Loading...
HomeMy WebLinkAboutR-4332146N Xrefs: co xS1-BT120-VRX xS 1-BT120-CD N xS1-BTP120-CD xS1-BTP120-CP xBRT-CUD05-T xS1-BTP120-GZ xS1-BTP120-CA Q xS1-BTP120-VS 1 1 xS1-BT120-CGP xS 1-BT120-CM P xS 1-BT120-APP GB-SEAL-SS56324 xS 1-BT120-SG P301 xS1-BT120-RPP001 xS1-BT120-CZN002 xS1-BT120-CZN003 ®R LO 0 N 0 N o- r) 0 N m U) 0 N co It 0 0 O C� z J Z) U) z 0 z O m U 0 _ U) Y Q (D `� = W m Y Q co U) co _o �a T� VJ coco- Y O LO > N cli N a_ o U W GENERAL NOTES: MATCHLINE: SEE DWG BT120-CDP201 �Q. MATCHLINE: SEE DWG BT120-CDP205 KEY NOTES: KEY NOTES: 1. SEE BT120-CDD501-504 SHEETS FOR DRAINAGE DETAILS 2. SEE BT120-CRY101-105 SHEETS FOR TYPICAL ROADWAY SECTIONS. 3. SEE BT120-CSP101-107 SHEETS FOR SITE PREPARATION PLANS. 4. SEE BT120-CPP101-107 SHEETS FOR PAVING PLANS. 5. SEE BT120-UCP101-205 SHEETS FOR EXISTING STORM STRUCTURES/PIPES REMOVAL, AND UTILITIES PLANS. 6. EXISTING FACILITIES TO BE PROTECTED -IN -PLACE UNLESS OTHERWISE NOTED. 7. FOR PROPOSED IMPROVEMENTS NOT SHOWN, SEE PAVING, TRAFFIC, AND UTILITY SHEETS. O INSLL TACATCH BASIN TYPE 2 PER COR STD PLAN 9 21 ADJUST RIM TO GRADE. 10. ALL STRUCTURES SHALL BE HS 20 LOAD RATED UNLESS OTHERWISE NOTED. SEE CDD DETAIL SHEETS FOR 22 EXISTING SD PIPE TO REMAIN. PROPRIETARY BMP LOADING CONSIDERATIONS 1O INSTALL CATCH BASIN TYPE 1 PER COR STD PLAN 200.00, WITH RECTANGULAR FRAME AND VANED GRATE PER COR STD PLANS 204.00 AND 204.20, RESPECTIVELY. OINSTALL CATCH BASIN TYPE 2 PER COR STD PLAN 201.00, WITH STORM ROUND FRAME AND COVER (PRIVATE) PER COR STD PLAN 204.40. RIMS TO BE NON -SLIP WHEN LOCATED WITHIN WALKWAYS. OINSTALL CATCH BASIN TYPE 2 PER COR STD PLAN 201.00, WITH FRAME AND VANED GRATE PER COR STD PLANS 204.00 AND 204.20, RESPECTIVELY. OINSTALL 3' WIDE CONCRETE VALLEY GUTTER. SEE DWG. BT120-CRD123 FOR DETAILS. 8. USE WSDOT STANDARD SPECIFICATIONS UNLESS OTHERWISE NOTED. 9. PVC PIPE MATERIAL SHALL NOT BE USED FOR STORM SD PIPE SPANS WITH 3 FEET OF COVER OR LESS. 201.00, WITH STORM ROUND FRAME AND COVER PER COR STD PLAN 204.50. CONNECT EXISTING 30-INCH STORM DRAIN PIPES AND THE NEW 12-INCH PIPE(S) TO THE NEW CATCH BASIN PER SPECIAL PROVISIONS 7-05. DESIGNED BY: S. SRIDHARAN DRAWN BY: H. ONG A 10/24/2025 SS RP SS COR PERMIT REVISION - CNWD#001 CHECKED BY: R. PARISH 1 06/13/2025 SS RP SS ADDENDUM #1 0 12/10/2024 SS RP SS ISSUED FOR BID APPROVED BY: S. SRIDHARAN No. DATE DSN CHK APP REVISION Q SRIIIfI�r� Q4� OF jNASI�I `Yl \!F�`C, 25 INSTALL 6-INCH CLEANOUTS PER COR STD PLAN 226.00. 37 INSTALL ROOF DOWNSPOUT CONNECTIONS. SEE DETAIL 1, SHEET BT120-AED903. 38 INSTALL CATCH BASIN TYPE 1 L PER COR STD PLAN 200.10, WITH OPEN CURB FACE FRAME AND GRATE PER COR STD PLAN 203.00. 41 INSTALL BIOFILTRATION SYSTEM TYPE A UNIT. SEE DWG. BT120-CDD501 FOR DETAILS AND SPECIAL PROVISIONS 7-05. 46 SEE CDD507 FOR OIL DEBRIS HOOD INSTALLATION AND SPECIAL PROVISIONS 7-05. DRAINAGE STRUCTURE TABLE STRUCTURE STRUCTURE DETAILS PIPES IN PIPES OUT CB TYPE 1 IE 25.03 (S) 203-83 STA. 613+89.17 (125.10', RT) IE 25.53 (NW) IE 25.03 (NE) RIM 27.58 TYPE A UNIT FIL-1 STA SEE BT120-CDD501 IE 20.40 (NE) RIM 23.96 5 2 W O 0 W oNaL E� SUBMITTED BY: 10-24-2025 R. PARGAS Q JQ 45T)?IDE cn W J BRT General Engineering Consultant � LL DATE: REVIEWED BY: 12/10/2024 J. ALTCHECH DRAINAGE STRUCTURE TABLE STRUCTURE STRUCTURE DETAILS PIPES IN PIPES OUT CB TYPE 1 L 203-11 STA. 612+50.48 (61.83', RT) IE 22.82 (SW) IE 22.82 (NE) RIM 26.58 CB TYPE 1 203-13 STA. 611+10.40 (94.60', RT) IE 21.65 (SW) IE 21.65 (NE) RIM 24.64 CB TYPE 1 203-14 STA. 204+79.77 (98.15', RT) IE 22.16 (S) IE 22.16 (NE) RIM 25.17 CB TYPE 2-48" 203-45 STA. 716+28.18 (79.73', RT) IE 21.35 (W) IE 21.35 (N) RIM 27.15 CB TYPE 2-60" IE 19.53 (E) EX 203-46 STA. 716+11.09 (58.49', RT) IE 21.03 (S) IE 19.53 (W) EX RIM 27.18 CB TYPE 1 203-57 STA. 612+49.06 (116.59', RT) IE 23.10 (NE) RIM 27.62 CB TYPE 1 IE 22.51 (S) 203-62 STA. 204+38.56 (97.20', RT) IE 22.51 (W) IE 22.51 (N) RIM 25.53 CB TYPE 1 203-63 STA. 203+87.58 (101.24', RT) IE 22.80 (S) IE 22.80 (N) RIM 25.82 CB TYPE 1 203-64 STA. 204+38.47 (64.42', RT) IE 22.80 (E) RIM 25.03 CB TYPE 2-48" 203-65 STA. 613+57.39 (66.58', RT) IE 23.03 (SW) IE 23.03 (NW) RIM 27.40 CB TYPE 1 203-71 STA. 613+53.93 (165.92', RT) IE 23.53 (NE) RIM 26.95 CB TYPE 1 L 203-72 STA. 153+96.92 (214.14', LT) IE 23.62 (NE) IE 23.62 (S) RIM 26.92 CB TYPE 2-48" 203-73 STA. 611+73.45 (62.25', RT) IE 22.05 (N) RIM 25.25 CB TYPE 1 203-74 STA. 613+70.81 (183.62', RT) IE 23.85 (SW) RIM 26.98 CB TYPE 1 IE 25.67 (NW) 203-82 STA. 613+92.30 (151.92', RT) IE 25.67 (SW) IE 25.17 (N) RIM 27.52 SCALE: m V=-.. 1 1 "=20' FILENAME: S1-BT120-CDP201-205 SOUNDTRANSIT CONTRACT No.: RTA/CN 0205-24 DATE: DATE: 12/10/2024 12/10/2024 UPDATES TO ROW ANDS SEWER SEE SHEETS BT120-RPP104 BT1 20-RPP201 -BT1 20-RPP205 BT 120-U S P 102, BT 120-U S P 104 BT120-USP201-USP202 BT120-USP204-USP205 20 10 0 20 40 KEY MAP s SCALE IN FEET DEVELOPMENT ENGINEERING � AW"bk msippo 11 /25/2025 R-4332146 STRIDE BUS RAPID TRANSIT DRAWING No.: SOUTH RENTON TRANSIT CENTER BT120-CDP203 BT105 FACILITY ID: CIVIL BT120 SHEET No.: REV: DRAINAGE PLAN S RENTON TRANSIT CENTER 170 A N T N O O N CU co O O O Q J