Loading...
HomeMy WebLinkAboutR-4332054N co Xrefs: co xS1-BT120-VRX xS1-BTP120-VS xS1-BT120-CPP 0 xBRT-CUD05-T xS1-BTP120-GZ xS1-BT120-CAP xS1-BT120-CMP 0 xS1-BT120-CTP 1 1 xS1-BT120-CTN ui GB-SEAL-SS56 xS 1-BT120-CD P xS1-BT120-RPP001 xS1-BT120-CZN002 ®R c� 0 0 0 N m 0 N 0 0 0 c� z J U) z 0 z Ir m Y (D U) clf) m y Q w U) m —o U Q¢ co z Y N 0 1 0 o o U No. J W = W F- Q GENERAL NOTES: 1. CONTRACTOR SHALL MAINTAIN AND ADJUST TEMPORARY EROSION AND SEDIMENT CONTROL (TESC), AS NEEDED. 2. PROTECT EXISTING TREES AND SHRUBS UNLESS NOTED FOR REMOVAL. FOR SITE PREPARATION PLANS, SEE DRAWINGS BT120-CSP101-106, AND BT120-CSP201-205. 3. PROTECT EXISTING DRAINAGE STRUCTURES SUCH AS CATCH BASINS, MANHOLES AND PIPES UNLESS NOTED FOR REMOVAL. SEE DRAWINGS BT120-CSP101-106, AND BT120-CSP201-205. 4. FOR DRAINAGE PLANS, SEE DRAWINGS BT120-CDP101-106, AND BT120-CDP201-205. 5. CLEARING LIMITS IN LANDSCAPING AREAS WITHIN THE PROJECT LIMITS SHALL BE DELINEATED WITH SILT FENCE INSTALLED AT A 2-FOOT OFFSET FROM THE INSIDE OF THE CHAIN LINK FENCE EXCEPT AT DRIVEWAY AND SIDEWALK LOCATIONS. 6. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. 7. USE WSDOT STANDARD SPECIFICATIONS UNLESS OTHERWISE NOTED. 8. AN ADMINISTRATIVE ORDER WAS ISSUED WITH THE NPDES CONSTRUCTION PERMIT FOR THE PROJECT. STORMWATER TREATMENT AND SAMPLING IS REQUIRED AS PART OF THE PERMIT. SEE NPDES PERMIT WAR314062 FOR DETAILS. 06/13/2025 SS RP SS ADDENDUM #1 12/10/2024 SS RP SS ISSUED FOR BID DATE DSN CHK APP REVISION KEY NOTES: O2 INSTALL INLET PROTECTION PER COR STD PLAN 216.30. SEE DRAWING BT120-CTD102 FOR DETAILS. O3 INSTALL SILT FENCE PER COR STD PLAN 214.00 O7 INSTALL CONSTRUCTION FENCE - 6 FOOT HIGH CHAIN LINK FENCE WITH BLUE FABRIC MESH AND SOUND TRANSIT LOGO. OCONSTRUCTION RUNOFF TO BE CONVEYED TO A CONTRACTOR DESIGNED STORAGE/TREATMENT SYSTEM, WHICH MAY INCLUDE TEMPORARY SURFACE WATER DETENTION VAULT AND TEMPORARY SEDIMENT POND/TANKS. TEMPORARY DITCHES MAY BE MOSTLY USED DUE TO SITE TOPOGRAPHY, BUT TEMPORARY CATCH BASINS AND STORM DRAINS MAY BE ADDED WHERE NECESSARY. DISCHARGE TO NEAREST PERMITTED DISCHARGE LOCATION WHEN STORMWATER MEETS PROJECT PERMIT REQUIREMENTS. NOTE THAT THESE TESC MEASURES WILL BE COVERED WITHIN THE CONTRACTOR'S MEANS AND METHODS AND THE CONTRACTOR WILL EMPLOY THE APPROPRIATE METHODOLOGY BASED ON SITE STAGING AND PROVIDE UPDATES TO THE SWPPP AS REQUIRED. DESIGNED BY: S. SRIDHARAN DRAWN BY: H. ONG CHECKED BY: R. PARISH APPROVED BY: S. SRIDHARAN #_ SUBMITTED BY: 6-9-2025 R. PARGAS MATCHLINE: LAKE STA 401+50 SEE DWG BT120-CTP106 I I OqD 2-PSE r L r � GND R,61 D41T_ /5/7jP A7_3 .5'TwOh'O, C'9NDSCgP/NG DID A/OT SF/V O / - S r r r r c�0 i / / cROsstvAl � r i r R/44 ZS,13 NEED] TRA, ,,,/C,CONTR OZ 50 i O� S —E� 2-PSE B,XAPE /E /2„RCPI RC WA7 2/ PA ,DY 159+00 50 �E"°EGRADY 160+00 GRADY 160+46 ll 12 RCP N /E12„RCP E 211 --21. . 210 FO — — — FO '7BO ---�FO — — — — Fig)— --T FO--- FO T 1g8 — FO — — — — FO — — — — FO — — — — FO --- FO — — — — FC 1 / O 2-Z4 Y0 FO ----IFO ---� FO —7— FO --- FO --- FO — — — — FO — — — — FO — — — FO — — — — FC / /--i-- FO — — — FO — — — — FC / O —FO— —FO FO — — J- — FO — — — — FO — CENTUR�S�IK FO — — — 9/ svv ,6„58'_DP 48"DP su-3DP —__E-----E--- ��3;,OT 49-DP: II'DP -- "�P— �� S rMH of -P 5'8 D FO -- FO — 12 OP FO00 KEY NOTES: 10 POTENTIAL TEMPORARY SEDIMENT STORAGE TANKS AND STORMWATER TREATMENT SYSTEM SET-UP AREA. CONTRACTOR TO FIELD LOCATE AS NECESSARY, USE THIS SYSTEM PRIOR TO WATER QUALITY FACILITY CONSTRUCTION OR IN CONJUNCTION WITH TEMPORARY SURFACE WATER DETENTION VAULT TO MEET THE SITE FLOW AND WATER QUALITY PERMIT DISCHARGE REQUIREMENTS. CONTRACTOR SHALL DETERMINE NUMBER OF TANKS REQUIRED BASED ON STAGING. SEE CONSTRUCTION STORMWATER VOLUMES AND FLOW RATES TABLE ON DRAWING BT120-CTN-101. LEGEND: SF ❑ INLET PROTECTION SF SILT FENCE ''i"-'i---i'--i---i--i'�-i'�-i'�-i--i'�-i'�-i-�i •-pilllllilib • CONSTRUCTION FENCE STABILIZED CONSTRUCTION ENTRANCE CONCRETE WASHOUT AREA SCALE: J 1 "=20' Q Q FILENAME: 4S w J S1-BT120-CTP101-106 BRT General Engineering Consultant J LL SDUNDTRANSIT CONTRACT No.: RTA/CN 0205-24 DATE: REVIEWED BY: DATE: DATE: 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 KEY MAP UPDATES TO ROW SEE SHEETS BT120-RPP101-BT120-RPP102 BT120-RPP105-BT120-RPP106 BT1 20-RPP201 -BT1 20-RPP205 20 10 0 20 40 SCALE IN FEET R-43=3254DEVELOPMENT ENGINEERING msippo 11 /25/2025 DRAWING No STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 CIVIL TESC PLAN GRADY STA 156+50 TO GRADY STA 160+46.15 BT120-CTP105 FACILITY ID: BT120 SHEET No.: REV: 054 1 C'7 N T N 0 N CU co 0 0 i 4 N Q J