Loading...
HomeMy WebLinkAboutR-4332048N C'7 Xrefs: M xBRT-CUD05-T xS1-BT120-CRY It O 0 LU IU A co 0 0 U 0 N m 0 N M IZI- 0 z w w I w Z °6 w m = I � co } 0� O � Q co Z_ co Y Lo >O N a_ o U R/W I SEE ARCHITECTURAL SHEET BT120-ASP201 FOR PROPOSED WORK HERE GEOGRID (TYP) CONSTRUCTION GEOTEXTILE FOR SEPARATION (TYP) EX SURFACE GENERAL NOTES: 38.0' - 42.8' R/W 8.0' 8.0' SIDEWALK PLANTER 0.5' CURB 5) l31 l81 33 1 ly VARIES RAINIER AND LAKE DRIVEWAY CL I 15.0' - 18.0' THRU LANE U 2 I Q GEOGRID (TYP) CONSTRUCTION GEOTEXTILE FOR SEPARATION (TYP) VARIES EG 0 SEE NOTE 7 GEOGRID (TYP) 12 13 CONSTRUCTION GEOTEXTILE LAKE STA 401+63.00 TO STA 402+15.00 FOR SEPARATION (TYP) R/W I 4"* L YPICAL SECTION 1 AKE STA 400+27.05 STA 402+78.45 38.1' - 78.8' CL R/W _ 3.0' 8.0' HARDSCAPE SIDEWALK 1.5% 13) (12 u 21.0' - 30.5' THRU LANE 0.0' - 17.2' THRU LANE EX 0' - 14.8' TURN LANE EX 0.5' CURB EX SURFACE rT__ - ZJJ 0.5' CURB EX SURFACE LAKE STA 402+20.57 TO STA 402+30.19 0.5' 1 LAKE STA 402+38.39 TO STA 402+41.30 CURB 1 8.0' SIDEWALK I 1 MATCH EX I -am- 1 3 LAKE STA 402+30.19 TO STA 402+38.39 16.7' - 22.6' THRU LANE 0.5' 0.5' CURB CURB 2.0% 1 2.0% 2.0% ... �-.......... .......... .................. 7= ................... 1 GEOGRID (TYP) 5 34 3 9 33 2 19 I CONSTRUCTION GEOTEXTILE FOR SEPARATION (TYP) i 4H'.�v �9) \ 3 CL VARIES 15.0' - 28.2 ' TRANSIT CENTER THRU LANE MATCH TRANSIT CENTERI VARIES 2.0% 24 �9 GEOGRID (TYP) CONSTRUCTION GEOTEXTILE FOR SEPARATION (TYP) 14.5' THRU LANE 2.0% 24 14.8' - 18.4' THRU LANE 11 EX VARIES SIDEWALK 0.5' CURB 0.5' CURB GEOGRID (TYP) CONSTRUCTION GEOTEXTILE FOR SEPARATION (TYP) LAKE STA 404+06.93 TO STA 404+31.66 LAKE AVE S TYPICAL SECTION VARIES PLANTER 0.5' CURB LAKE STA 402+78.45 - STA 404+31.66 12.0' THRU LANE CL 12.0' THRU LANE 1.5% �- 2.0% 2.0% I EG 8 33 j 12 13 I VARIES 0.5' VARIES 0' - 6.3' 1 0.5' SEE NOTE 7 BUS LAYOVER BAY CURB SIDEWALK PLANTER CURB GEOGRID (TYP) VARIES CONSTRUCTION GEOTEXTILE FOR SEPARATION (TYP) GEOGRID (TYP) I I 0 1 1 33 EG CONSTRUCTION I SEE NOTE 7 GEOTEXTILE FOR 24 9 11 3 5 8 33 1 GEOGRID (TYP) SEPARATION (TYP) CONSTRUCTION GEOTEXTILE FOR SEPARATION (TYP) RAILAKDW STA 716+00.00 TO STA 717+02.65 I I VARIES BUS LAYOVER BAY I VARIES 0.5' CURB VARIES PLANTER 1.5% - 2.5% VARIES TURNAROUND 1.3% 0 12 13 GEOGRID (TYP) CONSTRUCTION GEOTEXTILE FOR SEPARATION (TYP) RAILAKDW STA 718+27.00 TO STA 719+02.19 LAKE STA 404+91.15 TO STA 405+04.12 -' 1. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET. 2. SEE SHEETS BT120-RPP101-RPP107 AND LAKE AVE S TYPICAL SECTION o 24 9 GEOGRID (TYP) EG BT120-RPP201-RPP205 FOR RIGHT-OF-WAY PLANS. LAKE STA 404+31.66 - STA 405+04.12 SEE NOTE 7 RAINIER AND LAKE DRIVEWAYS RAILAKDW STA 717+02.65 TO STA 717+28.45 CONSTRUCTION GEOTEXTILE 3. SEE SHEETS BT1 20-CAP1 01 -CAP1 07 AND TYPICAL SECTION FOR SEPARATION (TYP) BT1 20-CAP201 -CAP204 FOR ALIGNMENT PLANS. LEGEND*: RAILAKDW STA 716+00.00 -STA 722+12.25 4. SEE SHEETS BT120-CSP101-CSP107 AND CRUSHED SURFACING TOP COURSE CONSTRUCTION NOTES: BT120-CSP201-CSP205 FOR SITE PREPARATION PLANS. PLANTER STRIP 20 10 IN HMA CL 1/2 IN PG 58H-22 11 DOWELED CURB PER KCM STD 33 CEMENT CONC TRAFFIC CURB AND GUTTER PER 5. SEE SHEETS BT120-CPP101-CPP106 AND PLAN D109 CITY OF RENTON STD PLAN 101 BT120-CPP201-CPP205 FOR PAVING PLANS. CRUSHED SURFACING BASE COURSE 30 CEMENT CONC SIDEWALK PER CITY OF RENTON STD PLAN 102 12 5 IN HMA CL 1/2 IN PG 58H-22 34 HARDSCAPE. SEE SHEETS BT120-LHD101-LHD109 6. SEE SHEETS BT120-GKZ001 AND BT120-GZN001-GZN007 FOR HARDSCAPE FOR HARDSCAPE PLAN AND DETAILS GENERAL KEY PLAN, GENERAL ABBREVIATIONS, AND O 4 IN CRUSHED SURFACING TOP COURSE 13 8 IN CRUSHED SURFACING BASE COURSE GENERAL SYMBOLS AND LEGEND. SEE SHEETS GZN006 - GZN007 FOR * GENERAL SYMBOLS AND LEGEND 80 SEE SHEETS BT120-LPP101-LPP106 AND 14 PLANING BITUMINOUS PAVEMENT AND HMA CL 7. EXCAVATE AND DISPOSE OF OFFSITE THE TOP 1 FOOT OF BT120-LPP201-LPP205 FOR LANDSCAPE 1/2 IN PG 58H-22 OVERLAY EXISTING MATERIAL IN ACCORDANCE WITH LOCAL AND - - GEOGRID PLANTING PLAN R-433248 STATE REQUIREMENTS. SCARIFY AND RECOMPACT THE 19 10 IN CRUSHED SURFACING BASE COURSE NEWLY EXPOSED MATERIAL AN ADDITIONAL DEPTH OF 1 CONSTRUCTION GEOTEXTILE O 6 IN CRUSHED SURFACING BASE COURSE DEVELOPMENT ENGINEERING ' FOOT THEN PERFORM REMAINING EARTHWORK FOR SEPARATION 24 12.5 IN CEMENT CONC PAVEMENT OPERATIONS TO CONSTRUCT THE SUBGRADE. msippo 11/25/2025 DESIGNED BY: SCALE: STRIDE BUS RAPID TRANSIT DRAWING No.: L. REDMAN ��T H R�'Ij w NTS DRAWN BY: w wasf�r� Q < FILENAME: SOUTH RENTON TRANSIT CENTER BT120-CRY106 c Y. SHEN �� z w S1-BT120-CRY101-106 BT105 FACILITY ID: CHECKED BY:®tea, w� BRT General Engineering Consultant rJ?IDE z " SOUNDTRANSIT CONTRACT No.: CIVIL BT120 zzozs�oa 1 06/13/2025 LBR DP LBR ADDENDUM #1 D. POSTEN ��GrsTE¢�o � RTA/CN 0205-24 SHEET No.: REV: 0 12/10/2024 LBR LDG LBR ISSUED FOR BID APPROVED BY: ��sIONAL � SUBMITTED BY: DATE: REVIEWED BY: DATE: DATE: TYPICAL SECTIONS LAKE AVE S AND RAINIER AND LAKE DRIVEWAY 048 1 No. DATE DSN CHK APP REVISION L. REDMAN 06/11/2025 R. PARGAS 12/10/2024 J. ALTCHECH 19/10/2024 12/10/2024 m N T N O O N CU LO O O O T co co O O O N Q J