Loading...
HomeMy WebLinkAboutR-4332044N C'7 Xrefs: M xBRT-CUD05-T xS1-BT120-CRY O 0 w _o 0 ry U 0 N m 'o N co IZT 0 z w U) X w i w z w m c/) U) } 00 -O U �a N z N Y �o N a o U R/W EX 8.0' EX 5.0' SIDEWALK PLANTER - L EX 13.0' TURN LANE EX 0.5' CURB GENERAL NOTES: 1. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET. 2. SEE SHEETS BT120-RPP101-RPP107 AND BT120-RPP201-RPP205 FOR RIGHT-OF-WAY PLANS. 3. SEE SHEETS BT120-CAP101-CAP107 AND BT120-CAP201-CAP204 FOR ALIGNMENT PLANS. 4. SEE SHEETS BT120-CSP101-CSP107 AND BT120-CSP201-CSP205 FOR SITE PREPARATION PLANS. 5. SEE SHEETS BT120-CPP101-CPP106 AND BT120-CPP201-CPP205 FOR PAVING PLANS. 6. SEE SHEETS BT120-GKZ001 AND BT120-GZN001-GZN007 FOR GENERAL KEY PLAN, GENERAL ABBREVIATIONS, AND GENERAL SYMBOLS AND LEGEND. 1 06/13/2025 LBR DP I LBR ADDENDUM #1 12/10/2024 LBR LDG LBR ISSUED FORBID L0 No. DATE I DSN I CHK I APP I REVISION R/W EX PLANTER LEGEND*: EX 11.0' THRU LANE EX ROADWAY SURFACE EX11.1'-12.3' THRU LANE MATCH EXISTING DEPTHS ON ALL SAWCUTS (TYP) 1 G RID (TYP) - CONSTRUCTION GEOTEXTILE FOR SEPARATION (TYP) 123.06' - 128.10' R/W CL 13.0'- 0' BUS ONLY LANE I 0.5' CURB MATCH EX imam][®EW 0' - 13.0' 11.9' LEFT TURN LANE THRU LANE 0.0' - 17.0' MEDIAN & LSCP 0.5' CURB 11.0' -12.5" THRU LANE I 1 3.0 �°► I I 13.2' BUSINESS ACCESS AND TRANSIT LANE R/W VARIES SIDEWALK 0.5' CURB 1.5% -.N*- 9 31 2 19 GEOGRID (TYP) 6 CONSTRUCTION GEOTEXTILE FOR SEPARATION (TYP) I EX 0' - 13.0' EX 11.9' EX 11.0' -12.5" EX 13.2' EX 8.0' LEFT TURN LANE THRU LANE THRU LANE BAT LANE SIDEWALK D EX 0.5' CURB EX ROADWAY SURFACE 1 STA 20e�O STA 210+85.35 RAINIER AVE S TYPICAL SECTION RAINIER STA 207+76.56 - STA 210+85.35 HARDIE CL 72.00' - 224.9' R/W 0' - 15.0' 24.0' TO 26.1' 0.0' - 71.4' 24.0' 15.0' TO 25.0' SIDEWALK THRU LANE MEDIAN PLANTER TURN LANE SIDEWALK 0.5' 0.5' 0.5' 0.5' CURB CURB CURB CURB 0' - 11.3' 0' - 10.0' 2 0' 1.5% 2.0' 0°�0 0 -.5 �o �- 2.0 /o R/W EX PLANTER MATCH EXISTING 14 16 U20 DEPTHS ON ALL SAWCUTS (TYP) 5 3 33 9 20 16 GEOGRID (TYP) GEOGRID (TYP) 20 9 33 8 33 9 16 20 16 9 133 5 3 CONSTRUCTION CONSTRUCTION 1 GEOTEXTILE FOR 1 1 GEOTEXTILE FOR 1 SEPARATION (TYP) SEPARATION (TYP) EX 7.5' EX 8.0' PLANTER SIDEWALK HARDIE AVE SW TYPICAL SECTION L_ HARDIE STA 308+79.37 - 309+57.64 - - HARDIE STA 308+79.37 - STA 309+21.25 CRUSHED SURFACING TOP COURSE PLANTER STRIP ® CRUSHED SURFACING BASE COURSE HARDSCAPE SEE SHEETS GZN006 - GZN007 FOR * GENERAL SYMBOLS AND LEGEND - - GEOGRID CONSTRUCTION GEOTEXTILE FOR SEPARATION DESIGNED BY: L. REDMAN DRAWN BY: Y. SHEN L , 2202570819 s cISTEg� CHECKED BY: D. POSTEN CONSTRUCTION NOTES: 02 10 IN HMA CL 1/2 IN PG 58H-22 30 CEMENT CONC SIDEWALK PER CITY OF RENTON STD PLAN 102 O4 IN CRUSHED SURFACING TOP COURSE 66 CEMENT CONC TRAFFIC CURB AND GUTTER PER WSDOT STD PLAN F-10.12 80 SEE SHEETS BT120-LPP101-LPP106 AND BT120-LPP201-LPP205 FOR LANDSCAPE PLANTING PLAN APPROVED BY: ZONAL - SUBMITTED BY: L. REDMAN 06/11 /2025 R. PARGAS O6 IN CRUSHED SURFACING BASE COURSE 10 10 IN CEMENT CONC PAVEMENT 14 PLANING BITUMINOUS PAVEMENT AND HMA CL 1/2 IN PG 58H-22 OVERLAY 16 8 IN HMA CL 1/2 IN PG 58H-22 19 10 IN CRUSHED SURFACING BASE COURSE 20 12 IN CRUSHED SURFACING BASE COURSE 4,5rRIDE BRT General Engineering Consultant DATE: REVIEWED BY: 12/10/2024 J. ALTCHECH EX 0.5' CURB 31 CEMENT CONC TRAFFIC CURB PER WSDOT STD PLAN F-10.12 33 CEMENT CONC TRAFFIC CURB AND GUTTER PER CITY OF RENTON STD PLAN 101 SCALE: NTS Q J FILENAME: Q U co U) w J S1-BT120-CRY101-106 z w SOUNDTRANSIT CONTRACT No.: RTA/CN 0205-24 DATE: DATE: 12/10/2024 12/10/2024 STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 CIVIL TYPICAL SECTIONS RAINIER AVE S AND HARDIE AVE SW R-433244 DEVELOPMENT ENGINEERING msippo 11 /25/2025 DRAWING No.: BT120-CRY102 FACILITY ID: BT120 SHEET No.: REV: 044 1 C'7 N T N O O N CU H H H N d C'7 C'7 N O O O N Q J