HomeMy WebLinkAboutERC_Report_Oasis_Academy_Center_260216_v1_FINALDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Project Location Map
ERC_Report_Oasis_Academy_Center_260216_v1_FINAL
ENVIRONMENTAL REVIEW COMMITTEE REPORT
ERC Meeting Date: February 16, 2026
Project File Number: PR26-000009
Project Name: Oasis Academy Center
Land Use File Number: LUA25-000195, ECF, SA-A
Project Manager: Mariah Kerrihard, Associate Planner
Owner: Estate Highlands LLC, 13415 NE 102nd St, Kirkland, WA 98033
Applicant: Hector Vigna, Legacy Construction Group LLC, 551 S Sullivan St Unit C,
Seattle, WA 98108
Contact: Cristhian Arcila, Eleven Siding LLC, 2825 NE 4th Ct, Renton, WA 98056
Project Location: 4508 NE 4th St, Renton, WA 98059 (APN 1023059117)
Project Summary: The applicant is requesting an Environmental (SEPA) Review and Site Plan
Review for the change of use of an existing building into a day care center. The
lot size is 19,867 square feet (0.46 acres). The proposal is to establish a day
care center within a two-story, 1,312-gross-square-foot building and a 504-
square-foot on-site trailer. The exterior site improvements that are proposed
include a 626-square-foot play area. The project site totals 19,867 square feet
in area and is located within the Commercial Arterial (CA) zoning designation,
the Commercial Mixed Use (CMU) Comprehensive Plan Land Use
Designation, the Highlands Community Planning Area and within Urban
Design District D. Existing driveway access curb cuts off NE 4th St would be
maintained. According to City of Renton (COR) Maps, regulated sensitive
slopes (>25% & <=40%) are mapped on the project site, an unnamed Type NS
piped stream runs through the site, and a Category III wetland is located
within 200 feet (200’) of the project site.
Exist. Bldg. Area SF: 1,816 SF Proposed New Bldg. Area (footprint):
Proposed New Bldg. Area (gross):
N/A
N/A
Site Area: 19,867 SF (0.46 acres) Total Building Area GSF: 1,816 SF
STAFF
RECOMMENDATION:
Staff Recommends that the Environmental Review Committee issue a
Determination of Non-Significance - Mitigated (DNS-M).
DocusOgn Envelope ID: FFB6F336-7B75-4DAC-8020-35E8974E808F
City of Renton Department of Community & Economic Development
Oasis Academy Center
Staff Report to the Environmental Review Committee
LUA25-000195, ECF, SA-A
Report of February 16, 2026 Page 2 of 8
ERC_Report_Oasis_Academy_Center_260216_v1_FINAL
PART ONE: PROJECT DESCRIPTION / BACKGROUND
The applicant is requesting Environmental (SEPA) Review for the change of use of an existing 1,312-square-foot
building and a 504-square-foot on-site trailer. The space was previously occupied by PEMCO Insurance. The
applicant is proposing to change the building occupancy classification from B occupancy to E occupancy for a
daycare center located fully within the existing tenant space. Oasis Academy Center is proposed to operate as
a licensed childcare center serving approximately 13-30 children, with an anticipated staffing level of about 6-
10 employees depending on shift coverage, and typical operating hours from 7:00 a.m. to 6:00 p.m., Monday
through Friday, remaining closed on weekends and holidays, consistent with the information provided in the
project narrative and SEPA Environmental Checklist.
The subject property is located on the north side of NE 4th St. The subject property totals 19,867 square feet
(0.46 acres), is zoned Commercial Arterial (CA) and lies within the Commercial Mixed Use (CMU)
Comprehensive Plan Land Use Designation. As shown on the site plan (Exhibit 2), the site is developed with a
two-story, 1,312-gross-square-foot structure, a 504-square-foot on-site trailer, asphalt parking, and associated
site improvements. Surrounding land uses and zoning are illustrated on the Neighborhood Detail Map (Exhibit
3). Additional details regarding proposed operations, enrollment, and hours are provided in the project narrative
(Exhibit 5).
Access is provided via the existing driveway off NE 4th St. The project site has a total of nine (9) parking spaces,
which would be used for staff parking, parent/guardian pick-up and drop-off as well as ADA accessible stalls.
The existing building has a maximum height of 14 feet 8 inches (14’8”). Exterior changes are limited to
replacement of damaged siding with in-kind materials, accessibility upgrades, new perimeter fencing,
rehabilitation of existing landscaped areas and a new 626-square-foot fenced play area at the same elevation
as the main floor. All other improvements would be interior to the tenant’s space.
The existing trailer near the west property line would be used exclusively for storage and as a staff break room.
Domestic water service to the trailer would be permanently disconnected, and the trailer would not be used for
childcare, instruction, or habitation. Existing asphalt pavement totaling approximately 5,628 square feet will
remain unchanged. No new asphalt paving, grading, or expansion of impervious surfaces is proposed. The
applicant submitted an Environmental Checklist, Wetland and Stream Study, Technical Information Report, and
a Trip Generation Assessment to evaluate the application.
PART TWO: ENVIRONMENTAL REVIEW
In compliance with RCW 43.21C.240, the following environmental (SEPA) review addresses only those project
impacts that are not adequately addressed under existing development standards and environmental
regulations.
A. Environmental Threshold Recommendation
Based on analysis of probable impacts from the proposal, staff recommends that the Responsible
Officials:
Issue a Determination of Non-Significance-Mitigated (DNS-M) with a 14-day Appeal Period.
B. Mitigation Measures
1. The applicant shall submit an Inadvertent Discovery Plan (IDP) prepared by a qualified professional
with the civil construction permit for review and approval by the Current Planning Project Manager
prior to permit issuance. In addition, the applicant shall provide notification to Tribes’ cultural
committee prior to the start of construction.
Docusign Envelope ID: FFB6F336-7B75-4DAC-8020-35E8974E808F
City of Renton Department of Community & Economic Development
Oasis Academy Center
Staff Report to the Environmental Review Committee
LUA25-000195, ECF, SA-A
Report of February 16, 2026 Page 3 of 8
ERC_Report_Oasis_Academy_Center_260216_v1_FINAL
C. Exhibits
Exhibit 1: Environmental Review Committee (ERC) Report
Exhibit 2: Site Plan
Exhibit 3: Neighborhood Detail Map
Exhibit 4: SEPA Environmental Checklist, dated February 5, 2026
Exhibit 5: Project Narrative
Exhibit 6: Parking Analysis
Exhibit 7: Landscape Plan
Exhibit 8: Tree Retention and Tree Credit Worksheet
Exhibit 9: Wetland and Stream Study, prepared by Altman Oliver Associates, LLC, dated May
21, 2025
Exhibit 10: Transportation Concurrency Memorandum
Exhibit 11: Trip Generation Assessment, prepared by Health & Associates, dated March 5, 2025
Exhibit 12: Architectural Conceptual Rendering
Exhibit 13: Utility Plan
Exhibit 14: Technical Information Report
Exhibit 15: Septic Abandonment Report
Exhibit 16: Septic Decommissioning Report
Exhibit 17: Sewer Camera Inspection Report
Exhibit 18: Duwamish Tribe Comment Letter, dated July 15, 2025
Exhibit 19: Staff Response Email to Duwamish Tribe Comment Letter, dated July 16, 2025
Exhibit 20: Advisory Notes
D. Environmental Impacts
The Proposal was circulated and reviewed by various City Departments and Divisions to determine whether
the applicant has adequately identified and addressed environmental impacts anticipated to occur in
conjunction with the proposed development. Staff reviewers have identified that the proposal is likely to have
the following probable impacts:
1. Earth
Impacts: The project site is a fully developed commercial property with established parking and
driveway access. The site is characterized by gently sloping topography, with overall slopes generally
less than approximately five percent (5%), and steeper slopes associated with the mapped wetland
and stream area located away from the proposed work. The site contains natural soils typical of the
region, including a mix of clay and sandy loam, particularly within the wetland buffer area. No
grading, excavation, or large-scale removal of soil is planned, and ground disturbance is limited to
minor improvements within previously developed areas. Soil and slope conditions in and around the
on-site Category III wetland and associated stream, including identification of the steeper mapped
slopes located away from proposed work areas, are documented in the Wetland and Stream Study
prepared by Altman Oliver Associates, LLC (Exhibit 9). Given the site’s existing development and
Docusign Envelope ID: FFB6F336-7B75-4DAC-8020-35E8974E808F
City of Renton Department of Community & Economic Development
Oasis Academy Center
Staff Report to the Environmental Review Committee
LUA25-000195, ECF, SA-A
Report of February 16, 2026 Page 4 of 8
ERC_Report_Oasis_Academy_Center_260216_v1_FINAL
limited disturbance, potential erosion and earth-related impacts are minimal. No significant erosion
is anticipated due to clearing, construction, or future use of the property.
No further site-specific mitigation is required for the identified impacts beyond implementation of
standard construction best management practices and compliance with applicable grading and
erosion control requirements.
Mitigation Measures: No further mitigation recommended.
Nexus: Not applicable.
2. Air
Impacts: It is anticipated that some temporary air quality impacts could occur during construction
due to exhaust emissions from construction worker vehicles, construction equipment, and limited
soil disturbance. Dust control measures, such as watering exposed soil and minimizing idling of
construction equipment would be implemented during construction. These impacts would be
short-term and typical of small-scale tenant improvement and site work in an urbanized setting.
Long-term, the daycare use is not expected to generate notable air emissions beyond normal vehicle
trips associated with staff, parents, and guardians.
No further site-specific mitigation for the identified impacts from typical vehicle and construction
exhaust is required.
Mitigation Measures: No further mitigation is recommended.
Nexus: Not applicable.
3. Water
a. Surface Water (including streams, rivers, wetlands, lakes)
Impacts: Critical areas mapping and the Wetland and Stream Study identify an on-site Category
III wetland, its associated buffer, and a non-fish-bearing (Ns) stream on or near the project site.
The on-site Category III wetland, associated buffer, and non-fish bearing stream are documented
in the Wetland and Stream Study (Exhibit 9). The applicant has provided Wetland Buffer
Avoidance Documentation demonstrating that all proposed improvements including the
daycare tenant space, trailer use, play area, and associated site features are located outside
regulated critical areas and buffers within a clearly identified no-disturbance zone. No grading,
vegetation removal, or construction activities are proposed within the wetland, stream, or buffer
areas, and no new stormwater outfalls or discharge points to these features are proposed.
Existing trees, tree retention, and tree credit calculations associated with critical area buffers
and site landscaping are documented in the Tree Retention and Tree Credit Worksheet (Exhibit
8). As a result, no direct impacts to regulated surface waters or critical area functions are
anticipated.
Mitigation Measures: No further mitigation is recommended.
Nexus: Not applicable.
b. Groundwater
Impacts: The proposal does not include deep excavation, dewatering, or installation of
subsurface discharge facilities beyond the existing utility connections that serve the site. Ground
disturbance is limited to minor footing work and small improvements within already developed
areas, and the environmental checklist does not identify any known contamination or
groundwater wells on the site. Groundwater impacts are therefore not anticipated.
Mitigation Measures: No further mitigation is recommended.
Docusign Envelope ID: FFB6F336-7B75-4DAC-8020-35E8974E808F
City of Renton Department of Community & Economic Development
Oasis Academy Center
Staff Report to the Environmental Review Committee
LUA25-000195, ECF, SA-A
Report of February 16, 2026 Page 5 of 8
ERC_Report_Oasis_Academy_Center_260216_v1_FINAL
Nexus: Not applicable.
c. Water Runoff (including stormwater)
Impacts: Stormwater runoff would continue to originate from existing impervious surfaces,
including the building roof, asphalt pavement, and walkways. No new asphalt paving, concrete
slabs, or sealed surfaces are proposed, and existing drainage patterns and the on-site
stormwater collection system would remain in place. Runoff would continue to be collected via
existing roof drains and surface flow to on-site inlets and conveyed to the municipal stormwater
system, with no new discharge points and no direct discharge to wetlands or streams. The
proposed 626-square-foot outdoor play area would not include a concrete slab, asphalt,
membrane, or any other impermeable base beneath the play area. Proposed fencing locations
and landscape areas adjacent to the play area and parking are shown on the Landscape Plan
(Exhibit 7). As designed, the project is not anticipated to increase stormwater quantity or alter
drainage patterns in a manner that would adversely affect downstream systems or critical areas.
Best management practices, including maintenance of existing stormwater infrastructure,
limiting soil disturbance during construction, and implementing erosion and sediment control
as needed, would be used to reduce stormwater impacts. Compliance with the 2022 Renton
Surface Water Design Manual and any conditions imposed through Development Engineering
review would be required at building permit review; if new impervious surface is added at that
time, the project shall comply with all applicable requirements of the then-current Renton
Surface Water Design Manual.
Mitigation Measures: No further mitigation is recommended.
Nexus: Not applicable.
4. Environmental Health
a. Environmental Health Hazards
Impacts: The project involves interior tenant improvements and minor exterior work for the
proposed playground area, with no industrial processes or use of hazardous substances
proposed. Normal daycare operations would not generate hazardous or toxic materials beyond
small quantities of typical cleaning products, which would be stored and used in accordance
with manufacturer instructions. The checklist does not identify known contaminated sites or
hazardous waste handling on the property. If asbestos-containing materials, lead-based paint,
or other regulated building materials are encountered during renovation, they would be managed
under applicable state and federal requirements.
Mitigation Measures: No further mitigation is recommended.
Nexus: Not applicable.
b. Noise
Impacts: Short-term construction activity-related noise impacts would primarily result from the
proposed playground and interior improvements proposed as part of the project. Construction
activity hours are restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock
(8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between
nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work shall be permitted on Sundays.
Haul hours shall be restricted to the hours between eight-thirty (8:30) a.m. and three-thirty (3:30)
p.m., Monday through Friday unless otherwise approved in advance by the Development
Services Division.
All noise levels would be required to comply with City of Renton code (Chapter 7 Noise Level
Regulations) and Washington Administrative Code (WAC 173-60, Maximum Environmental
Docusign Envelope ID: FFB6F336-7B75-4DAC-8020-35E8974E808F
City of Renton Department of Community & Economic Development
Oasis Academy Center
Staff Report to the Environmental Review Committee
LUA25-000195, ECF, SA-A
Report of February 16, 2026 Page 6 of 8
ERC_Report_Oasis_Academy_Center_260216_v1_FINAL
Noise Levels). The anticipated temporary noise impacts would be those commonly associated
with mixed-use construction. Long-term, outdoor play activity and vehicle noise from drop-off
and pick-up would occur during daytime hours and are typical for a small daycare in the
Commercial Arterial (CA) zone; no significant noise impacts are anticipated. No further site-
specific mitigation is proposed.
Mitigation Measures: No further mitigation is recommended.
Nexus: Not applicable.
5. Aesthetics
Impacts: The project retains the existing commercial building and trailer and does not change
overall building height or architectural character. Exterior modifications are limited to in-kind
replacement of damaged siding, accessibility improvements, installation of a small, fenced play
area, perimeter fencing, and rehabilitation of existing landscaping, all of which are compatible with
the surrounding commercial development pattern along NE 4th St. The overall architectural
concept, facade treatments, and site layout are illustrated in the Architectural Conceptual
Renderings (Exhibit 12), and building and site improvements, including fencing and planting, are
depicted on the Landscape Plan (Exhibit 7). No significant adverse aesthetic impacts are
anticipated.
Mitigation Measures: No further mitigation is recommended.
Nexus: Not applicable.
6. Light and Glare
Impacts: The project site is located within a developed Commercial Arterial (CA) zone with existing
ambient lighting from nearby commercial uses and NE 4th St. The proposal does not include new
exterior lighting. The Duwamish Tribe has requested that any permanent lighting associated with the
project be dark-sky compliant to reduce light pollution and protect night-sky conditions important to
traditional cultural practices (Exhibit 18). With appropriate fixture selection and aiming, no
significant adverse light and glare impacts are anticipated. The applicant contends that any new or
modified outdoor lighting would be shielded and directed downwards to prevent spillovers onto
adjacent properties.
Mitigation Measures: No further mitigation is recommended.
Nexus: Not applicable.
7. Historic and Cultural Preservation
Impacts: The project site is located within the ancestral lands of the Duwamish people. Staff
received a comment from the Duwamish Tribal Historic Preservation Office (Exhibit 18) during the
14-day public comment period identifying the area as culturally significant with a low probability of
encountering unknown archaeological deposits. The DAHP WISAARD predictive model indicates a
moderately low risk for encountering archaeological resources depending on project parameters.
This letter notes that this area is considered culturally significant and that there are three (3)
historical and ancestral Duwamish place names within about one (1) mile of the project location.
The Duwamish Tribe requested that an Inadvertent Discovery Plan (IDP) be provided for the proposed
project if any groundbreaking activity occurs below fill, topsoil, or other impervious surfaces into
native soil, due to the potential for archaeological resources being discovered on the project site. To
ensure that any archaeological deposits are managed appropriately, staff recommends, as a SEPA
mitigation measure, that the applicant submit an Inadvertent Discovery Plan (IDP) prepared by a
qualified professional with the building permit for review and approval by the Current Planning
Docusign Envelope ID: FFB6F336-7B75-4DAC-8020-35E8974E808F
City of Renton Department of Community & Economic Development
Oasis Academy Center
Staff Report to the Environmental Review Committee
LUA25-000195, ECF, SA-A
Report of February 16, 2026 Page 7 of 8
ERC_Report_Oasis_Academy_Center_260216_v1_FINAL
Project Manager prior to permit issuance. In addition, the applicant shall provide notification to
Tribes’ cultural committee prior to the start of construction.
Mitigation Measures: The applicant shall submit an Inadvertent Discovery Plan (IDP) prepared by a
qualified professional with the building permit for review and approval by the Current Planning
Project Manager prior to permit issuance. The applicant shall provide notification to Tribes’ cultural
committee prior to the start of construction.
Nexus: City of Renton Comprehensive Plan Goals and Policies LU-AA, LU-44, and LU-45; Chapter
27.53 RCW, Archaeological Sites and Resources; Chapter 27.44 RCW, Indian Graves and Records;
Chapter 197-11 WAC, SEPA Rules; and Duwamish Tribe Comment Letter, dated July 16, 2025.
8. Transportation
Impacts: The applicant submitted a Trip Generation Assessment, prepared by Heath & Associates,
dated March 5, 2025 (Exhibit 11), with the project application. In addition, a Transportation
Concurrency Memorandum, prepared by Development Engineering, dated July 23, 2025 (Exhibit 10),
was completed to assess the proposal’s transportation impacts. The Trip Generation Assessment
applies ITE Trip Generation Manual (11th Edition) Land Use Code 565 (Day Care Center) to the
proposed daycare and Land Use Code 712 (Small Office Building) to the existing office use, using
building square footage as the input variable. Using ITE average rates, the proposed daycare is
estimated to generate 87 gross new daily trips, 20 gross AM peak-hour trips, and 20 gross PM
peak-hour trips, with the previous office use providing trip credit; this results in approximately 61 net
new daily trips, 17 net new AM peak-hour trips (8 entering, 9 exiting), and 16 net new PM peak-hour
trips (8 entering, 8 exiting). The assessment also notes that ITE data indicates that a portion of
daycare trips may be pass-by, meaning some peak-hour traffic may already be present on the street
system and not represent fully new trips. On-site parking supply and demand for the daycare use are
evaluated in the Parking Analysis (Exhibit 6), which indicates that existing parking can accommodate
staff and parent/guardian pick-up and drop-off. The daycare would utilize existing driveway access
on NE 4th St, on-site parking, and a designated drop-off/pick-up area, and the surrounding corridor
includes sidewalks and crosswalks that provide pedestrian and ADA-accessible connections to the
site. The City’s Transportation Concurrency Memorandum (Exhibit 10) finds that the development
would generate an increase of approximately 61 weekday daily trips, 17 weekday AM peak-hour trips,
and 16 weekday PM peak-hour trips and confirms that the project passes the City of Renton Traffic
Concurrency Test under RMC 4-6-070D, with sufficient citywide trip capacity remaining.
The Trip Generation Assessment, Traffic Impact Analysis, and Transportation Concurrency
Memorandum indicate that the project complies with City of Renton transportation requirements
and is not expected to create adverse transportation impacts. Required transportation mitigation
would consist of payment of applicable transportation impact fees and completion of frontage and
any site-specific street improvements identified through land use and permit review; no additional
SEPA-specific transportation mitigation is recommended.
Mitigation Measures: No further mitigation is recommended.
Nexus: Not applicable.
9. Public Services
Impacts: The project may increase demand for police, fire, and emergency medical services
consistent with a small daycare facility in an existing commercial area. Renton Regional Fire
Authority and other departments have reviewed the proposal, and no significant adverse impacts to
public services have been identified; the site can be served with existing fire access and water supply
subject to standard conditions. Fire access and water supply conditions are identified in the Advisory
Notes (Exhibit 20).
Docusign Envelope ID: FFB6F336-7B75-4DAC-8020-35E8974E808F
City of Renton Department of Community & Economic Development
Oasis Academy Center
Staff Report to the Environmental Review Committee
LUA25-000195, ECF, SA-A
Report of February 16, 2026 Page 8 of 8
ERC_Report_Oasis_Academy_Center_260216_v1_FINAL
Mitigation Measures: No further mitigation is recommended.
Nexus: Not applicable.
10. Utilities
Impacts: The property is currently served by City of Renton water, sewer, and stormwater systems,
as well as by franchise utilities such as power and telecommunications. The change of use and
modest increase in occupancy associated with the daycare can be accommodated within existing
utility capacity, although side sewer CCTV, decommissioning of any existing septic system, and
minor system adjustments may be required through Development Engineering review. Existing and
proposed utility connections, locations of water, sewer, and storm lines, and on-site service
configurations are shown on the Utility Plan (Exhibit 13). Development Engineering conditions
regarding side sewer inspection, potential septic decommissioning, and any necessary utility
upgrades are included in the Advisory Notes (Exhibit 20). No new off-site utility extensions are
proposed, and no adverse utility impacts are anticipated.
Mitigation Measures: No further mitigation is recommended.
Nexus: Not applicable.
E. Comments of Reviewing Departments
The proposal has been circulated to City Department and Division Reviewers. Where applicable, their
comments have been incorporated into the text of this report and/or “Advisory Notes” to the applicant.
✓ Copies of all Review Comments are contained in the Official File and may be attached to this
report.
The Environmental Determination decision will become final if the decision is not appealed within the 14-
day appeal period (RCW 43.21.C.075(3); WAC 197-11-680).
Environmental Determination Appeal Process: Appeals of the environmental determination must be filed
in writing on or before 5:00 p.m. on March 2, 2026. Appeals must be submitted electronically to the City Clerk
at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal fee,
normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted
electronically. The appeal submitted in person may be paid on the first floor in our Finance Department. Appeals
to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process
may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov.
Docusign Envelope ID: FFB6F336-7B75-4DAC-8020-35E8974E808F
CITY OF RENTON
DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT
STAFF REPORT TO THE ENVIRONMENTAL REVIEW COMMITTEE
EXHIBITS
Project Name:
Oasis Academy Center
Land Use File Number:
LUA25-000195, ECF, SA-A
Date of Meeting
February 16, 2026
Staff Contact
Mariah Kerrihard
Associate Planner
Project Contact/Applicant
Cristhian Arcila,
Eleven Siding LLC,
2825 NE 4th Ct, Renton,
WA 98056
Project Location
4508 NE 4th St, Renton, WA
98059 (APN 1023059117)
The following exhibits are included with the ERC Report:
Exhibit 1:Environmental Review Committee (ERC) Report
Exhibit 2:Site Plan
Exhibit 3:Neighborhood Detail Map
Exhibit 4:SEPA Environmental Checklist, dated February 5, 2026
Exhibit 5:Project Narrative
Exhibit 6:Parking Analysis
Exhibit 7:Landscape Plan
Exhibit 8:Tree Retention and Tree Credit Worksheet
Exhibit 9:Wetland and Stream Study, prepared by Altman Oliver Associates, LLC, dated May
21, 2025
Exhibit 10:Transportation Concurrency Memorandum
Exhibit 11:Trip Generation Assessment, prepared by Health & Associates, dated March 5, 2025
Exhibit 12:Architectural Conceptual Rendering
Exhibit 13:Utility Plan
Exhibit 14:Technical Information Report
Exhibit 15:Septic Abandonment Report
Exhibit 16:Septic Decommissioning Report
Exhibit 17:Sewer Camera Inspection Report
Exhibit 18:Duwamish Tribe Comment Letter, dated July 15, 2025
Exhibit 19:Staff Response Email to Duwamish Tribe Comment Letter, dated July 16, 2025
Exhibit 20:Advisory Notes
Docusign Envelope ID: FFB6F336-7B75-4DAC-8020-35E8974E808F