HomeMy WebLinkAboutR-4332051co
Xrefs:
co
xS1-BT120-VRX
xS1-BTP120-VS
xS1-BT120-CPP
O
xBRT-CUD05-T
xS1-BTP120-GZ
xS1-BT120-CAP
xS1-BT120-CMP
0
xS1-BT120-CTP
1 1
xS1-BT120-CTN
GB-SEAL-SS56
I'--
xS 1-BT120-CD P
xS1-BT120-RPP001
xS1-BT120-CZN002
®R
0
0
6
N
m
co
0
N
It
0
0
O
z
J
U)
z
O
z
O
m
U�
Y
U U)j
U) m
y
w
U) m
— O
U
Q Q
N (�
z
Y
O>
N
o
o U
OEXIST. CB NOT SHOWN IN VIEWPORT.
APPROX. LOCATION AT STA 308+25.7, 23.0' RT
\
s 1^
l000
N4.,! pP c mod''/
/ S
FO
N
C
\ fY
3 � � /s° W � Q-A N c' P� �
�Ao
� cs`
c9 O
\ 0
-o SS /
100
101,
CD f1'$ , 0' EX ROW `�; �� co
O SIG / / ,
- 1" pP g; Q �
ELE
('l Q EX ROW iT E —� DP 48 DP� ♦ �` a r
"D _ 5' D 5'9" DP 51101, DP ' 5R„ � DP
/ F / -t — 2" D 3 5" DP ►� 3 3' G F Z
0 m �' HH 1-4 �-� — 32„ �fp 01_ - AS- - — FO — _
Q / i / ` p �p"u C HH U 9 "' DP 3 9" _ — — F = = = ` FO — ` pwft
= 'A -wo z S TC 609+53 _ (�
21r� / ss� ��' - w►-►'�D'� o�m G sw W
_ _ oo -o m A
V / �J _ r RTpN \ of o
uj
�� f=i E__---E ��+ - N m� RA/N/ER AVE $� I W
`� — — — vn-12"� s 1 ` 2 m
i z—rAr
- , Im r s
mm mm� / ' �m m� S TC 6 0+00
o N TC 510+00 �,
N + m N -A �� N Cn 4
_--Nc3�
of �'� �Z -- �Z m r� GV
11
76
RAINIER 206+00 LA DS�HrIIV
_ � m
'� _� I 1 I �Z
RAINIER 205+00 0ll S TC STA 610+02.99 A/
= RAINIER STA 206+67.81 N ���\ N TC STA 510+04.91 R 20 +00
RAINIER STA 207+16.93
GENERAL NOTES:
Z
A
I O?
KEY NOTES:
N Nz m 'IN \= � �zmm N o �m RAINIER 207+00 o No
w N p-I � � � � Z m
p T I' 92"b
,3WV
MATCHLINE: MATCHLINE:
SEE DWG BT120-CTP203 SEE DWG BT120-CTP201
1
1. CONTRACTOR SHALL MAINTAIN AND ADJUST O1 WHERE CURB INLETS ARE PRESENT, INSTALL INLET LEGEND:
TEMPORARY EROSION AND SEDIMENT CONTROL PROTECTION PER COR STD PLAN 216.30 AND PLACE SANDBAGS
(TESC), AS NEEDED. BARRIER UPSTREAM OF CATCH BASIN PER COR STD. PLAN INLET PROTECTION
2. PROTECT EXISTING TREES AND SHRUBS UNLESS 216.50. SEE DRAWING BT120-CTD102 AND BT120-CTD103 FOR
NOTED FOR REMOVAL. FOR SITE PREPARATION DETAILS. SF SF SILT FENCE
PLANS, SEE DRAWINGS BT120-CSP101-106, AND `
BT120-CSP201-205. O2 INSTALL INLET PROTECTION PER COR STD PLAN 216.30. SEE COMPOST SOCK
3. PROTECT EXISTING DRAINAGE STRUCTURES SUCH DRAWING BT120-CTD102 FOR DETAILS.
AS CATCH BASINS, MANHOLES AND PIPES UNLESS CONSTRUCTION FENCE
NOTED FOR REMOVAL. SEE DRAWINGS 103 1
UPDATES TO ROW
BT120-CSP101-106, AND BT120-CSP201-205. O4 INSTALL COMPOST SOCK PER WSDOT STD PLAN 1-30.40-02. STABILIZED CONSTRUCTION ENTRANCE SEE SHEETS
4. FOR DRAINAGE PLANS, SEE DRAWINGS WHEN COMPOST SOCKS ARE USED ON PAVEMENT, HEAVY BT120-RPP101-BT120-RPP102
BT120-CDP101-106, AND BT120-CDP201-205. CONCRETE BLOCKS SHALL BE USED TO PREVENT THE
5. CLEARING LIMITS IN LANDSCAPING AREAS WITHIN BT120-RPP105-BT120-RPP106
COMPOST SOCK FROM MOVING DURING RAINFALL/RUNOFF ' �' �' �' �' �' �' �' �' �' �' � CONCRETE WASHOUT AREA 102 201 � � � 107
BT1 20-RPP201 -BT1 20-RPP205
THE PROJECT LIMITS SHALL BE DELINEATED WITH EVENTS. z� _ 202 _� 106
SILT FENCE INSTALLED AT A 2-FOOT OFFSET FROM
203
THE INSIDE OF THE CHAIN LINK FENCE EXCEPT AT 204
DRIVEWAY AND SIDEWALK LOCATIONS. 205 - /• I 105,
6. AT A MINIMUM, DISTURBED AREAS SHALL BE
SODDED OR SEEDED AND MULCHED TO ENSURE 101 104
THAT SUFFICIENT COVER WILL DEVELOP SHORTLY
AFTER FINAL APPROVAL. S OVA
7. USE WSDOT STANDARD SPECIFICATIONS UNLESS
20 10 0 20 40
OTHERWISE NOTED.
8. AN ADMINISTRATIVE ORDER WAS ISSUED WITH THE
NPDES CONSTRUCTION PERMIT FOR THE PROJECT. KEY MAP SCALE IN FEET
STORMWATER TREATMENT AND SAMPLING IS 0
REQUIRED AS PART OF THE PERMIT. SEE NPDES R-433251DEVELOPMENT ENGINEERING
PERMIT WAR314062 FOR DETAILS. msippo 11/25/2025
DESIGNED BY: SCALE: DRAWING No.:
S. SRIDHARAN � SRI Q J 1"-20' STRIDE BUS RAPID TRANSIT
BT120-CTP102
DRAWN BY: y� : U FILENAME: SOUTH RENTON TRANSIT CENTER
ti p U) c/)
H. ONG � �,.�,, TED w S1-BT120-CTP101-106 BT105 FACILITY ID:
INCCHECKED BY: lo d BRT General Engineering Consultant � LL SovN�TRaNs�r CONTRACT No.: BT120
1 06/13/225 SS RP SS ADDENDUM #1 R. PARISH°�� SST CIVIL �° ��w� RTA/CN 0205-24 SHEET No.: REV:
I ��� TESC PLAN
0 12/10/2024 SS RP SS ISSUED FOR BID APPROVED BY: AL SUBMITTED BY: DATE: REVIEWED BY: DATE: DATE: 051 1
No. DATE DSN CHK APP REVISION S. SRIDHARAN 6 9 2025 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 RAI N ER STA 204+00 TO RAINIER STA 208+50
co
T
O
N
U
co
O
O
i
N
Q
J