Loading...
HomeMy WebLinkAboutR-43320909 Xrefs: (� xS1-BT120-CPP0 xS1-BT120-VRXO xS1-BT120-CZN0 O xBRT-CUD05-TB xS1-BT120-CAPO xS1-BT120-CPP0 Q xS1-BTP120-VSF I ' ' xS1-BT120-GZK0 iW xS1-BT120-GZK xS1-BT120-LHP0 xS1-BT120-CZN0 xS1-BT120-CRP001 LO 0 N 0 N a w 0 N m 0 N M 0 0 J z 0 w X w I C� Z a � � m � I w � _jm _o o z A 2 0 1 L N 0 o U No CV O a a Uj v _zo J CV V IW W W c SEE NOTE 7 1 '� BT120-CRD 119 �� 213 �/ 212 195 187 an R=10.0': k k k k X k k k k k 17) I U R=15.0 k 178 k k 0' 215 k k 188 k k k k 182 R=3.0' 173 105 106 39 9 n Do 0 19 194 k k k R=10 0' k k k k 36 k 174 19 R=3.0' ° R=43.0' y% 2 k k. k k k 216 k k k k k 185 k 172 251 108 G 104 k k k k 230 k k k R=3.0' 19 183 179 171 180 :0 107 v 214 k k kk kk k k 19 0 184 103 Q. �L k k k k k 1 9 2 3 6 R-50.0 .. a.. 1 7 I k k 2 24 k k 21 7 k k R- 3. 0 1. 8 9 - R-3. o 109 k k 1 91 k k 250 . •• k k k k k k k k k 218 k k . 1 9 1 9 .a k k k k GENERAL NOTES: KEY NOTES: MATCHLINE: SEE DWG BT120-CPP205 1. SEE SHEET BT120-CPP100 FOR GENERAL PAVING D7 INSTALL CEMENT CONCRETE TRAFFIC CURB AND GUTTER NOTES. PER WSDOT STD PLAN F-10.12 2. SEE SHEET BT120-CPS101-CPS108 FOR PAVING POINT TABLES. 3. SEE SHEETS BT120-CRD101-CRD119 FOR CURB RAMP PLAN AND DETAILS AND ADDITIONAL PAVING POINTS. 4. SEE SHEETS BT120-CRD120-CRD129 FOR PAVING DETAILS. 5. SEE SHEETS BT120-GZKO01 AND BT120-GZN001-GZN007 FOR GENERAL KEY PLAN, GENERAL ABBREVIATIONS, AND GENERAL SYMBOLS AND LEGEND. 6. SEE SHEETS BT120-LPP101-LPP106 AND BT120-LPP201-LPP205 FOR LANDSCAPE PLANTING PLAN. 7. SEE ARCHITECTURAL AND STRUCTURAL SHEETS FOR DETAILS. 8. SEE CHANNELIZATION AND SIGNING PLANS FOR BOLLARD SIGN POST DETAILS AND LOCATIONS. �9. _ SEE SHEET BT120-CGP103 FOR ADDITIONAL GRADING q -INFORMATION-AT- THIS LOCATION. 10/24/2025 LBR MS LBR I CoR Permit Revisions - CNWD #001 07/07/2025 YS MKR LBR ADDENDUM #3 06/13/2025 LBR DP LBR ADDENDUM #1 12/10/2024 LBR LDG LBR ISSUED FORBID DATE DSN ICHK APP IREVISION OINSTALL HMA PAVEMENT PER TYPICAL SECTIONS ON SHEETS BT1 20-CRY1 01 -CRY1 06 11 INSTALL CEMENT CONC PAVEMENT PER TYPICAL , SECTIONS ON SHEETS BT120-CRY101-CRY106 13 INSTALL INTEGRAL DOWELED CURB PER KCM STD PLAN D109 15 INSTALL CEMENT CONC TRAFFIC CURB AND GUTTER PER CITY OF RENTON STD PLAN 101 17 INSTALL CEMENT CONC SIDEWALK PER CITY OF RENTON STD PLAN 102 19 INSTALL CEMENT CONC TRAFFIC CURB PER CITY OF RENTON STD PLAN 101 27 SEE SHEETS BT120-LHP101-LHP105, BT120-LHP201-LHP205 AND BT120-LHD101-LHD109 FOR HARDSCAPE PLAN AND DETAILS 33 INSTALL WHEEL STOP PER DETAIL ON SHEET BT120-CRD128 36 INSTALL ROADWAY BOLLARD TYPE 1 PER DETAIL ON SHEET BT120-CRD129 39 SEE TYPICAL SECTIONS FOR SUBGRADE PREPARATION DESIGNED BY: L. REDMAN THR�'I� V �� of WA s�I� 9� p 22025708 9 W ��� �01ST", sSIONAL S 10/24/2025 DRAWN BY: Y. SHEN CHECKED BY: L. GILBERT APPROVED BY: L. REDMAN SUBMITTED BY: R. PARGAS 40 INSTALL YELLOW DETECTABLE WARNING SURFACE PER WSDOT STD PLAN F-45.10 42 PAINTED RED CURB A LEGEND*: +++++++++++++ LANDSCAPING HARDSCAPE CK) PAVING POINT * SEE SHEETS BT120-GZN006-GZN007 FOR GENERAL SYMBOLS AND LEGEND LONGITUDINAL JOINT — — — — — — — — — — — — TRANSVERSE JOINT Q Q 45 U) co Uj J BRT General Engineering Consultant z U- DATE: REVIEWED BY: 12/10/2024 1 J. ALTCHECH 10 � =L Q_ J SW 7TH ST u I. 103 � I I L � I 102 I 107 201 _ 202 106 203 `W4 W 204' J _ 205 105 101 104 SW WpY �� �I I co I SCALE: 1 "=20' FILENAME: S1-BT120-CPP201-205 SoUNDTRANsiT CONTRACT No.: RTA/LR RTA/CN 0205 DATE: DATE: 12/10/2024 12/10/2024 20 10 0 20 40 KEY MAP SCALE IN FEET DEVELOPMENT ENGINEERING msippo 11 /25/2025 R-433290 STRIDE BUS RAPID TRANSIT DRAWING No.: SOUTH RENTON TRANSIT CENTER BT120-CPP203 BT105 FACILITY ID: CIVIL BT120 SHEET No.: REV: PAVING PLAN S RENTON TRANSIT CENTER 090 A Ln 0 0 0 0 T co co N O O O N Q J