Loading...
HomeMy WebLinkAboutR-4332039N co Xrefs: co xBRT-CUD05-T xS 1-BT120-CAP xS1-BT120-GZK 0 xS1-BT120-CZN xS1-BT120-VRX GB-SEAL-JKH5 xS1-BTP120-VS 0 GB-SEAL-LBR2 1 1 xS1-BT120-GZK xS1-BT120-CZN ®R CD N 0 N n Q 0 N m CD N coo co IZI- CD 0 0 U z 0 Q Z) 0 J Q C/) m Z ow U) m J 0 — U Q¢ C� z 66 Y 0 N j o >� o U GENERAL NOTES: 1. SEE SHEET BT120-CAP100 FOR ALIGNMENT PLAN AREA PLAN. 2. SEE SHEETS BT120-RPP101-RPP106 AND BT1 20-RPP201 -RPP205 FOR ALL EXISTING AND PROPOSED ROW. 3. SEE SHEET BT120-RMP501 FOR RIGHT-OF-WAY MONUMENTATION PLAN AND HORIZONTAL AND VERTICAL CONTROLS. 4. SEE SHEETS BT120-GZKO01 AND BT120-GZN001-GZN007 FOR GENERAL KEY PLAN, GENERAL ABBREVIATIONS, AND GENERAL SYMBOLS AND LEGEND. 1 06/13/2025 LBR DP I LBR ADDENDUM #1 0 12/10/2024 LBR LDG LBR ISSUED FOR BID No. DATE DSN CHK APP REVISION Ln 00 6 N co 11 n s 0 PT = N TC 514+15.39 1 — N TC 514+00 0 DESIGNED BY: L. REDMAN DRAWN BY: L. REDMAN CHECKED BY: L. GILBERT APPROVED BY: L. REDMAN S TC 615+00 I N TC 515+00 x CL BT120-C-N TC S890 42' 23"E I N TC 516+00 459.68' i NORTH DRIVEWAY I N TC 517+00 CL BT120-C-S TC I SOUTH DRIVEWAY SUBMITTED BY: 06/11 /2025 R. PARGAS _ S890 42' 23"E _ S TC 616+00 473.90, S TC 617+00 x x MATCHLINE: SEE DWG BT120-CAP204 QLu 4Sr)?IDE J IM)l U)_ co W J BRT General Engineering Consultant J LL SDUNDTRANSIT DATE: 12/10/2024 REVIEWED BY: J. ALTCHECH DATE: 12/10/2024 STC61 10 Q SW 7T4 I� u I 103 L I I I 102 201 107 202 106 _ 203 y 204 Q J Q 205 105 101 104 1 I1 GR DY WAY o CIO SCALE: 1 "=20' FILENAME: S 1-BT120-CAP201-204 CONTRACT No.: RTA/LR RTA/CN 0205 DATE: 12/10/2024 KEY MAP UPDATES TO ROW SEE SHEETS BT120-RPP101-BT120-RPP102 BT120-RPP105-BT120-RPP106 BT1 20-RPP201 -BT1 20-RPP205 N 20 10 0 20 40 SCALE IN FEET DEVELOPMENT ENGINEERING R-433239 msippo 11 /25/2025 STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 CIVIL ALIGNMENT PLAN S RENTON TRANSIT CENTER F9:_ I ► ►• BT120-CAP202 FACILITY ID: BT120 SHEET No.: REV: 039 1 C'7 N T N O O N CU co O O O N Q J