Loading...
HomeMy WebLinkAboutMFP24004246.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP24004246 IVR Number: 24004246 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:08/21/2024Application Date:1432700160Parcel Number: 12616 SE 169TH ST Permit Type:02/16/2026Issue Date:Franchise Permit Work Class:02/16/2027Expiration Date:Major Utility Job Number: 186067487Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO REPLACE 3 POLES. 316759 166881; 316760 166895; 316759 166910. NO HS CUTS Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 186067487 12616 SE 169TH ST ABDULLAHI FARAH 253-388-0137 Scott Warlick CED 2/16/2026 Monday Friday 8:00am 3:00pm MFP24004246 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG DRIVEWAY DRIVEWAY DRIVEWAY DRIVEWAY DRIVEWAY DRIVEWAY DRIVEWAY DRIVEWAY DRIVEWAY DRIVEWAYDRIVEWAYDRIVEWAYROWROWROWROWP01P02P03 BEPREPAREDTO STOP BEPREPAREDTO STOP ROADWORKAHEAD ROADWORKAHEAD 100'+/-100'+/-126TH PL SE 100'+/- 100'+/-126TH PL SE ONE LANEROADAHEAD100'+/-100'+/-ROADWORKAHEADSE 169TH ST PLEASE SCHEDULEWITH DISPATCH@ 800-343-4049 OPT.1AND PROVIDE ACOPY OF THE APPROVEDTRAFFIC CONTROL PLANK&D Services, as the preparer of this trafficcontrol plan makes no representation as to its'general adequacy or being approved for implementation.Approval must result from the Traffic Engineer orother Public Official having statutory enforcement authorityin the jurisdiction. Utilization and implementation of thisplan shall be a result of that approval.Ref. MUTCD 2009 6A-01 (10)LegendConeFlaggerPoleNOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 R7-T39 R7-T39BEPREPAREDTO STOP W3-4 Be Prepared To StopROADWORKAHEADW20-1 Road Work AheadONE LANEROADAHEAD W20-4 One Lane Road AheadW20-7a flaggerWork Area Notes:1. All signs and spacing to conform to the MUTCD and King County standards.2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated, if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" (48" x 48" on 45 mph and over roadways) and shall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' for traveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours as per jurisdictional requirements(Generally between 9 a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3 p.m. on arterialsIf night time work is approved, signaling and flaggers shall conform to WAC 296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'. PLACE SPOTTER AT ANY OPEN DRIVEWAY ORENTRANCE LOCATED WITHIN THE WORK ZONE TOASSIST TRAFFIC OUT OF WORK ZONE.MAINTAIN DRIVEWAY ACCESS, IF UNABLE TO NOTIFYHOMEOWNERS OF TEMPORARY CLOSURE.PLACE NO PARKS 72 HOURS IN ADVANCE OF WORKBEING PERFORMED. OFFICE: 800-343-4049DIRECT: 425-923-9086WATCP@KNDSERVICES.NET CUSTOMER:CONTACT:LOCATION:DATE:W/O #ABDULLAHI FARAH253-388-013707/16/24 515032358...12616 SE 169TH STRENTON, WA 98058 WSTCS#012693EXP:1/31/25DESIGNED BY: WHITNEY PATERNO NOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 www.invarion.com Renton standards. MFP24004246 EO P CL RO W P0 1 EOP=5' CL=15' CL=20' E SE 168TH STSE 168TH ST SE 169TH ST 1 2 6 T H P L S E '12630''12638' '12652' INST NEW 37.5 kVA 120/240V XF '12643' '12611' INST NEW 37.5 kVA 120/240V XF '12616''12622' SE 169TH ST EO P CL RO W P0 2 EOP=4' CL=14'6'' CL=18'6'' E EO P CL RO W P0 3 EOP=4'2'' CL=14'4'' CL=18'6'' E 515032358 186067487 PROJECT PHASE PWR NOTIF#ORDER# Superior Sub Order N/A N/A PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG SA P W . O . # 18 6 0 6 7 4 8 7 FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. OH CIRCUIT MAP: D2305E136 SCALE 6" = 1 MILE JOB SITE ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. POWER GENERAL NOTES 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4.All work is to be done in accordance with local municipal and county permit requirements as applicable. 5.Inclement weather conditions may cause delays in construction times and dates. SCALE: 1:100 SITE PLAN: P01-P03 DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP A. FARAH 253-388-0137 2/26/24 J. REYNA 253-259-7076 2/26/24 N/A N/A N/A A. FARAH 253-388-0137 2/26/24 N/A CITY OF RENTON ENGR1 CTLWAQ TK#5785326 REPLACE (3) DIST POLES , WRECKOUT OH TPX & INST (2) XF 12616 SE 169TH ST, RENTON WA 98058 POTELCO N/A N/A N/A 186067487 AS NOTED 1/1 KING N/A N/A QCSOKE T23,R05E,S28 N/A N/A A2305E112,109 D2305E136 R2305E112,109 ROL-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A VICINITY MAP SITE SPECIFIC NOTES P01 (316759-166881) CREW TO CHARGE TIME TO 78501800 -REPLACE 45' POLE -INST 50' CL1 POLE (6010.1000 PD501) -INST 3Ø DBL ARM (6010.1020 ANG312) -WRECK OUT 4/0 OH TPX APPROX. 145'(____') TO P02 -INST NEW 37.5kVA 120/240V XF (6025.1000 TRFPXF) -RE-CONNECT EXIST OH SVCS SPLICE & EXTEND IF NECESSARY (_____/_____') -TRANSFER EXIST S/L (SLAG4190) -INST 3/8" PRI DOWN GUY (6013.0100 GYD3SA) ATTACH TO EXIST ANCHOR -INST 3/8" NEUT DOWN GUY (6013.0100 GYD3SAN) ATTACH TO EXIST ANCHOR -TOP POLE TO COMMS P02 (316760-166895) CREW TO CHARGE TIME TO 78501800 -REPLACE 45' CL4 POLE -INST 50' CL1 POLE (6010.1000 PD501) -INST 3Ø SGL ARM (6033.1010 TAN312) -TRANSFER 37.5kVA 120/240v XF W/ LB C/O FUSED AT 15T (3412300) -REMOVE 3 SPOOL RACK -INST RC (6015.1000 INDNRC) -WRECK OUT 4/0 OH TPX APPROX. 145'(____') TO P03 -TRANSFER EXIST OH SVCS SPLICE & EXTEND IF NECESSARY (_____/_____') -TRANSFER EXIST S/L(SLAG4189) -TOP POLE TO COMMS P03 (316759-166910) CREW TO CHARGE TIME TO 78501800 -REPLACE 45' CL4 POLE -INST 50' CL1 POLE (6010.1000 PD501) -INST 3Ø SGL ARM (6033.1010 TAN312) -INST NEW 37.5kVA 120/240V XF (6025.1000 TRFPXF) -RE-CONNECT EXIST OH SVCS SPLICE & EXTEND IF NECESSARY (_____/_____') -TRANSFER EXIST S/L(SLAG4189) -TOP POLE TO COMMS NOT TO SCALE ROW PROFILE: P01 101174907/108156360 JOB SITE NOT TO SCALE ROW PROFILE: P02 NOT TO SCALE ROW PROFILE: P03 POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P01 316759-166881 50 1 P02 316760-166895 50 1 P03 316759-166910 50 1 POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS SITE # POLE DATA POLE TEL TV FIBER TRAN RMVD ID NUMBER GRID #HEIGHT CLASS YEAR TOPPED RMVD P01 316759-166881 45 UNK UNK SLAG4190 P02 316760-166895 45 4 1958 N/A P03 316759-166910 45 4 1958 SLAG4189 Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (OH) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information 37.5kVA 120/240v 6211300 P01 316759-166881 Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (OH) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information 37.5kVA 120/240v 6211300 P03 316759-166910 New pole at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER TRANSFER Company ID#: Primary phase connected to: Tested Secondary Voltage P02 316760-1668950 50kVA 120/240V MFP24004246 RESTORATION PER CITY OF RENTON STANDARDS This permit is for Major construction work in the ROW and will be billed at an additional $158/HR for inspections. After hours and weekend work will be billed at $175/HR