HomeMy WebLinkAboutR-4332157N
Xrefs: M
xBRT-CUD05-T
GB-SEAL-SS56
0
w
15-
ti
0
LO
0
0
0
U
0
N
m
CD
co
co
NT
CD
O
z_
H
J
W
z
O
z
m
O
C�
U)
Y
C� vaj
_ 06
cf) m
Y I
Q u
U) m
-O
U
Q<
co (D
z_
Y
N 1
-1tt- 3: 0
o W
o lNo.
(DCURB AND GUTTER, CONTROL POINT 1 O6
TYP. (NOT BY `*INLET PIPE
MANUFACTURER) MEDIA BAY 2.00' NOT BY
SEE CURB INLET MANUFACTURER
DETAIL INLET ACCESS SEE MIN.
GENERAL NOTES FOR (LOCATION VARIES) O3
LOAD RATING B
METAL COVER LID PROVIDED BY
MANUFACTURER (SEE GENERAL
NOTES FOR LOAD RATING) z
A
Uz o0
CLEANOUT -
OUTLET Q
ACCESS >
UNDERDRAIN
A
L — —
B
:1 OUTLET PIPE
TRANSFER OPENING NOT BY MANUFACTURER
4" x 15" (LOCATION VARIES) O3
VAULT LENGTH il:\
BIOFILTRATION SYSTEM TYPE B PLAN VIEW
NOT TO SCALE
METAL COVER LID PROVIDED BY
MANUFACTURER (SEE GENERAL
NOTES FOR LOAD RATING)
TOP SLAB
3" MULCH LAYER, TYP.
PROVIDED BY
MANUFACTURER
6" UNDERDRAIN
STONE LAYER, TYP.
PROVIDED BY MANUFACTURER
21" BIOFILTRATION MEDIA, TYP.
PROVIDED BY MANUFACTURER
'V+ - -a,- -
ENERGY
DISSIPATION
ROCKS
oil
k:E DuIl I
i �
FLOWKIT
BIOFILTRATION SYSTEM TYPE B PROFILE VIEW
NOT TO SCALE
P
eoil-
�' • • i j•
e• `.
• •' 4
a
27%
_40-
CURB AND GUTTER,
TYP (NOT BY
MANUFACTURER)
STREET
THROAT OPENING
ELEVATION O
STANDARD CURB INLET B
NOT TO SCALE -
DESIGNED BY:
S. SRIDHARAN
DRAWN BY:
H. ONG
CHECKED BY:
06/13/2025 SS RP SS ADDENDUM #1 R. PARISH
12/10/2024 SS RP SS I ISSUED FOR BID APPROVED BY:
DATE IDSN ICHK APP IREVISION I S. SRIDHARAN
CONTROL POINT 2 (�)
*INLET PIPE
NOT BY
MANUFACTURER
(LOCATION VARIES)
(n
�W
W
J
W
d
LL
— INTERLOCKING JOINT
> cj
=
C]
a
(TYP.)
�
W
INLET BAY PERMANENT
w
.<
X
z
SETTLING POOL ELEV.
_
<
�
0
OUTLET PIPE
NOT BY
MANUFACTURER
(LOCATION VARIES)
CONSTRUCTION NOTES
O CONTRACTOR SHALL SAWCUT AND REMOVE EXISTING CURB AND GUTTER AS
NECESSARY TO INSTALL BIOFILTRATION SYSTEM UNIT AND CURB.
O CONTRACTOR SHALL CAST IN PLACE NEW CEMENT CONCRETE DEPRESSED GUTTER
AND TRANSITIONAL CURB AS NEEDED. DIMENSIONS SHOWN ARE APPROXIMATE AND
SHALL BE FIELD VERIFIED. NEW CURB AND GUTTER SHALL TRANSITION SMOOTHLY
TO MATCH EXISTING GRADES AND FEATURES INCLUDING CURB, GUTTER, AND
PAVEMENT.
O3 INLET AND OUTLET PIPE LOCATION VARIES, SEE SCHEDULE THIS SHEET.
4O CONTRACTOR TO BEND BIOFILTRATION TYPE B UNIT DOWEL BAR AS NEEDED TO
INSTALL CAST IN PLACE DEPRESSED GUTTER AND THROAT OPENING.
O5 INTERIOR FEATURES OF BIOFILTRATION TYPE B UNIT ARE TYPICALLY PROVIDED BY
MANUFACTURER AND ARE SHOWN FOR REFERENCE ONLY.
O STATION/OFFSET CONTROL POINTS FOR BIOFILTRATION TYPE B UNITS ARE TO THE
CORNER OF EACH UNIT AT OUTER FACE OF PRECAST WALL. UNIT ALIGNMENT IS
ORIENTED PARALLEL TO CURB LINE: LOCATIONS ARE APPROXIMATE, CONTRACTOR
TO FIELD VERIFY.
77 THROAT CLEARANCE SHALL BE 4" MIN AND 6" MAX.
O8 SEE BIOFILTRATION TYPE B UNITS SCHEDULE FOR THROAT OPENING ELEVATION.
TABLE ELEVATION IS APPROXIMATE, CONTRACTOR TO FIELD VERIFY.
GENERAL BIOFILTRATION TYPE B NOTES
1 1. BIOFILTRATION SYSTEM TYPE B WITHOUT PLANTS SHALL HAVE SOLID CONCRETE
TOP SLAB AND ACCESS HATCHES MEETING LOADING REQUIREMENTS PER
SCHEDULE TABLE BELOW.
2. BIOFILTRATION SYSTEM TYPE B UNIT TOP ELEVATION AND THROAT OPENING
ELEVATIONS ARE APPROXIMATE. CONTRACTOR TO FIELD VERIFY UNIT ELEVATIONS
AND SET UNIT ELEVATIONS TO ACHIEVE REQUIRED GRADES FROM EXISTING
GUTTER.
3. IF THE BIOFILTRATION SYSTEM TYPE B UNIT IS STORED BEFORE INSTALLATION, THE
TOP SLAB MUST BE PLACED ON THE BOX USING THE 2X4 WOOD PROVIDED, TO
PREVENT ANY CONTAMINATION FROM THE SITE. ALL INTERNAL FITTINGS SUPPLIED
(IF ANY), MUST BE LEFT IN PLACE AS PER THE DELIVERY.
4. THE UNIT SHALL BE PLACED ON A COMPACTED SUB -GRADE WITH A MINIMUM 6-INCH
CSTC. THE UNIT IS TO BE PLACED SUCH THAT THE UNIT AND TOP SLAB MATCH THE
GRADE OF THE CURB IN THE AREA OF THE UNIT. COMPACT UNDISTURBED
SUB -GRADE MATERIALS TO 95% OF MAXIMUM DENSITY AT +1 TO 2% OF OPTIMUM
MOISTURE. UNSUITABLE MATERIAL BELOW SUB -GRADE SHALL BE REPLACED TO
THE ENGINEER'S APPROVAL.
5. OUTLET CONNECTIONS SHALL BE ALIGNED AND SEALED TO MEET THE APPROVED
DRAWINGS WITH MODIFICATIONS NECESSARY TO MEET SITE CONDITIONS AND CITY
STANDARDS.
6. ONCE THE UNIT IS SET, THE INTERNAL WOODEN FORMS AND PROTECTIVE MESH
COVER MUST BE LEFT INTACT. REMOVE ONLY THE TEMPORARY WOODEN SHIPPING
BLOCKS BETWEEN THE BOX AND THE TOP SLAB. THE TOP LID SHOULD BE SEALED
ONTO THE BOX SECTION BEFORE BACKFILLING, USING A NON -SHRINK GROUT,
BUTYL RUBBER OR SIMILAR WATERPROOF SEAL. THE BOARDS ON TOP OF THE LID
AND BOARDS SEALED IN THE UNIT'S THROAT MUST NOT BE REMOVED. THE
SUPPLIER (AMERICAST OR ITS AUTHORIZED DEALER) WILL REMOVE THESE
SECTIONS AT THE TIME OF ACTIVATION. BACKFILLING SHOULD BE PERFORMED IN A
CAREFUL MANNER, BRINGING THE APPROPRIATE FILL MATERIAL UP IN 6" LIFTS ON
ALL SIDES. PRECAST SECTIONS SHALL BE SET IN A MANNER THAT WILL RESULT IN A
WATERTIGHT JOINT. IN ALL INSTANCES, INSTALLATION OF BIOFILTRATION UNIT
SHALL CONFORM TO ASTM SPECIFICATION C891 "STANDARD PRACTICE FOR
INSTALLATION OF UNDERGROUND PRECAST UTILITY STRUCTURES", UNLESS
DIRECTED OTHERWISE IN CONTRACT DOCUMENTS.
7. THE CONTRACTOR IS RESPONSIBLE FOR INLET PROTECTION/SEDIMENT CONTROL
AND CLEANING AROUND EACH BIOFILTRATION SYSTEM TYPE B UNIT.
8. ACTIVATION OF THE BIOFILTRATION SYSTEM TYPE B UNIT IS PERFORMED ONLY BY
THE SUPPLIER. CONTRACTOR IS RESPONSIBLE FOR BIOFILTRATION TYPE B INLET
PROTECTION AND SUBSEQUENT CLEAN OUT COST. THIS PROCESS CANNOT
COMMENCE UNTIL THE AREA TRIBUTARY TO THE UNIT IS FULLY STABILIZED AND
CLEANED (FULL LANDSCAPING, GRASS COVER, FINAL PAVING AND STREET
SWEEPING COMPLETED), NEGATING THE CHANCE OF CONSTRUCTION MATERIALS
CONTAMINATING THE BIOFILTRATION SYSTEM TYPE B SYSTEM. CARE SHALL BE
TAKEN DURING CONSTRUCTION NOT TO DAMAGE THE PROTECTIVE THROAT AND
TOP PLATES.
9. BIOFILTRATION SYSTEM TYPE B SHALL CONSIST OF PRE -CAST VAULT WITH
BIOFILTRATION MEDIA, OUTLET CHAMBER AND AN INTERNAL FLOW BYPASS
SYSTEM. THE TREATMENT SHALL BE IN ACCORDANCE WITH DESIGN DATA AND
INFORMATION CONTAINED IN THIS DRAWING AND THE CONTRACT DOCUMENTS.
CONTRACTOR TO CONFIRM TREATMENT SYSTEM MEETS REQUIREMENTS OF THE
PROJECT.
10.BIOFILTRATION SYSTEM TYPE B SHALL HAVE GENERAL USE LEVEL DESIGNATION
(GULD) AND CERTIFICATION FROM THE WASHINGTON STATE DEPARTMENT OF
ECOLOGY FOR BASIC AND METALS TREATMENT.
11. MANUFACTURER TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE.
12.FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS, WEIGHTS,
AND ACCESSORIES, CONTACT MANUFACTURER.
BIOFILTRATION SYSTEM TYPE B UNITS SCHEDULE
ID #
TREATMENT
OFFLINE 15 MIN
PEAK
STATION/OFFSET
VAULT
TREATMENT
THROAT
INLET
OUTLET
LOADING
REQUIREMENT
WQ FLOW RATE
FLOW
DIMENSIONS
AREA
OPENING
ORIENTATION
ORIENTATION
EQUIREMENT
CONTROL
CONTROL
(CFS)
RATE (CFS)
POINT 1
POINT 2
DIMENSIONS
ELEVATION
LAKE
LAKE
402+28.32,
402+29.46,
NO CURB
FIL-6
METALS BASIC
0.106
0.125
20.21 RT
25.03 RT
61 x 4'W
41 x 4'W
INLET
A
B
HS-20
LAKE
LAKE
400+57.18,
400+52.88,
FIL-7
METALS BASIC
0.028
0.481
18.00 LT
18.00 LT
61 x 4'W
41 x 4'W
24.8
NO PIPE
A
HS 20
SUBMITTED BY:
6-9 2025 R. PARGAS
1
SCALE:
Q J NTS
SrRIDE U) - Q FILENAME:
U
co
w S1-BT120-CDD501-507
BRT General Engineering Consultant z " SOUNDTRANSIT CONTRACT No.:
RTA/CN 0205-24
DATE: REVIEWED BY: DATE: DATE:
12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024
�o1
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
CIVIL
DRAINAGE DETAILS
R-4332157
DEVELOPMENT ENGINEERING
IL
msippo 11 /25/2025
DRAWING No.:
BT120-CDD502
FACILITY ID:
BT120
SHEET No.: REV:
181 1
N
T
O
O
N
CU
itl
A
H
H
H
N
d
C'7
C'7
N
O
O
O
4
Q
J