Loading...
HomeMy WebLinkAboutR-4332046N C'7 Xrefs: M xBRT-CUD05-T xS1-BT120-CRY O I w c� 0 0 0 ry U 6 N m 'o N CO co IZT 0 z w X w i w z w m ct) U) } EO -O U �a CO Q N z N Y �o N a o U VARIES GENERAL NOTES: 8.0' PLANTER 1. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET. 2. SEE SHEETS BT120-RPP101-RPP107 AND BT120-RPP201-RPP205 FOR RIGHT-OF-WAY PLANS. 3. SEE SHEETS BT1 20-CAP1 01 -CAP1 07 AND BT1 20-CAP201 -CAP204 FOR ALIGNMENT PLANS. 4. SEE SHEETS BT120-CSP101-CSP107 AND BT120-CSP201-CSP205 FOR SITE PREPARATION PLANS. 5. SEE SHEETS BT120-CPP101-CPP106 AND BT120-CPP201-CPP205 FOR PAVING PLANS. 6. SEE SHEETS BT120-GKZ001 AND BT120-GZN001-GZN007 FOR GENERAL KEY PLAN, GENERAL ABBREVIATIONS, AND GENERAL SYMBOLS AND LEGEND. 1 06/13/2025 LBR DP I LBR ADDENDUM #1 12/10/2024 LBR LDG LBR ISSUED FORBID L0 No. DATE DSN CHK I APP REVISION R/W 16.0' MULTI -PURPOSE PATH 1.5% 13) (12 LEGEND*: 0'-10.0' PLANTER EX 0.5' CURB 50.0' R/W 11.0' THRU LANE 1.5% I I MATCH EX EX 0.5' CURB �L L_ S i I I I 0.5' CURB I I I 33 1 9 1 0.5' CURB I i � 33 CRUSHED SURFACING TOP COURSE PLANTER STRIP ® CRUSHED SURFACING BASE COURSE HARD CAPE SEE SHEETS GZN006 - GZN007 FOR * GENERAL SYMBOLS AND LEGEND - - GEOGRID CONSTRUCTION GEOTEXTILE FOR SEPARATION DESIGNED BY: L. REDMAN oyTH DRAWN BY: Y. SHEN L , 22025708 9 °���s GIsTE� � CHECKED BY: D. POSTEN 1 ) ( 9 EX 11.0' THRU LANE 11.0' THRU LANE 11.0' THRU LANE EX0'-4.0' GORE MATCH EX ..4: .. ': �'•. �?a ... .. ._ .•..I �, '••tip• .:R •'• I GEOGRID (TYP) 1 i CONSTRUCTION GEOTEXTILE FOR SEPARATION (TYP) I 11.0' THRU LANE MATCH EX CL EX0'-11.0' TURN LANE I EX0'-10.5' TURN LANE EX ROADWAY SURFACE GRADY STA 150+91.42 TO STA 151+35.54 GRADY STA 152+01.45 TO STA 152+78.71 GRADY STA 153+33.82 TO STA 154+00.03 GRADY STA 154+43.88 TO STA 154+87.94 GRADY STA 155+77.39 TO STA 155+86.56 I 11.0' GEOGRID (TYP) THRU LANE CONSTRUCTION GEOTEXTILE MATCH EX FOR SEPARATION (TYP) GRADY STA 151+35.54 TO STA 152+01.45 • •. •' :.i•i ..'•:.. .4 '.i t t.y y n EX 11.0' THRU LANE 11.0' THRU LANE GRADY STA 153+22.84 TO STA 153+33.82 GRADY STA 154+32.98 TO STA 154+43.88 GRADY STA 154+87.94 TO STA 155+20.96 1 9 1 GRADY STA 155+53.91 TO STA 155+65.09 11.0 1 GEOGRID (TYP) 1 THRU LANE CONSTRUCTION GEOTEXTILE MATCH EX FOR SEPARATION (TYP) • GRADY STA 152+78.71 TO STA 153+22.85 GRADY STA 154+00.03 TO STA 154+32.98 GRADY STA 155+20.96 TO STA 155+43.00 GRADY STA 155+65.09 TO STA 155+77.39 1 9 1 GEOGRID (TYP) 11.0' i THRU LANE CONSTRUCTION GEOTEXTILE FOR SEPARATION (TYP) MATCH EX GRADY STA 150+80.43 TO STA 150+91.42 �Gk �YA CAL CTIO A 150+91.42 - STA 155+86.56 GEOGRID (TYP) 1 CONSTRUCTION GEOTEXTILE FOR SEPARATION (TYP) CONSTRUCTION NOTES: 012 IN CEMENT CONC PAVEMENT OR MATCH EXISTING, WHICHEVER IS GREATER 08 SEE SHEETS BT120-LPP101-LPP106 AND BT120-LPP201-LPP205 FOR LANDSCAPE PLANTING PLAN O6 IN CRUSHED SURFACING BASE COURSE 12 5 IN HMA CL 1/2 IN PG 58H-22 13 8 IN CRUSHED SURFACING BASE COURSE APPROVED BY: ZONAL - SUBMITTED BY: L. REDMAN 06/11 /2025 IR.PARGAS 50.0' R/W EX 10.5' THRU LANE EX 1.0' CURB 0.5' CURB 11.0' THRU LANE 33 CEMENT CONC TRAFFIC CURB AND GUTTER PER CITY OF RENTON STD PLAN 101 4S rRIDE BRT General Engineering Consultant 1DATE: REVIEWED BY: 12/10/2024 J. ALTCHECH EX 11.0' THRU LANE SCALE: NTS Q J Q U FILENAME: 0 � w J S1-BT120-CRY101-106 z w SOUNDTRANSIT CONTRACT No.: RTA/CN 0205-24 DATE: 1DATE: 12/10/2024 12/10/2024 EX 0.5' CURB R/W EX 5.0' SIDEWALK EX PLANTER CL EX0'-4.0' GORE 11.0' THRU LANE EX0'-11.0' TURN LANE GEOGRID (TYP) CONSTRUCTION GEOTEXTILE FOR SEPARATION (TYP) STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 CIVIL TYPICAL SECTIONS GRADY WAY R-433246 DEVELOPMENT ENGINEERING msippo 11 /25/2025 DRAWING No.: BT120-CRY104 FACILITY ID: BT120 SHEET No.: REV: 046 1 H H H N rr C'7 C'7 O O O I N Q J