pdf 7 Huy Huynh: Added 'RS_TIR_250826_v1.pdf'9/10/2025 3:11 PM RS_TIR_250826_v1.p df 8 Huy Huynh: Added 'S_Bond_Quantity_Worksheet_250826_v1.pdf' 9/10/2025 3:11 PM S_Bond_Quantity_Wo rksheet_250826_v1.p df 9 Huy Huynh: Disconnected 9/10/2025 5:27 PM 10 Huy Huynh: Disconnected 9/10/2025 5:27 PM 11 Huy Huynh: Disconnected 9/10/2025 5:27 PM 12 Huy Huynh: Disconnected 9/10/2025 5:27 PM 13 cthomas: Joined Session 9/15/2025 2:18 PM 14 cthomas: Set status to Reviewing 9/15/2025 2:22 PM 15 cthomas: Set status to Finished 9/15/2025 2:22 PM 16 cthomas: Left Session 9/15/2025 2:22 PM 17 Ashley Wragge: Joined Session 9/22/2025 1:16 PM 18 SRary: Joined Session 9/22/2025 1:30 PM 19 SRary: Set status to Reviewing 9/22/2025 1:30 PM 20 SRary: Added Callout 9/22/2025 1:59 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 21 SRary: Edited Callout (Portion of)9/22/2025 1:59 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 22 SRary: Added Callout 9/22/2025 1:59 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 Message Date Time Document Page Number 23 SRary: Edited Callout (3342700570)9/22/2025 1:59 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 24 SRary: Add Cloud+9/22/2025 1:59 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 25 SRary: Move Callout 9/22/2025 2:00 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 26 SRary: Edit Cloud+9/22/2025 2:00 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 27 SRary: Edited Cloud+ (King County shows THI YEN VAN PHAM and THE CUONG NGUYEN as property owners. if Huy Nguyen is property owner, please provide copy of recorded deed.) 9/22/2025 2:01 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 28 SRary: Edit Cloud+9/22/2025 2:01 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 29 SRary: Move Markups 9/22/2025 2:01 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 30 SRary: Edited Cloud+ (King County shows THI YEN VAN PHAM and THE CUONG NGUYEN as property owners. if Huy Nguyen is property owner, please provide copy of recorded deed. If not, please list both actual property owners) 9/22/2025 2:01 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 31 SRary: Move Markups 9/22/2025 2:01 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 Message Date Time Document Page Number 32 SRary: Add Cloud+9/22/2025 2:01 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 33 SRary: Edited Cloud+ (see comment above)9/22/2025 2:01 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 34 SRary: Move Markups 9/22/2025 2:01 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 35 SRary: Move Cloud+9/22/2025 2:01 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 36 SRary: Move Markups 9/22/2025 2:01 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 37 SRary: Move Callout 9/22/2025 2:01 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 38 SRary: Add Cloud+9/22/2025 2:02 PM L_Draft_Deed_of_De dication_250826_v2.p df 3 39 SRary: Edited Cloud+ (Must have a clear 1" margin on all sides of page. Please ensure text remains at least 8 point font size or larger if resizing for margin) 9/22/2025 2:02 PM L_Draft_Deed_of_De dication_250826_v2.p df 3 40 SRary: Move Markups 9/22/2025 2:02 PM L_Draft_Deed_of_De dication_250826_v2.p df 3 41 SRary: Edit Cloud+9/22/2025 2:03 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 Message Date Time Document Page Number 42 SRary: Move Callout 9/22/2025 2:03 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 43 SRary: Added Text Box 9/22/2025 2:03 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 44 SRary: Edited Text Box (a REAL ESTATE EXCISE TAX AFFIDAVIT is required. Please select template based on date deed of dedication is signed: https://dor.wa.gov/forms-publications/forms-subject/real-estate- excise-tax-forms) 9/22/2025 2:04 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 45 SRary: Edit Cloud+9/22/2025 2:04 PM L_Draft_Deed_of_De dication_250826_v2.p df 1 46 SRary: Add Cloud+9/22/2025 2:05 PM P_Civil_Plans_25082 6_v1.pdf 1 47 SRary: Edited Cloud+ (please label and show monuments on map sheet. Must have ties to 2 City of Renton Monuments.) 9/22/2025 2:06 PM P_Civil_Plans_25082 6_v1.pdf 1 48 SRary: Set status to Finished 9/22/2025 2:08 PM 49 SRary: Left Session 9/22/2025 2:08 PM 50 Ashley Wragge: Left Session 9/22/2025 4:09 PM 51 Ashley Wragge: Joined Session 9/24/2025 10:19 AM 52 Ashley Wragge: Added Cloud 9/24/2025 1:06 PM P_Landscape_Plans_ 250826_v1.pdf 1 53 Ashley Wragge: Added Arrow 9/24/2025 1:06 PM P_Landscape_Plans_ 250826_v1.pdf 1 54 Ashley Wragge: Added Text Box 9/24/2025 1:07 PM P_Landscape_Plans_ 250826_v1.pdf 1 55 Ashley Wragge: Edit Markups 9/24/2025 1:07 PM P_Landscape_Plans_ 250826_v1.pdf 1 Message Date Time Document Page Number 56 Ashley Wragge: Edited Text Box (Reduce conflict between infiltration and the proposed tree. You can move the tree or the infiltration) 9/24/2025 1:09 PM P_Landscape_Plans_ 250826_v1.pdf 1 57 Ashley Wragge: Added Text Box 9/24/2025 2:06 PM P_Civil_Plans_25082 6_v1.pdf 4 58 Ashley Wragge: Edited Text Box 9/24/2025 2:06 PM P_Civil_Plans_25082 6_v1.pdf 4 59 Ashley Wragge: Move Text Box 9/24/2025 2:06 PM P_Civil_Plans_25082 6_v1.pdf 4 60 Ashley Wragge: Add Text Box 9/24/2025 2:06 PM P_Civil_Plans_25082 6_v1.pdf 4 61 Ashley Wragge: Move Markups 9/24/2025 2:06 PM P_Civil_Plans_25082 6_v1.pdf 4 62 Ashley Wragge: Move Text Box 9/24/2025 2:06 PM P_Civil_Plans_25082 6_v1.pdf 4 63 Ashley Wragge: Move Markups 9/24/2025 2:06 PM P_Civil_Plans_25082 6_v1.pdf 4 64 Ashley Wragge: Move Text Box 9/24/2025 2:06 PM P_Civil_Plans_25082 6_v1.pdf 4 65 Ashley Wragge: Move Markups 9/24/2025 2:06 PM P_Civil_Plans_25082 6_v1.pdf 4 66 Ashley Wragge: Move Text Box 9/24/2025 2:07 PM P_Civil_Plans_25082 6_v1.pdf 4 67 Ashley Wragge: Move Markups 9/24/2025 2:07 PM P_Civil_Plans_25082 6_v1.pdf 4 Message Date Time Document Page Number 68 Ashley Wragge: Edited Text Box (The applicant may not install impervious surface material within the area defined by the drip line of any tree to be retained, unless otherwise approved by the City. Utilities Prohibited Within the Drip Line: The applicant may not install utilities within the area defined by the drip line of any tree to be retained, unless otherwise approved by the City.) 9/24/2025 2:07 PM P_Civil_Plans_25082 6_v1.pdf 4 69 Ashley Wragge: Move Markups 9/24/2025 2:07 PM P_Civil_Plans_25082 6_v1.pdf 4 70 Ashley Wragge: Move Markups 9/24/2025 2:07 PM P_Civil_Plans_25082 6_v1.pdf 4 71 Ashley Wragge: Edited Text Box (The applicant may not install impervious surface material within the area defined by the drip line of any tree to be retained, unless otherwise approved by the City. The applicant may not install utilities within the area defined by the drip line of any tree to be retained, unless otherwise approved by the City.) 9/24/2025 2:08 PM P_Civil_Plans_25082 6_v1.pdf 4 72 Ashley Wragge: Edited Text Box (The applicant may not install impervious surface material within the area defined by the drip line of any tree to be retained, unless otherwise approved by the City. The applicant may not install utilities within the area defined by the drip line of any tree to be retained, unless otherwise approved by the City. Additional measures noted in the Arborist Report ) 9/24/2025 2:12 PM P_Civil_Plans_25082 6_v1.pdf 4 73 Ashley Wragge: Move Text Box 9/24/2025 2:12 PM P_Civil_Plans_25082 6_v1.pdf 4 74 Ashley Wragge: Edit Markups 9/24/2025 2:12 PM P_Civil_Plans_25082 6_v1.pdf 4 75 Ashley Wragge: Edited Text Box (Additional measures noted in the Arborist Report) 9/24/2025 2:13 PM P_Civil_Plans_25082 6_v1.pdf 4 Message Date Time Document Page Number 76 Ashley Wragge: Edited Text Box (Additional tree protection measures noted in the Arborist Report need to be shown. In addition, The applicant may not install impervious surface material within the area defined by the drip line of any tree to be retained, unless otherwise approved by the City. The applicant may not install utilities within the area defined by the drip line of any tree to be retained, unless otherwise approved by the City.) 9/24/2025 2:15 PM P_Civil_Plans_25082 6_v1.pdf 4 77 Ashley Wragge: Delete Text Box 9/24/2025 2:16 PM P_Civil_Plans_25082 6_v1.pdf 78 Ashley Wragge: Edited Text Box (Additional tree protection measures noted in the Arborist Report need to be shown. In addition, these protection measures are required per 4-4-130H.10: - The applicant may not install impervious surface material within the area defined by the drip line of any tree to be retained, unless otherwise approved by the City. - The applicant may not install utilities within the area defined by the drip line of any tree to be retained, unless otherwise approved by the City.) 9/24/2025 2:18 PM P_Civil_Plans_25082 6_v1.pdf 4 79 Ashley Wragge: Edited Text Box (Additional tree protection measures noted in the Arborist Report need to be shown. ) 9/24/2025 2:18 PM P_Civil_Plans_25082 6_v1.pdf 4 80 Ashley Wragge: Move Markups 9/24/2025 2:18 PM P_Civil_Plans_25082 6_v1.pdf 4 81 Ashley Wragge: Set status to Finished 9/24/2025 2:18 PM 82 Ashley Wragge: Left Session 9/24/2025 2:19 PM 83 Huy Huynh: Joined Session 9/30/2025 9:30 AM 84 Huy Huynh: Added Text Box 9/30/2025 9:36 AM P_Civil_Plans_25082 6_v1.pdf 1 85 Huy Huynh: Delete Text Box 9/30/2025 9:36 AM P_Civil_Plans_25082 6_v1.pdf 86 Huy Huynh: Added Text Box 9/30/2025 9:36 AM P_Civil_Plans_25082 6_v1.pdf 1 Message Date Time Document Page Number 87 Huy Huynh: Edited Text Box (Please include all landuse condition of approval to second page of plan ) 9/30/2025 9:37 AM P_Civil_Plans_25082 6_v1.pdf 1 88 Huy Huynh: Move Markups 9/30/2025 9:37 AM P_Civil_Plans_25082 6_v1.pdf 1 89 Huy Huynh: Added Text Box 9/30/2025 9:38 AM P_Civil_Plans_25082 6_v1.pdf 2 90 Huy Huynh: Edited Text Box (Add note: All new/existing power and telecommunication lines shall be underground ) 9/30/2025 9:38 AM P_Civil_Plans_25082 6_v1.pdf 2 91 Huy Huynh: Added Callout 9/30/2025 9:42 AM P_Civil_Plans_25082 6_v1.pdf 3 92 Huy Huynh: Edited Callout (Please show construction entrance on plan ) 9/30/2025 9:42 AM P_Civil_Plans_25082 6_v1.pdf 3 93 Huy Huynh: Added Callout 9/30/2025 9:43 AM P_Civil_Plans_25082 6_v1.pdf 3 94 Huy Huynh: Edited Callout (please show silt fence on plan )9/30/2025 9:44 AM P_Civil_Plans_25082 6_v1.pdf 3 95 Huy Huynh: Move Callout 9/30/2025 9:44 AM P_Civil_Plans_25082 6_v1.pdf 3 96 Huy Huynh: Move Callout 9/30/2025 9:44 AM P_Civil_Plans_25082 6_v1.pdf 3 97 Huy Huynh: Added Text Box 9/30/2025 9:47 AM P_Civil_Plans_25082 6_v1.pdf 3 98 Huy Huynh: Edited Text Box (Additional erosion control plan may be required by on-site inspector ) 9/30/2025 9:47 AM P_Civil_Plans_25082 6_v1.pdf 3 99 Huy Huynh: Added Text Box 9/30/2025 9:50 AM P_Civil_Plans_25082 6_v1.pdf 5 Message Date Time Document Page Number 100 Huy Huynh: Edited Text Box (-Please label all CB type, provide IE ) 9/30/2025 9:50 AM P_Civil_Plans_25082 6_v1.pdf 5 101 Huy Huynh: Edited Text Box (-Please label lid type -Please add note: "unless otherwise noted, all storm infrastructure located in the ROW shall be publicly owned and maintained ) 9/30/2025 9:52 AM P_Civil_Plans_25082 6_v1.pdf 5 102 Huy Huynh: Move Markups 9/30/2025 9:52 AM P_Civil_Plans_25082 6_v1.pdf 5 103 Huy Huynh: Move Text Box 9/30/2025 9:52 AM P_Civil_Plans_25082 6_v1.pdf 5 104 Huy Huynh: Edited Text Box (-Please label lid type (tpe) -Please add note: "unless otherwise noted, all storm infrastructure located in the ROW shall be publicly owned and maintained ) 9/30/2025 9:53 AM P_Civil_Plans_25082 6_v1.pdf 5 105 Huy Huynh: Delete Text Box 9/30/2025 9:54 AM P_Civil_Plans_25082 6_v1.pdf 106 Huy Huynh: Added Callout 9/30/2025 9:54 AM P_Civil_Plans_25082 6_v1.pdf 5 107 Huy Huynh: Edited Callout (provide IE, rim (typ.) )9/30/2025 9:54 AM P_Civil_Plans_25082 6_v1.pdf 5 108 Huy Huynh: Add Leader 9/30/2025 9:54 AM P_Civil_Plans_25082 6_v1.pdf 5 109 Huy Huynh: Move Markups 9/30/2025 9:55 AM P_Civil_Plans_25082 6_v1.pdf 5 110 Huy Huynh: Move Callout 9/30/2025 9:55 AM P_Civil_Plans_25082 6_v1.pdf 5 111 Huy Huynh: Paste 9/30/2025 9:55 AM P_Civil_Plans_25082 6_v1.pdf 5 Message Date Time Document Page Number 112 Huy Huynh: Move Callout 9/30/2025 9:55 AM P_Civil_Plans_25082 6_v1.pdf 5 113 Huy Huynh: Move Markups 9/30/2025 9:55 AM P_Civil_Plans_25082 6_v1.pdf 5 114 Huy Huynh: Add Leader 9/30/2025 9:55 AM P_Civil_Plans_25082 6_v1.pdf 5 115 Huy Huynh: Move Callout 9/30/2025 9:55 AM P_Civil_Plans_25082 6_v1.pdf 5 116 Huy Huynh: Add Leader 9/30/2025 9:55 AM P_Civil_Plans_25082 6_v1.pdf 5 117 Huy Huynh: Paste 9/30/2025 9:55 AM P_Civil_Plans_25082 6_v1.pdf 5 118 Huy Huynh: Move Callout 9/30/2025 9:55 AM P_Civil_Plans_25082 6_v1.pdf 5 119 Huy Huynh: Move Markups 9/30/2025 9:55 AM P_Civil_Plans_25082 6_v1.pdf 5 120 Huy Huynh: Edited Callout (provide IE, rim (typ.) and ensure enough cover per 2022 RSWDM) 9/30/2025 9:56 AM P_Civil_Plans_25082 6_v1.pdf 5 121 Huy Huynh: Move Markups 9/30/2025 9:57 AM P_Civil_Plans_25082 6_v1.pdf 5 122 Huy Huynh: Edited Callout (provide IE, rim (typ.) and ensure enough cover per 2022 RSWDM ) 9/30/2025 9:57 AM P_Civil_Plans_25082 6_v1.pdf 5 123 Huy Huynh: Move Markups 9/30/2025 9:57 AM P_Civil_Plans_25082 6_v1.pdf 5 124 Huy Huynh: Edited Callout (provide IE, rim (typ.) and ensure enough cover per 2022 RSWDM ) 9/30/2025 9:57 AM P_Civil_Plans_25082 6_v1.pdf 5 Message Date Time Document Page Number 125 Huy Huynh: Move Markups 9/30/2025 9:57 AM P_Civil_Plans_25082 6_v1.pdf 5 126 Huy Huynh: Added Callout 9/30/2025 10:00 AM P_Civil_Plans_25082 6_v1.pdf 6 127 Huy Huynh: Edited Callout (provide IE to the East )9/30/2025 10:00 AM P_Civil_Plans_25082 6_v1.pdf 6 128 Huy Huynh: Added Line 9/30/2025 10:28 AM P_Civil_Plans_25082 6_v1.pdf 6 129 Huy Huynh: Delete Line 9/30/2025 10:28 AM P_Civil_Plans_25082 6_v1.pdf 130 Huy Huynh: Added Line 9/30/2025 10:30 AM P_Civil_Plans_25082 6_v1.pdf 5 131 Huy Huynh: Added Line 9/30/2025 10:30 AM P_Civil_Plans_25082 6_v1.pdf 5 132 Huy Huynh: Add Length Measurement 9/30/2025 10:31 AM P_Civil_Plans_25082 6_v1.pdf 5 133 Huy Huynh: Edited Length Measurement (15'-0")9/30/2025 10:31 AM P_Civil_Plans_25082 6_v1.pdf 5 134 Huy Huynh: Move Markups 9/30/2025 10:31 AM P_Civil_Plans_25082 6_v1.pdf 5 135 Huy Huynh: Move Line 9/30/2025 10:31 AM P_Civil_Plans_25082 6_v1.pdf 5 136 Huy Huynh: Move Markups 9/30/2025 10:31 AM P_Civil_Plans_25082 6_v1.pdf 5 137 Huy Huynh: Added Polygon 9/30/2025 10:32 AM P_Civil_Plans_25082 6_v1.pdf 5 Message Date Time Document Page Number 138 Huy Huynh: Edit Markups 9/30/2025 10:32 AM P_Civil_Plans_25082 6_v1.pdf 5 139 Huy Huynh: Added Callout 9/30/2025 10:32 AM P_Civil_Plans_25082 6_v1.pdf 5 140 Huy Huynh: Edited Callout (landscape )9/30/2025 10:32 AM P_Civil_Plans_25082 6_v1.pdf 5 141 Huy Huynh: Delete Line 9/30/2025 10:33 AM P_Civil_Plans_25082 6_v1.pdf 142 Huy Huynh: Added Polygon 9/30/2025 10:33 AM P_Civil_Plans_25082 6_v1.pdf 5 143 Huy Huynh: Edit Markups 9/30/2025 10:33 AM P_Civil_Plans_25082 6_v1.pdf 5 144 Huy Huynh: Added Line 9/30/2025 10:33 AM P_Civil_Plans_25082 6_v1.pdf 5 145 Huy Huynh: Added Line 9/30/2025 10:33 AM P_Civil_Plans_25082 6_v1.pdf 5 146 Huy Huynh: Added Line 9/30/2025 10:33 AM P_Civil_Plans_25082 6_v1.pdf 5 147 Huy Huynh: Added Line 9/30/2025 10:33 AM P_Civil_Plans_25082 6_v1.pdf 5 148 Huy Huynh: Move Line 9/30/2025 10:34 AM P_Civil_Plans_25082 6_v1.pdf 5 149 Huy Huynh: Move Markups 9/30/2025 10:34 AM P_Civil_Plans_25082 6_v1.pdf 5 150 Huy Huynh: Added Callout 9/30/2025 10:34 AM P_Civil_Plans_25082 6_v1.pdf 5 Message Date Time Document Page Number 151 Huy Huynh: Edited Callout (relocate meter out of driveway )9/30/2025 10:34 AM P_Civil_Plans_25082 6_v1.pdf 5 152 Huy Huynh: Move Callout 9/30/2025 10:34 AM P_Civil_Plans_25082 6_v1.pdf 5 153 Huy Huynh: Move Markups 9/30/2025 10:34 AM P_Civil_Plans_25082 6_v1.pdf 5 154 Huy Huynh: Move Callout 9/30/2025 10:35 AM P_Civil_Plans_25082 6_v1.pdf 5 155 Huy Huynh: Move Markups 9/30/2025 10:35 AM P_Civil_Plans_25082 6_v1.pdf 5 156 Huy Huynh: Edited Callout (relocate meter out of driveway. label1" service minimum ) 9/30/2025 10:35 AM P_Civil_Plans_25082 6_v1.pdf 5 157 Huy Huynh: Edited Callout (relocate meter out of driveway. label "1" service minimum" ) 9/30/2025 10:35 AM P_Civil_Plans_25082 6_v1.pdf 5 158 Huy Huynh: Move Callout 9/30/2025 10:35 AM P_Civil_Plans_25082 6_v1.pdf 5 159 Huy Huynh: Move Markups 9/30/2025 10:36 AM P_Civil_Plans_25082 6_v1.pdf 5 160 Huy Huynh: Edited Callout (relocate meter out of driveway. label "1" service minimum" (typ)) 9/30/2025 10:36 AM P_Civil_Plans_25082 6_v1.pdf 5 161 Huy Huynh: Added Callout 9/30/2025 10:36 AM P_Civil_Plans_25082 6_v1.pdf 5 162 Huy Huynh: Edited Callout (label - " 1" service minimum")9/30/2025 10:36 AM P_Civil_Plans_25082 6_v1.pdf 5 163 Huy Huynh: Added Text Box 9/30/2025 10:37 AM P_Civil_Plans_25082 6_v1.pdf 9 Message Date Time Document Page Number 164 Huy Huynh: Delete Text Box 9/30/2025 10:37 AM P_Civil_Plans_25082 6_v1.pdf 165 Huy Huynh: Add Cloud+9/30/2025 10:37 AM P_Civil_Plans_25082 6_v1.pdf 9 166 Huy Huynh: Edited Cloud+ (where is this type II? )9/30/2025 10:37 AM P_Civil_Plans_25082 6_v1.pdf 9 167 Huy Huynh: Edited Cloud+ (Please provide clarification. Type II manhole is not shown on plan ) 9/30/2025 10:38 AM P_Civil_Plans_25082 6_v1.pdf 9 168 Huy Huynh: Added Text Box 9/30/2025 10:39 AM P_Civil_Plans_25082 6_v1.pdf 5 169 Huy Huynh: Edited Text Box (Please show cross section of frontage improvement ) 9/30/2025 10:40 AM P_Civil_Plans_25082 6_v1.pdf 5 170 Huy Huynh: Add Cloud+9/30/2025 10:40 AM P_Civil_Plans_25082 6_v1.pdf 5 171 Huy Huynh: Move Markups 9/30/2025 10:40 AM P_Civil_Plans_25082 6_v1.pdf 5 172 Huy Huynh: Edit Cloud+9/30/2025 10:40 AM P_Civil_Plans_25082 6_v1.pdf 5 173 Huy Huynh: Edited Cloud+ (show spot elevation for ADA ramp in a detail to ensure compliance ) 9/30/2025 10:40 AM P_Civil_Plans_25082 6_v1.pdf 5 174 Huy Huynh: Edit Cloud+9/30/2025 10:40 AM P_Civil_Plans_25082 6_v1.pdf 5 175 Huy Huynh: Edited Cloud+ (show spot elevation for ADA ramp in a separate detail to ensure compliance ) 9/30/2025 10:41 AM P_Civil_Plans_25082 6_v1.pdf 5 176 Huy Huynh: Move Markups 9/30/2025 10:41 AM P_Civil_Plans_25082 6_v1.pdf 5 Message Date Time Document Page Number 177 Huy Huynh: Edit Cloud+9/30/2025 10:41 AM P_Civil_Plans_25082 6_v1.pdf 5 178 Huy Huynh: Edited Cloud+ (show spot elevation for ADA ramp in a separate detail to ADA ensure compliance ) 9/30/2025 10:41 AM P_Civil_Plans_25082 6_v1.pdf 5 179 Huy Huynh: Paste 9/30/2025 10:41 AM P_Civil_Plans_25082 6_v1.pdf 5 180 Huy Huynh: Move Cloud+9/30/2025 10:41 AM P_Civil_Plans_25082 6_v1.pdf 5 181 Huy Huynh: Edit Cloud+9/30/2025 10:41 AM P_Civil_Plans_25082 6_v1.pdf 5 182 Huy Huynh: Move Markups 9/30/2025 10:42 AM P_Civil_Plans_25082 6_v1.pdf 5 183 Huy Huynh: Edited Cloud+ (-show spot elevation for ADA ramp in a separate detail to ADA ensure compliance. - Relocate ADA ramp North to align with sidewalk across the street ) 9/30/2025 10:42 AM P_Civil_Plans_25082 6_v1.pdf 5 184 Huy Huynh: Edited Cloud+ (-show spot elevation for ADA ramp in a separate detail to ensure ADA compliance. - Relocate ADA ramp North to align with sidewalk across the street ) 9/30/2025 10:43 AM P_Civil_Plans_25082 6_v1.pdf 5 185 Huy Huynh: Edited Cloud+ (show spot elevation for ADA ramp in a separate detail to ensure ADA compliance ) 9/30/2025 10:43 AM P_Civil_Plans_25082 6_v1.pdf 5 186 Huy Huynh: Move Callout 9/30/2025 10:46 AM P_Civil_Plans_25082 6_v1.pdf 5 187 Huy Huynh: Move Markups 9/30/2025 10:46 AM P_Civil_Plans_25082 6_v1.pdf 5 188 Huy Huynh: Added Callout 9/30/2025 10:46 AM P_Civil_Plans_25082 6_v1.pdf 5 Message Date Time Document Page Number 189 Huy Huynh: Edited Callout (remove existing side sewer service ) 9/30/2025 10:47 AM P_Civil_Plans_25082 6_v1.pdf 5 190 Huy Huynh: Add Length Measurement 9/30/2025 10:51 AM P_Civil_Plans_25082 6_v1.pdf 6 191 Huy Huynh: Added Text Box 9/30/2025 10:53 AM S_Bond_Quantity_Wo rksheet_250826_v1.p df 1 192 Huy Huynh: Edited Text Box (Bond quantity worksheet shall be reviewed at the time of civil construction permit approval. Please make changes according to comments provided on civil construction plan) 9/30/2025 10:54 AM S_Bond_Quantity_Wo rksheet_250826_v1.p df 1 193 Huy Huynh: Added Callout 9/30/2025 10:54 AM P_Landscape_Plans_ 250826_v1.pdf 1 194 Huy Huynh: Edited Callout (relocate street tree to avoid conflict with sewer stub ) 9/30/2025 10:55 AM P_Landscape_Plans_ 250826_v1.pdf 1 195 Huy Huynh: Added Callout 9/30/2025 10:55 AM P_Landscape_Plans_ 250826_v1.pdf 1 196 Huy Huynh: Edited Callout (relocate tree to avoid conflict with sewer stub ) 9/30/2025 10:56 AM P_Landscape_Plans_ 250826_v1.pdf 1 197 Huy Huynh: Edited Callout (relocate tree to avoid conflict with sewer stub ) 9/30/2025 10:56 AM P_Landscape_Plans_ 250826_v1.pdf 1 198 Huy Huynh: Move Callout 9/30/2025 10:56 AM P_Landscape_Plans_ 250826_v1.pdf 1 199 Huy Huynh: Added Callout 9/30/2025 10:57 AM P_Civil_Plans_25082 6_v1.pdf 1 200 Huy Huynh: Edited Callout (Please clarify CB is not shown on survey ) 9/30/2025 10:57 AM P_Civil_Plans_25082 6_v1.pdf 5 Message Date Time Document Page Number 201 Huy Huynh: Add Leader 9/30/2025 10:57 AM P_Civil_Plans_25082 6_v1.pdf 5 202 Huy Huynh: Edited Text Box (Please show cross section of frontage improvement ) 9/30/2025 11:00 AM P_Civil_Plans_25082 6_v1.pdf 5 203 Huy Huynh: Added Callout 9/30/2025 11:03 AM P_Civil_Plans_25082 6_v1.pdf 1 204 Huy Huynh: Edited Callout (add COR std detail for mailbox installation and standards ) 9/30/2025 11:04 AM P_Civil_Plans_25082 6_v1.pdf 5 205 Huy Huynh: Move Markups 9/30/2025 11:04 AM P_Civil_Plans_25082 6_v1.pdf 5 206 Huy Huynh: Added Line 9/30/2025 11:04 AM P_Civil_Plans_25082 6_v1.pdf 1 207 Huy Huynh: Added Line 9/30/2025 11:06 AM P_Civil_Plans_25082 6_v1.pdf 1 208 Huy Huynh: Added Line 9/30/2025 11:06 AM P_Civil_Plans_25082 6_v1.pdf 1 209 Huy Huynh: Add Cloud+9/30/2025 11:09 AM P_Civil_Plans_25082 6_v1.pdf 8 210 Huy Huynh: Delete Cloud+9/30/2025 11:09 AM P_Civil_Plans_25082 6_v1.pdf 211 Huy Huynh: Added Text Box 9/30/2025 11:10 AM P_Civil_Plans_25082 6_v1.pdf 1 212 Huy Huynh: Edited Text Box (include detail 225.20 )9/30/2025 11:10 AM P_Civil_Plans_25082 6_v1.pdf 8 213 Huy Huynh: Edited Text Box 9/30/2025 11:10 AM P_Civil_Plans_25082 6_v1.pdf 8 Message Date Time Document Page Number 214 Huy Huynh: Delete Text Box 9/30/2025 11:10 AM P_Civil_Plans_25082 6_v1.pdf 215 Huy Huynh: Added Callout 9/30/2025 11:18 AM RS_TIR_250826_v1.p df 11 216 Huy Huynh: Edited Callout (please include future build out condition map to TIR ) 9/30/2025 11:18 AM RS_TIR_250826_v1.p df 11 217 Huy Huynh: Edited Callout (please include future build out condition map to TIR for all on-site PGIS ) 9/30/2025 11:19 AM RS_TIR_250826_v1.p df 11 218 Huy Huynh: Move Callout 9/30/2025 11:19 AM RS_TIR_250826_v1.p df 11 219 Huy Huynh: Edited Callout (please include future build out condition map to TIR showing all on-site PGIS ) 9/30/2025 11:19 AM RS_TIR_250826_v1.p df 11 220 Huy Huynh: Added Callout 9/30/2025 11:37 AM P_Civil_Plans_25082 6_v1.pdf 5 221 Huy Huynh: Edited Callout (add note: infiltration trenches shall be protected during home construction ) 9/30/2025 11:38 AM P_Civil_Plans_25082 6_v1.pdf 5 222 Huy Huynh: Added Callout 9/30/2025 1:26 PM RS_TIR_250826_v1.p df 5 223 Huy Huynh: Edited Callout (Please submit )9/30/2025 1:30 PM RS_TIR_250826_v1.p df 5 224 Huy Huynh: Edited Callout (Please submit fully built out condition showing all PGIS calculation ) 9/30/2025 1:31 PM RS_TIR_250826_v1.p df 21 225 Huy Huynh: Added PolyLine 9/30/2025 2:02 PM P_Civil_Plans_25082 6_v1.pdf 5 226 Huy Huynh: Added Callout 9/30/2025 2:03 PM P_Civil_Plans_25082 6_v1.pdf 5 Message Date Time Document Page Number 227 Huy Huynh: Add Leader 9/30/2025 2:03 PM P_Civil_Plans_25082 6_v1.pdf 5 228 Huy Huynh: Move Markups 9/30/2025 2:03 PM P_Civil_Plans_25082 6_v1.pdf 5 229 Huy Huynh: Edited Callout (this portion shall be )9/30/2025 2:03 PM P_Civil_Plans_25082 6_v1.pdf 5 230 Huy Huynh: Move Callout 9/30/2025 2:03 PM P_Civil_Plans_25082 6_v1.pdf 5 231 Huy Huynh: Move Markups 9/30/2025 2:04 PM P_Civil_Plans_25082 6_v1.pdf 5 232 Huy Huynh: Delete Leader 9/30/2025 2:04 PM P_Civil_Plans_25082 6_v1.pdf 5 233 Huy Huynh: Edited Callout (this portion shall be privately maintained ) 9/30/2025 2:04 PM P_Civil_Plans_25082 6_v1.pdf 5 234 Huy Huynh: Move Callout 9/30/2025 2:04 PM P_Civil_Plans_25082 6_v1.pdf 5 235 Huy Huynh: Added Callout 9/30/2025 2:04 PM P_Civil_Plans_25082 6_v1.pdf 5 236 Huy Huynh: Edited Callout (label material composition)9/30/2025 2:05 PM P_Civil_Plans_25082 6_v1.pdf 5 237 Huy Huynh: Delete Callout 9/30/2025 2:16 PM P_Civil_Plans_25082 6_v1.pdf 238 Huy Huynh: Edit Markups 9/30/2025 2:24 PM P_Civil_Plans_25082 6_v1.pdf 5 239 Huy Huynh: Added Text Box 9/30/2025 2:25 PM P_Civil_Plans_25082 6_v1.pdf 5 Message Date Time Document Page Number 240 Huy Huynh: Edited Text Box (provide postmaster approval for mailbox location ) 9/30/2025 2:25 PM P_Civil_Plans_25082 6_v1.pdf 5 241 Huy Huynh: Added Callout 9/30/2025 2:26 PM P_Civil_Plans_25082 6_v1.pdf 5 242 Huy Huynh: Edited Callout (existing service shall be cut and cap at the main ) 9/30/2025 2:26 PM P_Civil_Plans_25082 6_v1.pdf 5 243 Huy Huynh: Added Callout 9/30/2025 2:27 PM P_Civil_Plans_25082 6_v1.pdf 5 244 Huy Huynh: Edited Callout (sewer stub, provide cleanout at property line ) 9/30/2025 2:28 PM P_Civil_Plans_25082 6_v1.pdf 5 245 Huy Huynh: Move Callout 9/30/2025 2:28 PM P_Civil_Plans_25082 6_v1.pdf 5 246 Huy Huynh: Move Markups 9/30/2025 2:28 PM P_Civil_Plans_25082 6_v1.pdf 5 247 Huy Huynh: Edited Callout (sewer stub, provide cleanout at property line. Please reference standard detail ) 9/30/2025 2:28 PM P_Civil_Plans_25082 6_v1.pdf 5 248 Huy Huynh: Added Callout 9/30/2025 2:28 PM P_Civil_Plans_25082 6_v1.pdf 5 249 Huy Huynh: Edited Callout (provide cleanout )9/30/2025 2:28 PM P_Civil_Plans_25082 6_v1.pdf 5 250 Huy Huynh: Add Leader 9/30/2025 2:29 PM P_Civil_Plans_25082 6_v1.pdf 5 251 Huy Huynh: Edited Callout (relocate meter outside of driveway. label "1" service minimum" (typ)) 9/30/2025 2:31 PM P_Civil_Plans_25082 6_v1.pdf 5 252 Huy Huynh: Left Session 9/30/2025 2:53 PM 253 Becca Tjelle: Joined Session 10/1/2025 2:27 PM 254 Becca Tjelle: Add Text Box 10/1/2025 2:29 PM P_Civil_Plans_25082 6_v1.pdf 1 Message Date Time Document Page Number 255 Becca Tjelle: Edited Text Box (C25004509)10/1/2025 2:29 PM P_Civil_Plans_25082 6_v1.pdf 1 256 Becca Tjelle: Add Text Box 10/1/2025 2:29 PM P_Civil_Plans_25082 6_v1.pdf 1 257 Becca Tjelle: Move Text Box 10/1/2025 2:30 PM P_Civil_Plans_25082 6_v1.pdf 1 258 Becca Tjelle: Delete Text Box 10/1/2025 2:30 PM P_Civil_Plans_25082 6_v1.pdf 259 Becca Tjelle: Apply Markups to All Pages 10/1/2025 2:30 PM P_Civil_Plans_25082 6_v1.pdf 1 260 Becca Tjelle: Add Text Box 10/1/2025 2:30 PM P_Civil_Plans_25082 6_v1.pdf 1 261 Becca Tjelle: Edited Text Box (TED-40-4372)10/1/2025 2:30 PM P_Civil_Plans_25082 6_v1.pdf 1 262 Becca Tjelle: Apply Markups to All Pages 10/1/2025 2:31 PM P_Civil_Plans_25082 6_v1.pdf 1 263 Becca Tjelle: Add Callout 10/1/2025 2:31 PM P_Civil_Plans_25082 6_v1.pdf 1 264 Becca Tjelle: Move Callout 10/1/2025 2:31 PM P_Civil_Plans_25082 6_v1.pdf 1 265 Becca Tjelle: Add Callout 10/1/2025 2:31 PM P_Civil_Plans_25082 6_v1.pdf 1 266 Becca Tjelle: Delete Leader 10/1/2025 2:31 PM P_Civil_Plans_25082 6_v1.pdf 1 267 Becca Tjelle: Add Text Box 10/1/2025 2:31 PM P_Civil_Plans_25082 6_v1.pdf 1 Message Date Time Document Page Number 268 Becca Tjelle: Edited Text Box (R-437201)10/1/2025 2:31 PM P_Civil_Plans_25082 6_v1.pdf 1 269 Becca Tjelle: Edit Markups 10/1/2025 2:31 PM P_Civil_Plans_25082 6_v1.pdf 1 270 Becca Tjelle: Move Text Box 10/1/2025 2:31 PM P_Civil_Plans_25082 6_v1.pdf 1 271 Becca Tjelle: Apply Markups to All Pages 10/1/2025 2:32 PM P_Civil_Plans_25082 6_v1.pdf 1 272 Becca Tjelle: Edited Text Box (R-437202)10/1/2025 2:32 PM P_Civil_Plans_25082 6_v1.pdf 2 273 Becca Tjelle: Edited Text Box (R-437203)10/1/2025 2:32 PM P_Civil_Plans_25082 6_v1.pdf 3 274 Becca Tjelle: Edited Text Box (R-437204)10/1/2025 2:32 PM P_Civil_Plans_25082 6_v1.pdf 4 275 Becca Tjelle: Edited Text Box (R-437205)10/1/2025 2:32 PM P_Civil_Plans_25082 6_v1.pdf 5 276 Becca Tjelle: Edited Text Box (R-437206)10/1/2025 2:32 PM P_Civil_Plans_25082 6_v1.pdf 6 277 Becca Tjelle: Edited Text Box (R-437207)10/1/2025 2:32 PM P_Civil_Plans_25082 6_v1.pdf 7 278 Becca Tjelle: Edited Text Box (R-437208)10/1/2025 2:32 PM P_Civil_Plans_25082 6_v1.pdf 8 279 Becca Tjelle: Edited Text Box (R-437209)10/1/2025 2:32 PM P_Civil_Plans_25082 6_v1.pdf 9 280 Becca Tjelle: Edited Text Box (S-437201)10/1/2025 2:32 PM P_Civil_Plans_25082 6_v1.pdf 10 Message Date Time Document Page Number 281 Becca Tjelle: Edited Text Box (W-437201)10/1/2025 2:33 PM P_Civil_Plans_25082 6_v1.pdf 11 282 Becca Tjelle: Move Markups 10/1/2025 2:33 PM P_Civil_Plans_25082 6_v1.pdf 11 283 Becca Tjelle: Edit Markups 10/1/2025 2:33 PM P_Civil_Plans_25082 6_v1.pdf 11 284 Becca Tjelle: Move Text Box 10/1/2025 2:33 PM P_Civil_Plans_25082 6_v1.pdf 11 285 Becca Tjelle: Add Text Box 10/1/2025 2:33 PM P_Civil_Plans_25082 6_v1.pdf 11 286 Becca Tjelle: Edited Text Box (WTR-27-4372)10/1/2025 2:33 PM P_Civil_Plans_25082 6_v1.pdf 11 287 Becca Tjelle: Add Text Box 10/1/2025 2:33 PM P_Civil_Plans_25082 6_v1.pdf 10 288 Becca Tjelle: Edited Text Box (WWP-27-4372)10/1/2025 2:33 PM P_Civil_Plans_25082 6_v1.pdf 10 289 Becca Tjelle: Move Markups 10/1/2025 2:33 PM P_Civil_Plans_25082 6_v1.pdf 10 290 Becca Tjelle: Edit Markups 10/1/2025 2:33 PM P_Civil_Plans_25082 6_v1.pdf 10 291 Becca Tjelle: Move Text Box 10/1/2025 2:34 PM P_Civil_Plans_25082 6_v1.pdf 10 292 Becca Tjelle: Add Callout 10/1/2025 2:34 PM P_Civil_Plans_25082 6_v1.pdf 1 293 Becca Tjelle: Set status to Finished 10/1/2025 2:34 PM 294 Becca Tjelle: Left Session 10/1/2025 2:34 PM 295 Huy Huynh: Joined Session 10/1/2025 4:20 PM 296 Huy Huynh: Reconnected 10/2/2025 7:23 AM Message Date Time Document Page Number 297 Huy Huynh: Left Session 10/2/2025 7:30 AM 298 Huy Huynh: Joined Session 10/2/2025 10:32 AM 299 Huy Huynh: Added Text Box 10/2/2025 10:44 AM RS_TIR_250826_v1.p df 20 300 Huy Huynh: Edited Text Box (Please provide landuse breakdown map showing fully built out condition ) 10/2/2025 10:44 AM RS_TIR_250826_v1.p df 20 301 Huy Huynh: Move Text Box 10/2/2025 10:44 AM RS_TIR_250826_v1.p df 20 302 ppierson: Joined Session 10/2/2025 10:56 AM 303 jgrant: Joined Session 10/2/2025 11:49 AM 304 jgrant: Set status to Finished 10/2/2025 12:01 PM 305 jgrant: Left Session 10/2/2025 12:01 PM 306 Jvaldez: Joined Session 10/2/2025 12:58 PM 307 Huy Huynh: Left Session 10/2/2025 1:03 PM 308 Huy Huynh: Joined Session 10/2/2025 1:23 PM 309 Jvaldez: Left Session 10/2/2025 1:36 PM 310 Huy Huynh: Added Callout 10/2/2025 1:39 PM P_Civil_Plans_25082 6_v1.pdf 6 311 Huy Huynh: Edited Callout (please show pad elevation )10/2/2025 1:39 PM P_Civil_Plans_25082 6_v1.pdf 6 312 Huy Huynh: Add Leader 10/2/2025 1:39 PM P_Civil_Plans_25082 6_v1.pdf 6 313 Huy Huynh: Added Text Box 10/2/2025 1:41 PM P_Civil_Plans_25082 6_v1.pdf 6 314 Huy Huynh: Edited Text Box (clearly depict tie point of proposed finished grade to existing grade ) 10/2/2025 1:41 PM P_Civil_Plans_25082 6_v1.pdf 6 315 Huy Huynh: Move Text Box 10/2/2025 1:41 PM P_Civil_Plans_25082 6_v1.pdf 6 Message Date Time Document Page Number 316 Huy Huynh: Move Markups 10/2/2025 1:41 PM P_Civil_Plans_25082 6_v1.pdf 6 317 Huy Huynh: Move Text Box 10/2/2025 1:41 PM P_Civil_Plans_25082 6_v1.pdf 6 318 Huy Huynh: Added Callout 10/2/2025 1:48 PM P_Civil_Plans_25082 6_v1.pdf 6 319 Huy Huynh: Edited Callout (replace with vanned grate )10/2/2025 1:49 PM P_Civil_Plans_25082 6_v1.pdf 6 320 Huy Huynh: Added Line 10/2/2025 1:50 PM P_Civil_Plans_25082 6_v1.pdf 7 321 Huy Huynh: Added Callout 10/2/2025 1:50 PM P_Civil_Plans_25082 6_v1.pdf 7 322 Huy Huynh: Edited Callout (replace with R1B - 104.2 (hh to check) ) 10/2/2025 1:50 PM P_Civil_Plans_25082 6_v1.pdf 7 323 Huy Huynh: Added Line 10/2/2025 1:51 PM P_Civil_Plans_25082 6_v1.pdf 9 324 Huy Huynh: Added Line 10/2/2025 1:52 PM P_Civil_Plans_25082 6_v1.pdf 10 325 Huy Huynh: Move Markups 10/2/2025 1:52 PM P_Civil_Plans_25082 6_v1.pdf 10 326 Huy Huynh: Added Line 10/2/2025 1:52 PM P_Civil_Plans_25082 6_v1.pdf 11 327 Huy Huynh: Move Markups 10/2/2025 1:53 PM P_Civil_Plans_25082 6_v1.pdf 11 328 Huy Huynh: Added Line 10/2/2025 1:53 PM P_Civil_Plans_25082 6_v1.pdf 11 Message Date Time Document Page Number 329 Huy Huynh: Added Callout 10/2/2025 2:06 PM P_Civil_Plans_25082 6_v1.pdf 5 330 Huy Huynh: Edited Callout (provide 2 perforated pipe in the same trench at 6' apart from center of pipe ) 10/2/2025 2:07 PM P_Civil_Plans_25082 6_v1.pdf 5 331 Huy Huynh: Move Callout 10/2/2025 2:07 PM P_Civil_Plans_25082 6_v1.pdf 5 332 Huy Huynh: Edited Callout (provide 2 perforated pipes in the same trench at a minimum of 6' apart from center of pipe ) 10/2/2025 2:07 PM P_Civil_Plans_25082 6_v1.pdf 5 333 Huy Huynh: Move Callout 10/2/2025 2:07 PM P_Civil_Plans_25082 6_v1.pdf 5 334 Huy Huynh: Added Callout 10/2/2025 2:17 PM RS_TIR_250826_v1.p df 40 335 Huy Huynh: Edited Callout (2022 RSWDM)10/2/2025 2:18 PM RS_TIR_250826_v1.p df 40 336 Huy Huynh: Added Text Box 10/2/2025 2:25 PM RS_TIR_250826_v1.p df 21 337 Huy Huynh: Edited Text Box (3700 SF will also be verified at the time of building permit ) 10/2/2025 2:26 PM RS_TIR_250826_v1.p df 21 338 Huy Huynh: Move Markups 10/2/2025 2:26 PM RS_TIR_250826_v1.p df 21 339 ppierson: Left Session 10/2/2025 2:26 PM 340 Huy Huynh: Delete Callout 10/2/2025 2:26 PM RS_TIR_250826_v1.p df 341 Huy Huynh: Delete Text Box 10/2/2025 2:30 PM RS_TIR_250826_v1.p df 342 Huy Huynh: Added Callout 10/2/2025 2:30 PM RS_TIR_250826_v1.p df 20 Message Date Time Document Page Number 343 Huy Huynh: Edited Callout (per 2022 RSWDM, developed previous surface area shall be modeled as lawn instead of pasture ) 10/2/2025 2:31 PM RS_TIR_250826_v1.p df 20 344 Huy Huynh: Move Callout 10/2/2025 2:31 PM RS_TIR_250826_v1.p df 20 345 Huy Huynh: Added Text Box 10/2/2025 2:32 PM RS_TIR_250826_v1.p df 22 346 Huy Huynh: Edited Text Box (Please provide conveyance analysis for the proposed 12" storm pipe ) 10/2/2025 2:33 PM RS_TIR_250826_v1.p df 22 347 Huy Huynh: Move Text Box 10/2/2025 2:33 PM RS_TIR_250826_v1.p df 22 348 Huy Huynh: Move Markups 10/2/2025 2:33 PM RS_TIR_250826_v1.p df 22 349 Huy Huynh: Move Text Box 10/2/2025 2:33 PM RS_TIR_250826_v1.p df 22 350 Huy Huynh: Added Text Box 10/2/2025 2:34 PM RS_TIR_250826_v1.p df 64 351 Huy Huynh: Edited Text Box (revise model showing lawn vs. pasture in developed condition ) 10/2/2025 2:34 PM RS_TIR_250826_v1.p df 64 352 Huy Huynh: Left Session 10/2/2025 3:14 PM 353 ppierson: Joined Session 10/2/2025 3:21 PM 354 ppierson: Left Session 10/2/2025 3:22 PM 355 mbenoit: Joined Session 10/3/2025 8:29 AM 356 mbenoit: Paste 10/3/2025 9:21 AM P_Civil_Plans_25082 6_v1.pdf 10 357 mbenoit: Move Line 10/3/2025 9:21 AM P_Civil_Plans_25082 6_v1.pdf 10 Message Date Time Document Page Number 358 mbenoit: Paste 10/3/2025 10:14 AM P_Civil_Plans_25082 6_v1.pdf 10 359 mbenoit: Edited Callout (Not needed. no main line C/O on project stub C/O per 406.1) 10/3/2025 10:15 AM P_Civil_Plans_25082 6_v1.pdf 10 360 mbenoit: Paste 10/3/2025 10:20 AM P_Civil_Plans_25082 6_v1.pdf 5 361 mbenoit: Move Callout 10/3/2025 10:20 AM P_Civil_Plans_25082 6_v1.pdf 5 362 mbenoit: Move Markups 10/3/2025 10:21 AM P_Civil_Plans_25082 6_v1.pdf 5 363 mbenoit: Edited Callout (cut and cap at P/L)10/3/2025 10:21 AM P_Civil_Plans_25082 6_v1.pdf 5 364 mbenoit: Edited Callout (Not needed. no main line C/O on project. stub C/O per 406.1) 10/3/2025 10:23 AM P_Civil_Plans_25082 6_v1.pdf 10 365 mbenoit: Set status to Finished 10/3/2025 10:24 AM 366 mbenoit: Left Session 10/3/2025 10:24 AM 367 mbenoit: Joined Session 10/3/2025 10:24 AM 368 mbenoit: Left Session 10/3/2025 1:06 PM 369 Jvaldez: Joined Session 10/3/2025 2:16 PM 370 Jvaldez: Added Callout 10/3/2025 2:27 PM P_Civil_Plans_25082 6_v1.pdf 5 371 Jvaldez: Edited Callout (MINIMUM 30" SEPARATION ABOVE PRIVATE WATER SERVICE LINES ) 10/3/2025 2:27 PM P_Civil_Plans_25082 6_v1.pdf 5 372 Jvaldez: Edited Callout (MINIMUM 30" SEPARATION ABOVE PRIVATE WATER SERVICE LINES BEHIND WATER METERS ) 10/3/2025 2:28 PM P_Civil_Plans_25082 6_v1.pdf 5 Message Date Time Document Page Number 373 Jvaldez: Move Markups 10/3/2025 2:28 PM P_Civil_Plans_25082 6_v1.pdf 5 374 Jvaldez: Autosize Text Box 10/3/2025 2:28 PM P_Civil_Plans_25082 6_v1.pdf 5 375 Jvaldez: Move Callout 10/3/2025 2:28 PM P_Civil_Plans_25082 6_v1.pdf 5 376 Jvaldez: Edited Callout (MAXIMUM 30" COVER OF PRIVATE WATER SERVICE LINE. ) 10/3/2025 2:32 PM P_Civil_Plans_25082 6_v1.pdf 5 377 Jvaldez: Move Markups 10/3/2025 2:34 PM P_Civil_Plans_25082 6_v1.pdf 5 378 Jvaldez: Edited Callout (MAXIMUM 30" COVER OF PRIVATE WATER SERVICE LINE. INFILTRATION TRENCH SHOWS DEPTH OF 3'. RELOATE WATER SERVICE LINES TO MEET COVER REQUIREMENTS PER COR STD PLAN 320.1) 10/3/2025 2:34 PM P_Civil_Plans_25082 6_v1.pdf 5 379 Jvaldez: Move Markups 10/3/2025 2:34 PM P_Civil_Plans_25082 6_v1.pdf 5 380 Jvaldez: Autosize Text Box 10/3/2025 2:34 PM P_Civil_Plans_25082 6_v1.pdf 5 381 Jvaldez: Move Callout 10/3/2025 2:34 PM P_Civil_Plans_25082 6_v1.pdf 5 382 Jvaldez: Edited Callout (MAXIMUM 30" COVER OF PRIVATE WATER SERVICE LINE. INFILTRATION TRENCH SHOWS DEPTH OF 3'. RELOATE WATER SERVICE LINES TO MEET COVER REQUIREMENTS PER COR STD PLAN 320.1 (TYP)) 10/3/2025 2:35 PM P_Civil_Plans_25082 6_v1.pdf 5 383 Jvaldez: Added Callout 10/3/2025 2:35 PM P_Civil_Plans_25082 6_v1.pdf 5 Message Date Time Document Page Number 384 Jvaldez: Edited Callout (BY CITY FORCES )10/3/2025 2:35 PM P_Civil_Plans_25082 6_v1.pdf 5 385 Jvaldez: Move Callout 10/3/2025 2:35 PM P_Civil_Plans_25082 6_v1.pdf 5 386 Jvaldez: Added Callout 10/3/2025 2:36 PM P_Civil_Plans_25082 6_v1.pdf 5 387 Jvaldez: Edited Callout (SHOW NEW WATER METER AND SERVICE FOR LOT 2) 10/3/2025 2:36 PM P_Civil_Plans_25082 6_v1.pdf 5 388 Jvaldez: Paste 10/3/2025 2:37 PM P_Civil_Plans_25082 6_v1.pdf 5 389 Jvaldez: Move Markups 10/3/2025 2:37 PM P_Civil_Plans_25082 6_v1.pdf 5 390 Jvaldez: Move Markups 10/3/2025 2:37 PM P_Civil_Plans_25082 6_v1.pdf 5 391 Jvaldez: Added Callout 10/3/2025 2:37 PM P_Civil_Plans_25082 6_v1.pdf 5 392 Jvaldez: Edited Callout (INSTALL NEW ISOLATION GATE VALVE (MJxMJ)) 10/3/2025 2:37 PM P_Civil_Plans_25082 6_v1.pdf 5 393 Jvaldez: Move Callout 10/3/2025 2:37 PM P_Civil_Plans_25082 6_v1.pdf 5 394 Jvaldez: Added Callout 10/3/2025 2:38 PM P_Civil_Plans_25082 6_v1.pdf 5 395 Jvaldez: Edited Callout (ON-SITE )10/3/2025 2:38 PM P_Civil_Plans_25082 6_v1.pdf 5 396 Jvaldez: Move Callout 10/3/2025 2:38 PM P_Civil_Plans_25082 6_v1.pdf 5 Message Date Time Document Page Number 397 Jvaldez: Added Callout 10/3/2025 2:39 PM P_Civil_Plans_25082 6_v1.pdf 5 398 Jvaldez: Edited Callout (ADD NOTE: ) 10/3/2025 2:39 PM P_Civil_Plans_25082 6_v1.pdf 5 399 Jvaldez: Move Markups 10/3/2025 2:39 PM P_Civil_Plans_25082 6_v1.pdf 5 400 Jvaldez: Edited Callout (ADD NOTE: A RESIDENTIAL FIRE SPRINKLER SYSTEM IS REQUIRED FOR BUILDINGS ) 10/3/2025 2:39 PM P_Civil_Plans_25082 6_v1.pdf 5 401 Jvaldez: Delete Callout 10/3/2025 2:40 PM P_Civil_Plans_25082 6_v1.pdf 402 Jvaldez: Added Callout 10/3/2025 2:48 PM P_Civil_Plans_25082 6_v1.pdf 11 403 Jvaldez: Edited Callout (ADD COR STD PLAN 330.7 VALVE BOX, OEPRATING NUT EXTENSION, AND MARKER POST ) 10/3/2025 2:48 PM P_Civil_Plans_25082 6_v1.pdf 11 404 Jvaldez: Move Callout 10/3/2025 2:48 PM P_Civil_Plans_25082 6_v1.pdf 11 405 Jvaldez: Move Markups 10/3/2025 2:48 PM P_Civil_Plans_25082 6_v1.pdf 11 406 Jvaldez: Autosize Text Box 10/3/2025 2:48 PM P_Civil_Plans_25082 6_v1.pdf 11 407 Jvaldez: Set status to Reviewing 10/3/2025 2:54 PM 408 Jvaldez: Left Session 10/3/2025 2:54 PM 409 KRevans: Joined Session 10/3/2025 4:34 PM 410 KRevans: Left Session 10/3/2025 4:49 PM 411 KRevans: Joined Session 10/6/2025 8:58 AM 412 Jvaldez: Joined Session 10/6/2025 9:07 AM Message Date Time Document Page Number 413 KRevans: Add Cloud+10/6/2025 9:27 AM RS_TIR_250826_v1.p df 12 414 KRevans: Edited Cloud+ (Increasing the trench width beyond 2' does not decrease the required trench length.) 10/6/2025 9:27 AM RS_TIR_250826_v1.p df 12 415 KRevans: Edit Cloud+10/6/2025 9:27 AM RS_TIR_250826_v1.p df 12 416 KRevans: Move Markups 10/6/2025 9:27 AM RS_TIR_250826_v1.p df 12 417 KRevans: Added Callout 10/6/2025 9:30 AM P_Civil_Plans_25082 6_v1.pdf 5 418 KRevans: Edited Callout (Increasing the trench width beyond 2' does not decrease the required trench length.) 10/6/2025 9:30 AM P_Civil_Plans_25082 6_v1.pdf 5 419 KRevans: Add Leader 10/6/2025 9:30 AM P_Civil_Plans_25082 6_v1.pdf 5 420 KRevans: Move Callout 10/6/2025 9:30 AM P_Civil_Plans_25082 6_v1.pdf 5 421 KRevans: Added Text Box 10/6/2025 9:34 AM RS_TIR_250826_v1.p df 18 422 KRevans: Edited Text Box (Increasing the trench width beyond 2' does not decrease the required trench length. The infiltration trench as proposed is insufficient.) 10/6/2025 9:35 AM RS_TIR_250826_v1.p df 18 423 KRevans: Move Markups 10/6/2025 9:35 AM RS_TIR_250826_v1.p df 18 424 KRevans: Move Text Box 10/6/2025 9:35 AM RS_TIR_250826_v1.p df 18 425 KRevans: Paste 10/6/2025 9:35 AM RS_TIR_250826_v1.p df 19 Message Date Time Document Page Number 426 KRevans: Move Text Box 10/6/2025 9:35 AM RS_TIR_250826_v1.p df 19 427 KRevans: Edited Text Box (Increasing the trench width beyond 2' does not decrease the required trench length. The infiltration trench as proposed is insufficient to provide as an on-site BMP or to provide flow control.) 10/6/2025 9:36 AM RS_TIR_250826_v1.p df 18 428 KRevans: Paste 10/6/2025 9:36 AM RS_TIR_250826_v1.p df 19 429 KRevans: Delete Text Box 10/6/2025 9:36 AM RS_TIR_250826_v1.p df 430 KRevans: Move Text Box 10/6/2025 9:36 AM RS_TIR_250826_v1.p df 19 431 KRevans: Paste 10/6/2025 9:36 AM RS_TIR_250826_v1.p df 12 432 KRevans: Edited Cloud+ (Increasing the trench width beyond 2' does not decrease the required trench length. The infiltration trench as proposed is insufficient to provide as an on-site BMP or to provide flow control.) 10/6/2025 9:36 AM RS_TIR_250826_v1.p df 12 433 KRevans: Move Markups 10/6/2025 9:36 AM RS_TIR_250826_v1.p df 12 434 KRevans: Edit Cloud+10/6/2025 9:36 AM RS_TIR_250826_v1.p df 12 435 KRevans: Move Markups 10/6/2025 9:36 AM RS_TIR_250826_v1.p df 12 436 KRevans: Delete Text Box 10/6/2025 9:36 AM RS_TIR_250826_v1.p df 437 KRevans: Paste 10/6/2025 9:37 AM RS_TIR_250826_v1.p df 20 Message Date Time Document Page Number 438 KRevans: Move Text Box 10/6/2025 9:37 AM RS_TIR_250826_v1.p df 20 439 KRevans: Add Cloud+10/6/2025 9:38 AM RS_TIR_250826_v1.p df 20 440 KRevans: Edited Cloud+ (The BMP sizing credit to model )10/6/2025 9:41 AM RS_TIR_250826_v1.p df 20 441 Jvaldez: Move Callout 10/6/2025 9:41 AM P_Civil_Plans_25082 6_v1.pdf 5 442 Jvaldez: Delete Callout 10/6/2025 9:42 AM P_Civil_Plans_25082 6_v1.pdf 443 Jvaldez: Delete Markups 10/6/2025 9:42 AM P_Civil_Plans_25082 6_v1.pdf 444 Jvaldez: Delete Callout 10/6/2025 9:42 AM P_Civil_Plans_25082 6_v1.pdf 445 Jvaldez: Move Callout 10/6/2025 9:44 AM P_Civil_Plans_25082 6_v1.pdf 5 446 Jvaldez: Move Markups 10/6/2025 9:44 AM P_Civil_Plans_25082 6_v1.pdf 5 447 Jvaldez: Edit 10/6/2025 9:44 AM P_Civil_Plans_25082 6_v1.pdf 5 448 KRevans: Delete Cloud+10/6/2025 9:44 AM RS_TIR_250826_v1.p df 449 Jvaldez: Add Length Measurement 10/6/2025 9:44 AM P_Civil_Plans_25082 6_v1.pdf 5 450 Jvaldez: Move Length Measurement 10/6/2025 9:45 AM P_Civil_Plans_25082 6_v1.pdf 5 Message Date Time Document Page Number 451 Jvaldez: Added PolyLine 10/6/2025 9:45 AM P_Civil_Plans_25082 6_v1.pdf 5 452 Jvaldez: Move PolyLine 10/6/2025 9:45 AM P_Civil_Plans_25082 6_v1.pdf 5 453 Jvaldez: Move Markups 10/6/2025 9:45 AM P_Civil_Plans_25082 6_v1.pdf 5 454 Jvaldez: Paste 10/6/2025 9:45 AM P_Civil_Plans_25082 6_v1.pdf 5 455 Jvaldez: Move Markups 10/6/2025 9:45 AM P_Civil_Plans_25082 6_v1.pdf 5 456 Jvaldez: Move Markups 10/6/2025 9:45 AM P_Civil_Plans_25082 6_v1.pdf 5 457 Jvaldez: Delete Length Measurement 10/6/2025 9:45 AM P_Civil_Plans_25082 6_v1.pdf 458 Jvaldez: Move Callout 10/6/2025 9:45 AM P_Civil_Plans_25082 6_v1.pdf 5 459 Jvaldez: Move Markups 10/6/2025 9:45 AM P_Civil_Plans_25082 6_v1.pdf 5 460 Jvaldez: Move Callout 10/6/2025 9:45 AM P_Civil_Plans_25082 6_v1.pdf 5 461 Jvaldez: Added Callout 10/6/2025 9:47 AM P_Civil_Plans_25082 6_v1.pdf 5 462 Jvaldez: Edited Callout (REFER TO COR STD PLAN 320.1 (TYP)) 10/6/2025 9:47 AM P_Civil_Plans_25082 6_v1.pdf 5 463 Jvaldez: Add Length Measurement 10/6/2025 9:49 AM P_Landscape_Plans_ 250826_v1.pdf 1 Message Date Time Document Page Number 464 Jvaldez: Delete Length Measurement 10/6/2025 9:49 AM P_Landscape_Plans_ 250826_v1.pdf 465 Jvaldez: Set status to Corrections - Resubmit 10/6/2025 9:50 AM 466 Jvaldez: Left Session 10/6/2025 9:50 AM 467 KRevans: Added Callout 10/6/2025 10:02 AM RS_TIR_250826_v1.p df 20 468 KRevans: Edited Callout (100%)10/6/2025 10:02 AM RS_TIR_250826_v1.p df 20 469 KRevans: Move Markups 10/6/2025 10:02 AM RS_TIR_250826_v1.p df 20 470 KRevans: Move Callout 10/6/2025 10:02 AM RS_TIR_250826_v1.p df 20 471 KRevans: Added Callout 10/6/2025 10:03 AM P_Civil_Plans_25082 6_v1.pdf 5 472 KRevans: Edited Callout (Huy, while the applicant may ultimately opt for a design similar to this, only 1' width on each side of the perforated pipe centerline (2' width total) will count towards the required trench size.) 10/6/2025 10:04 AM P_Civil_Plans_25082 6_v1.pdf 5 473 KRevans: Set status to Reviewed 10/6/2025 10:05 AM 474 KRevans: Left Session 10/6/2025 10:06 AM 475 KRevans: Joined Session 10/6/2025 10:06 AM 476 KRevans: Added Text Box 10/6/2025 10:07 AM P_Civil_Plans_25082 6_v1.pdf 1 477 KRevans: Edited Text Box (Add site-specific construction sequence.) 10/6/2025 10:08 AM P_Civil_Plans_25082 6_v1.pdf 1 478 KRevans: Move Markups 10/6/2025 10:08 AM P_Civil_Plans_25082 6_v1.pdf 1 479 KRevans: Left Session 10/6/2025 10:08 AM 480 Joe Farah: Joined Session 10/7/2025 12:41 PM Message Date Time Document Page Number 481 Joe Farah: Paste 10/7/2025 12:47 PM P_Civil_Plans_25082 6_v1.pdf 6 482 Joe Farah: Move Callout 10/7/2025 12:47 PM P_Civil_Plans_25082 6_v1.pdf 6 483 Joe Farah: Move Markups 10/7/2025 12:47 PM P_Civil_Plans_25082 6_v1.pdf 6 484 Joe Farah: Edited Callout (And RIM El)10/7/2025 12:47 PM P_Civil_Plans_25082 6_v1.pdf 6 485 Joe Farah: Move Markups 10/7/2025 12:47 PM P_Civil_Plans_25082 6_v1.pdf 6 486 Joe Farah: Paste 10/7/2025 12:48 PM P_Civil_Plans_25082 6_v1.pdf 5 487 Joe Farah: Move Markups 10/7/2025 12:48 PM P_Civil_Plans_25082 6_v1.pdf 5 488 Joe Farah: Move Callout 10/7/2025 12:48 PM P_Civil_Plans_25082 6_v1.pdf 5 489 Joe Farah: Edited Callout (doesn't look like there is enough space for a new core for the new pipe. ) 10/7/2025 12:49 PM P_Civil_Plans_25082 6_v1.pdf 5 490 Joe Farah: Move Callout 10/7/2025 12:49 PM P_Civil_Plans_25082 6_v1.pdf 5 491 Joe Farah: Set status to Finished 10/7/2025 12:49 PM 492 Joe Farah: Left Session 10/7/2025 12:49 PM 493 cbarnes: Joined Session 10/9/2025 3:32 PM 494 mbenoit: Joined Session 10/9/2025 3:36 PM 495 cbarnes: Left Session 10/9/2025 3:40 PM 496 mbenoit: Left Session 10/9/2025 4:44 PM 497 Joe Stowell: Joined Session 10/13/2025 1:48 PM 498 Joe Stowell: Left Session 10/13/2025 1:54 PM Message Date Time Document Page Number 499 Huy Huynh: Joined Session 10/15/2025 7:51 AM