HomeMy WebLinkAboutR-43320909
Xrefs: (�
xS1-BT120-CPP0
xS1-BT120-VRXO
xS1-BT120-CZN0 O
xBRT-CUD05-TB
xS1-BT120-CAPO
xS1-BT120-CPP0 Q
xS1-BTP120-VSF I ' '
xS1-BT120-GZK0 iW
xS1-BT120-GZK
xS1-BT120-LHP0
xS1-BT120-CZN0
xS1-BT120-CRP001
LO
0
N
0
N
a
w
0
N
m
0
N
M
0
0
J
z
0
w
X
w
I
C�
Z
a �
� m
� I
w �
_jm
_o
o z A
2
0 1
L
N 0
o
U No
CV
O
a
a
Uj v
_zo
J CV
V IW
W
W
c
SEE NOTE 7
1 '�
BT120-CRD 119
��
213 �/ 212 195
187
an
R=10.0':
k k k k X k k k k k
17)
I U
R=15.0
k 178
k k
0'
215
k k
188
k k k k
182 R=3.0' 173
105
106 39 9
n
Do
0
19 194 k
k
k R=10 0'
k k
k k 36
k 174 19
R=3.0'
° R=43.0'
y%
2
k
k.
k k k 216 k
k
k k k
185
k 172
251
108
G
104
k k k k
230 k k k R=3.0' 19
183 179 171
180
:0 107
v
214 k k kk kk
k k
19 0
184
103
Q.
�L
k k
k k
k 1 9 2
3 6
R-50.0 ..
a..
1 7
I
k k
2 24 k k 21 7
k k
R- 3. 0
1.
8 9
-
R-3. o
109
k k 1 91
k k
250
.
••
k k
k k k
k k
k k 218
k k .
1 9
1 9 .a
k k
k k
GENERAL NOTES:
KEY NOTES:
MATCHLINE:
SEE DWG BT120-CPP205
1. SEE SHEET BT120-CPP100 FOR GENERAL
PAVING D7 INSTALL CEMENT CONCRETE TRAFFIC
CURB AND GUTTER
NOTES.
PER WSDOT STD PLAN F-10.12
2. SEE SHEET BT120-CPS101-CPS108 FOR PAVING
POINT TABLES.
3. SEE SHEETS BT120-CRD101-CRD119 FOR CURB
RAMP PLAN AND DETAILS AND ADDITIONAL PAVING
POINTS.
4. SEE SHEETS BT120-CRD120-CRD129 FOR PAVING
DETAILS.
5. SEE SHEETS BT120-GZKO01 AND
BT120-GZN001-GZN007 FOR GENERAL KEY PLAN,
GENERAL ABBREVIATIONS, AND GENERAL SYMBOLS
AND LEGEND.
6. SEE SHEETS BT120-LPP101-LPP106 AND
BT120-LPP201-LPP205 FOR LANDSCAPE PLANTING
PLAN.
7. SEE ARCHITECTURAL AND STRUCTURAL SHEETS
FOR DETAILS.
8. SEE CHANNELIZATION AND SIGNING PLANS FOR
BOLLARD SIGN POST DETAILS AND LOCATIONS.
�9. _ SEE SHEET BT120-CGP103 FOR ADDITIONAL GRADING
q -INFORMATION-AT- THIS LOCATION.
10/24/2025
LBR
MS
LBR
I CoR Permit Revisions - CNWD #001
07/07/2025
YS
MKR
LBR
ADDENDUM #3
06/13/2025
LBR
DP
LBR
ADDENDUM #1
12/10/2024
LBR
LDG
LBR
ISSUED FORBID
DATE
DSN
ICHK
APP
IREVISION
OINSTALL HMA PAVEMENT PER TYPICAL SECTIONS ON
SHEETS BT1 20-CRY1 01 -CRY1 06
11 INSTALL CEMENT CONC PAVEMENT PER TYPICAL
, SECTIONS ON SHEETS BT120-CRY101-CRY106
13 INSTALL INTEGRAL DOWELED CURB PER KCM STD PLAN
D109
15 INSTALL CEMENT CONC TRAFFIC CURB AND GUTTER PER
CITY OF RENTON STD PLAN 101
17 INSTALL CEMENT CONC SIDEWALK PER CITY OF RENTON
STD PLAN 102
19 INSTALL CEMENT CONC TRAFFIC CURB PER CITY OF
RENTON STD PLAN 101
27 SEE SHEETS BT120-LHP101-LHP105, BT120-LHP201-LHP205
AND BT120-LHD101-LHD109 FOR HARDSCAPE PLAN AND
DETAILS
33 INSTALL WHEEL STOP PER DETAIL ON SHEET
BT120-CRD128
36 INSTALL ROADWAY BOLLARD TYPE 1 PER DETAIL ON
SHEET BT120-CRD129
39 SEE TYPICAL SECTIONS FOR SUBGRADE PREPARATION
DESIGNED BY:
L. REDMAN
THR�'I�
V �� of WA s�I� 9�
p 22025708 9 W
��� �01ST",
sSIONAL S
10/24/2025
DRAWN BY:
Y. SHEN
CHECKED BY:
L. GILBERT
APPROVED BY:
L. REDMAN
SUBMITTED BY:
R. PARGAS
40 INSTALL YELLOW DETECTABLE WARNING SURFACE PER
WSDOT STD PLAN F-45.10
42 PAINTED RED CURB
A
LEGEND*:
+++++++++++++ LANDSCAPING
HARDSCAPE
CK) PAVING POINT
* SEE SHEETS BT120-GZN006-GZN007 FOR
GENERAL SYMBOLS AND LEGEND
LONGITUDINAL JOINT
— — — — — — — — — — — — TRANSVERSE JOINT
Q Q
45 U) co
Uj J
BRT General Engineering Consultant z U-
DATE: REVIEWED BY:
12/10/2024 1 J. ALTCHECH
10 � =L
Q_ J SW 7TH ST u
I.
103
� I I
L � I
102 I 107
201
_ 202 106
203 `W4 W
204' J
_ 205 105
101 104
SW
WpY �� �I I
co I
SCALE:
1 "=20'
FILENAME:
S1-BT120-CPP201-205
SoUNDTRANsiT CONTRACT No.:
RTA/LR RTA/CN 0205
DATE: DATE:
12/10/2024 12/10/2024
20 10 0 20 40
KEY MAP SCALE IN FEET
DEVELOPMENT ENGINEERING
msippo 11 /25/2025 R-433290
STRIDE BUS RAPID TRANSIT DRAWING No.:
SOUTH RENTON TRANSIT CENTER BT120-CPP203
BT105 FACILITY ID:
CIVIL BT120
SHEET No.: REV:
PAVING PLAN
S RENTON TRANSIT CENTER 090 A
Ln
0
0
0
0
T
co
co
N
O
O
O
N
Q
J