HomeMy WebLinkAboutR-4332156N
Xrefs: M
xBRT-CUD05-T
GB-SEAL-SS56
0
w
,,
I
ti
0
LO
CD
0
0
U
0
N
m
W
CD
N
M
It
0
0
75
O
C�
z_
J
W
z
O
z
ry
m
O
U)
Y
U_ Uaj
_ 06
cf) m
Y I
Q U)
U) m
—O
U
Q<
co (D
zLID
Y
N
o
o U
VAULT LENGTH
OUTLET PIPE
4" TO 8" REDUCER7, IwAl l* * A
►�Gii.�.��� �.�.?NOT PROVIDED BY
ilrZ1
MANUFACTURER ,� i�.�.�.�t� ►'rl�.
■rs��
FLOW
CONTROL
POINT 2 (6)
O
4.00'
INLET OPENING
13.00' CONCRETE DEPRESSED GUTTER
METAL COVER LID PROVIDED BY
MANUFACTURER (SEE GENERAL
NOTES FOR LOAD RATING)
UNDERDRAIN
FLOW
CONTROL
POINT 1 (D
BIOFILTRATION SYSTEM TYPE A PLAN VIEW
NOT TO SCALE
0
TOP SLAB
INTERLOCKING
JOINT (TYP.)
BYPASS
rl�
— CURB
GUTTER
MANUFACTURER
RECOMMENDED TRAY
CLEAN OUT FRAME AND COVER CAST INTO
TOP SLAB PROVIDED BY MANUFACTURER
(SEE GENERAL NOTES FOR LOAD RATING)
co
tYw
Lo
W
J
c')
Q•
'A
•.
3" MULCH LAYER
:..
' ' '.........................
'� "
•
PROVIDED BY
4" TO 8" REDUCER
' "• y d
•
''
MANFACTURER
NOT PROVIDED BY
% �.
�. 4 ' ' • . .
�'.
MANUFACTURER
21" BIOFILTRATION MEDIA
LAYER PROVIDED BY
SDR 35 OUTLET
MANUFACTURER
COUPLING CAST INTO
BYPASS/
PRECAST VAULT WALL
UNDERDRAIN FLOWKIT
6" UNDERDRAIN STONE LAYER
PROVIDED BY
PROVIDED BY MANUFACTURER PROVIDED BY MANUFACTURER
MANUFACTURER
BIOFILTRATION
SYSTEM TYPE A PROFILE VIEW
A
r
NOT TO SCALE
TRANSITIONAL O O TRANSITIONAL
CURB CURB
BIOFILTRATION SYSTEM A
EX CURB UNIT (BEHIND) o EX CURB
Lq
THROAT o
OPENING
u d dv 4 4'
a
4
EX GUTTER EX GUTTER
4.00' 5.00' 4.00'
1 TRANSITIONALO FULLY DEPRESSED GUTTER TRANSITIONAL D 1
DEPRESSED GUTTER SEE DETAIL 2 THIS SHEET DEPRESSED GUTTER
CONCRETE DEPRESSED GUTTER B
NOT TO SCALE -
DESIGNED BY:
S. SRIDHARAN
DRAWN BY:
H. ONG
CHECKED BY:
1 06/13/2025 SS RP SS ADDENDUM #1 R. PARISH
0 12/10/2024 SS RP SS ISSUED FOR BID APPROVED BY:
No. DATE DSN CHK APP REVISION S. SRIDHARAN
STANDARD 900 NOSING PRECAST
(OTHER NOSING AVAILABLE TOP SLAB
UPON REQUEST) - Q
ti U
co —
4" MIN.CLEAR C) >_
THROAT OPENING ~
in MANUFACTURER RECOMMENDED OUTLET
0 27% a. PROTECTION DEVICE
OTHROAT OPENING 7 \ $ DO NOT REMOVE -LEAVE IN
ELEVATION a aO
PLACE UNTIL SITE IS STABILIZED
AND BIOFILTRATION SYSTEM A IS
d a a ACTIVATED
CAST -IN -PLACE GUTTER
AND THROAT OPENING #4 DOWEL BARS @ 12" O.C. BY
MANUFACTURER 0
(BY CONTRACTOR PER 4
LOCAL STANDARDS)
PRECAST VAULT WALL 0.50' MAX. CLEAR
THROAT OPENING
ID#
STANDARD CURB INLET WITH MANUFACTURER
RECOMMENDED OUTLET PROTECTION DEVICE
NOT TO SCALE
CONSTRUCTION NOTES
O CONTRACTOR SHALL SAWCUT AND REMOVE EXISTING CURB AND GUTTER AS NECESSARY
TO INSTALL BIOFILTRATION SYSTEM UNIT AND TRANSITIONAL CURB.
O CONTRACTOR SHALL CAST IN PLACE NEW CEMENT CONCRETE DEPRESSED GUTTER AND
TRANSITIONAL CURB AS NEEDED. DIMENSIONS SHOWN ARE APPROXIMATE AND SHALL BE
FIELD VERIFIED. NEW CURB AND GUTTER SHALL TRANSITION SMOOTHLY TO MATCH
EXISTING GRADES AND FEATURES INCLUDING CURB, GUTTER, AND PAVEMENT.
O OUTLET PIPE LOCATION VARIES, SEE DRAINAGE PLAN SHEETS.
O CONTRACTOR TO BEND BIOFILTRATION TYPE A UNIT DOWEL BAR AS NEEDED TO INSTALL
CAST IN PLACE DEPRESSED GUTTER AND THROAT OPENING.
O INTERIOR FEATURES OF BIOFILTRATION TYPE A UNIT ARE TYPICALLY PROVIDED BY
MANUFACTURER AND ARE SHOWN FOR REFERENCE ONLY.
6O STATION/OFFSET CONTROL POINTS FOR BIOFILTRATION TYPE A UNITS ARE TO THE
CORNER OF EACH UNIT AT OUTER FACE OF PRECAST WALL. UNIT ALIGNMENT IS ORIENTED
PARALLEL TO CURB LINE: LOCATIONS ARE APPROXIMATE, CONTRACTOR TO FIELD
VERIFY.THROAT CLEARANCE SHALL BE 4" MIN AND 6" MAX.
O7 SEE BIOFILTRATION TYPE A UNITS SCHEDULE FOR THROAT OPENING ELEVATION. TABLE
ELEVATION IS APPROXIMATE, CONTRACTOR TO FIELD VERIFY.
(8) THROAT CLEARANCE SHALL BE 4" MIN AND 6" MAX.
GENERAL BIOFILTRATION TYPE A NOTES
1 1. BIOFILTRATION SYSTEM TYPE A WITHOUT PLANTS SHALL HAVE SOLID CONCRETE
TOP SLAB AND ACCESS HATCHES MEETING LOADING REQUIREMENTS PER
SCHEDULE TABLE BELOW.
2. BIOFILTRATION SYSTEM TYPE A UNIT TOP ELEVATION AND THROAT OPENING
ELEVATIONS ARE APPROXIMATE. CONTRACTOR TO FIELD VERIFY UNIT ELEVATIONS
AND SET UNIT ELEVATIONS TO ACHIEVE REQUIRED GRADES FROM EXISTING
GUTTER.
3. IF THE BIOFILTRATION SYSTEM TYPE A UNIT IS STORED BEFORE INSTALLATION, THE
TOP SLAB MUST BE PLACED ON THE BOX USING THE 2X4 WOOD PROVIDED, TO
PREVENT ANY CONTAMINATION FROM THE SITE. ALL INTERNAL FITTINGS SUPPLIED
(IF ANY), MUST BE LEFT IN PLACE AS PER THE DELIVERY.
4. THE UNIT SHALL BE PLACED ON A COMPACTED SUB -GRADE WITH A MINIMUM 6-INCH
CSTC. THE UNIT IS TO BE PLACED SUCH THAT THE UNIT AND TOP SLAB MATCH THE
GRADE OF THE CURB IN THE AREA OF THE UNIT. COMPACT UNDISTURBED
SUB -GRADE MATERIALS TO 95% OF MAXIMUM DENSITY AT +1 TO 2% OF OPTIMUM
MOISTURE. UNSUITABLE MATERIAL BELOW SUB -GRADE SHALL BE REPLACED TO
THE ENGINEER'S APPROVAL.
5. OUTLET CONNECTIONS SHALL BE ALIGNED AND SEALED TO MEET THE APPROVED
DRAWINGS WITH MODIFICATIONS NECESSARY TO MEET SITE CONDITIONS AND CITY
STANDARDS.
6. ONCE THE UNIT IS SET, THE INTERNAL WOODEN FORMS AND PROTECTIVE MESH
COVER MUST BE LEFT INTACT. REMOVE ONLY THE TEMPORARY WOODEN SHIPPING
BLOCKS BETWEEN THE BOX AND THE TOP SLAB. THE TOP LID SHOULD BE SEALED
ONTO THE BOX SECTION BEFORE BACKFILLING, USING A NON -SHRINK GROUT,
BUTYL RUBBER OR SIMILAR WATERPROOF SEAL. THE BOARDS ON TOP OF THE LID
AND BOARDS SEALED IN THE UNIT'S THROAT MUST NOT BE REMOVED. THE
SUPPLIER (AMERICAST OR ITS AUTHORIZED DEALER) WILL REMOVE THESE
SECTIONS AT THE TIME OF ACTIVATION. BACKFILLING SHOULD BE PERFORMED IN A
CAREFUL MANNER, BRINGING THE APPROPRIATE FILL MATERIAL UP IN 6" LIFTS ON
ALL SIDES. PRECAST SECTIONS SHALL BE SET IN A MANNER THAT WILL RESULT IN A
WATERTIGHT JOINT. IN ALL INSTANCES, INSTALLATION OF BIOFILTRATION UNIT
SHALL CONFORM TO ASTM SPECIFICATION C891 "STANDARD PRACTICE FOR
INSTALLATION OF UNDERGROUND PRECAST UTILITY STRUCTURES", UNLESS
DIRECTED OTHERWISE IN CONTRACT DOCUMENTS.
7. THE CONTRACTOR IS RESPONSIBLE FOR INLET PROTECTION/SEDIMENT CONTROL
AND CLEANING AROUND EACH BIOFILTRATION SYSTEM TYPE A UNIT.
8. ACTIVATION OF THE BIOFILTRATION SYSTEM TYPE A UNIT IS PERFORMED ONLY BY
THE SUPPLIER. CONTRACTOR IS RESPONSIBLE FOR BIOFILTRATION TYPE A INLET
PROTECTION AND SUBSEQUENT CLEAN OUT COST. THIS PROCESS CANNOT
COMMENCE UNTIL THE AREA TRIBUTARY TO THE UNIT IS FULLY STABILIZED AND
CLEANED (FULL LANDSCAPING, GRASS COVER, FINAL PAVING AND STREET
SWEEPING COMPLETED), NEGATING THE CHANCE OF CONSTRUCTION MATERIALS
CONTAMINATING THE BIOFILTRATION SYSTEM TYPE A SYSTEM. CARE SHALL BE
TAKEN DURING CONSTRUCTION NOT TO DAMAGE THE PROTECTIVE THROAT AND
TOP PLATES.
9. BIOFILTRATION SYSTEM TYPE A SHALL CONSIST OF PRE -CAST VAULT WITH
BIOFILTRATION MEDIA, OUTLET CHAMBER AND AN INTERNAL FLOW BYPASS
SYSTEM. THE TREATMENT SHALL BE IN ACCORDANCE WITH DESIGN DATA AND
INFORMATION CONTAINED IN THIS DRAWING AND THE CONTRACT DOCUMENTS.
CONTRACTOR TO CONFIRM TREATMENT SYSTEM MEETS REQUIREMENTS OF THE
PROJECT.
10. BIOFILTRATION SYSTEM TYPE A SHALL HAVE GENERAL USE LEVEL DESIGNATION
(GULD) AND CERTIFICATION FROM THE WASHINGTON STATE DEPARTMENT OF
ECOLOGY FOR BASIC AND METALS TREATMENT.
11. MANUFACTURER TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE.
12. FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS, WEIGHTS,
AND ACCESSORIES, CONTACT MANUFACTURER.
DENOTE WHICH UNITS WILL BE
PUBLIC VS. PRIVATE
BIOFIL I KATION SYSTEM TYPE A UNITS SCHEDULE
TREATMENT OFFLINE 15 MIN PEAK FLOW STATION/OFFSET VAULT TREATMENT THROAT
REQUIREMENT WQ FLOW RATE RATE (CFS) DIMENSIONS AREA OPENING
(CFS) CONTROL POINT 1 CONTROL POINT 2 DIMENSIONS ELEVATION
RAINIER 206+09.38, RAINIER 206+16.79,
FIL-1 METALS BASIC 0.071 0.300 49.50 RT 49.40 RT 61 x 4'W 61 x 4'W 23.21
RAINIER 202+28.90, RAINIER 202+33.39,
FIL-2 METALS BASIC 0.110 0.428 327.48 RT 327.99 RT 41 x 4'W 41 x 4'W 26.26
SUBMITTED BY:
6-9-2025 R. PARGAS
,fr,RIDE
BRT General Engineering Consultont
DATE: REVIEWED BY:
12/10/2024 J. ALTCHECH
SCALE:
NTS
Q J
FILENAME:
- Q
U
U) co
w
S1-BT120-CDD501-507
z
SOUNDTRANSIT
CONTRACT No.:
RTA/CN 0205-24
DATE:
DATE:
12/10/2024
12/10/2024
LOADING PROVIDE LABELS, LEGEND, SYMBOLS, PIPE AND STRUCTURE STYLE,
REQUIREMEN OR DESIGNERS CHOICE TO CLEARLY SHOW THE DISTINCTION BETWEEN
PUBLIC AND PRIVATE PIPE AND STORM STRUCTURES I TREATMENT
FACILITIES OWNERSHIP. WHICH WILL CORRESPONDED TO REQUIRED
HS-25 MAINTENANCE AND WHO WILL PROVIDE THAT MAINTENANCE IN THE
FUTURE.
HS 20 THIS SHOULD BE ADDED TO THE PLANS AS THE AS••BUIL
UPLOAD AND USED TO TRACK ASSET MANAGEMENT INV R-4332156
MAINTENANCE. I IT IS ALSO USED ON ENGINEERING ST
REFERENCE AND REVIEW SYSTEM UPDAT
IMPORTANT AS A PERMANENT RECORD Offm4s
'R�NMERING ` -�
ippo 11 /25/2025
STRIDE BUS RAPID TRANSIT DRAWING No.:
SOUTH RENTON TRANSIT CENTER BT120-CDD501
BT105 FACILITY ID:
CIVIL BT120
SHEET No.: REV:
DRAINAGE DETAILS
180 1
co
T
N
O
N
CU
N
It
co
co
N
O
O
O
4
Q
J