Loading...
HomeMy WebLinkAboutR-4332140N co Xrefs: co xS1-BT120-VRX xS1-BT1 P20-VS xS1-BT120-CDN xS1-BT120-CPP xBRT-CUD05-T xS1-BTP120-GZ xS1-BT120-CAP 0 GB-SEAL-SS56 1 1 xS1-BT120-CDP xS 1-BT120-CGP I— xS 1-BT120-RPP xS1-BT120-CZN002 xS1-BT120-CZN003 ®R co 0 N O n 0 U 0 N_ H m U) 0 N co co It 0 0 O (D z J Z) U) z O z O m co O 2 U) Q (D = W m Y Q U) U) m _o �a co z c'7 — Y O LO N N a_ o U GENERAL NOTES: 1. SEE BT120-CDD501-504 SHEETS FOR DRAINAGE DETAILS 2. SEE BT120-CRY101-105 SHEETS FOR TYPICAL ROADWAY SECTIONS. 3. SEE BT120-CSP101-107 SHEETS FOR SITE PREPARATION PLANS. 4. SEE BT120-CPP101-107 SHEETS FOR PAVING PLANS. 5. SEE BT120-UCP101-205 SHEETS FOR EXISTING STORM STRUCTURES/PIPES REMOVAL, AND UTILITIES PLANS. 6. EXISTING FACILITIES TO BE PROTECTED -IN -PLACE UNLESS OTHERWISE NOTED. 7. FOR PROPOSED IMPROVEMENTS NOT SHOWN, SEE PAVING, TRAFFIC, AND UTILITY SHEETS. 8. USE WSDOT STANDARD SPECIFICATIONS UNLESS OTHERWISE NOTED. MATCHLINE: SEE DWG BT120-CDP203 KEY NOTES: O3 INSTALL CATCH BASIN TYPE 2 PER COR STD PLAN 201.00, WITH STORM ROUND FRAME AND COVER (PRIVATE) PER COR STD PLAN 204.40. RIMS TO BE NON -SLIP WHEN LOCATED WITHIN WALKWAYS. 20 REMOVE EXISTING OPEN CURB FACE FRAME AND GRATE AND INSTALL RECTANGULAR FRAME AND SOLID METAL COVER PER COR STD PLANS 204.00 AND 204.10, RESPECTIVELY. 21 ADJUST RIM TO GRADE. 24 INSTALL BIOFILTRATION SYSTEM TYPE D UNIT. SEE DWG. BT120-CDD504 FOR DETAILS AND SPECIAL PROVISIONS 7-05. 38 INSTALL CATCH BASIN TYPE 1 L PER COR STD PLAN 200.10, WITH OPEN CURB FACE FRAME AND GRATE PER COR STD PLAN 203.00. 41 INSTALL BIOFILTRATION SYSTEM TYPE A UNIT. SEE 9. PVC PIPE MATERIAL SHALL NOT BE USED FOR STORM SD DWG. BT120-CDD501 FOR DETAILS AND SPECIAL PIPE SPANS WITH 3 FEET OF COVER OR LESS. PROVISIONS. 10. ALL STRUCTURES SHALL BE HS 20 LOAD RATED UNLESS 43 STRUCTURE FRAME AND COVER MEET AASHTO OTHERWISE NOTED. SEE CDD DETAIL SHEETS FOR LOAD RATING HS-25. PROPRIETARY BMP LOADING CONSIDERATIONS DESIGNED BY: S. SRIDHARAN 4��F raWRs�jr� b oNA 10-24-2025 DRAWN BY:��� H. ONG A 10/24/2025 SS RP SS COR PERMIT REVISION - CNWD#001 CHECKED BY: R. PARISH 1 06/13/2025 SS RP SS ADDENDUM #1 0 12/10/2024 SS RP SS ISSUED FOR BID APPROVED BY: S. SRIDHARAN SUBMITTED BY: R. PARGAS No. DATE DSN CHK APP REVISION MATCHLINE: SEE DWG BT120-CDP201 DRAINAGE STRUCTURE TABLE STRUCTURE STRUCTURE DETAILS PIPES IN PIPES OUT CB TYPE 1 L 102-17 STA. 207+86.09 (1.36', RT) IE 21.95 (SE) RIM 24.97 CB TYPE 2 - 48" IE 20.45 (W) 102-18 STA. 309+07.02 (32.09', RT) IE 19.95 (S) IE 19.95 (N) RIM 25.35 TYPE C UNIT FIL-3 STA SEE BT120-CDD501 IE 20.61 (E) RIM 25.20 TYPE D UNIT MWS-66 STA SEE BT120-CDD504 IE 21.93 (NW) IE 21.41 (E) RIM 25.55 Q Q 45 cn W J BRT General Engineering Consultant � U_ DATE: REVIEWED BY: 12/10/2024 J. ALTCHECH 1ZIAIP% f%^I IKITV \A/A@TC\A/ATCM TMCATAACAIT M11/101/1A1 Al^=O. 1. THE LPA PROGRAM MUST BE CONTACTED AT 206-477-5414 OR LPA.team@kingcounty.gov AT LEAST (10) WORKING DAYS IN ADVANCE OF THE PRE -CONSTRUCTION CONFERENCE FOR THIS PROJECT. 2. THE LPA PROGRAM MUST BE CONTACTED AT 206-477-5414 OR LPA.team@kingcounty.gov AT LEAST (10) WORKING DAYS PRIOR TO THE CONSTRUCTION ACTIVITY WITHIN 50 FEET OF THE KING COUNTY SEWER PIPE. 3. KING COUNTY SHALL BE PRVIDED A COPY OF THE "CONTRACTOR'S NOTICE TO PROCEED" AND CONTRACTOR'S CONTACT INFORMATION PIOR TO THE START OF CONSTRUCTION. SCALE: 1 "=20' FILENAME: S1-BT120-CDP102-106 SOUNDTRANSIT CONTRACT No.: RTA/CN 0205-24 DATE: DATE: 12/10/2024 12/10/2024 UPDATES TO ROW AND SEWER SEE SHEETS BT120-RPP104 BT1 20-RPP201 -BT1 20-RPP205 BT120-USP102,BT120-USP104 BT120-USP201-USP202 BT120-USP204-USP205 20 10 0 20 40 KEY MAP SCALE IN FEET DEVELOPMENT ENGINEERING msippo 11 /25/2025 V4310 R-4332140 STRIDE BUS RAPID TRANSIT DRAWING No.: SOUTH RENTON TRANSIT CENTER BT120-CDP102 BT105 FACILITY ID: CIVIL BT120 SHEET No.: REV: DRAINAGE PLAN RAINIER STA 204+00 TO RAINIER STA 208+50 164 A C'7 N T N 0 0 N CU L J 0 0 0 T