HomeMy WebLinkAboutR-4332158N
C'7
Xrefs: M
xBRT-CUD05-T
GB-SEAL-SS56
0
W
co
w
Q "
w
ti
0
LO
0
0
0
U
0
N
m
CD
N
co
M
NT
CD
0
0
U
C�
z
J
W
z
O
U
z
O
m
O
U�
C�
U)
Y
U �
_ 06
cf) m
Y I
Q U)
U) m
—O
U
Q<
co (D
z_
Y
N 1
—1tt— 0
C)
o U No.
VAULT LENGTH
O4 CONTROL POINT 1 INLET CURB TYP. (D(2)
l (NOT BY
o-� MANUFACTURER)
000ISGRATE NLET i� B UNDERDRAIN
-- Ht
EE GE ERAL - 0� CLEANOUT
NOTE FOR
LOAD R TING A
J OU LET
ACCES SEE I
GEN RAIL --- --1
NOTES OR B -
LOAD R IN G
1
PROVIDED BY
O4 '4 CONTROL POINT 2 � 1 MANUFACTURER (SEE
OUTLET PIPE '�J GENERAL NOTES FOR
OUTLET LOAD RATING)
NOT BY MANUFACTURER
2.00' MEDIA BAY
MIN.
BIOFILTRATION SYSTEM TYPE C PLAN VIEW
NOT TO SCALE
TRANSFER OPEI
4" x 15"
RIM ELEVATION
CENTER OF GR,
INLET PIPE
NOT BY
MANUFACTURE
UU I LE I F'IF't
NOT BY
MANUFACTURER
(D
3" MULCH LAYER, TYP.
PROVIDED BY
MANUFACTURER
6" UNDERDRAIN
STONE LAYER, TYP.
PROVIDED BY MANUFACTURER
21" BIOFILTRATION
MEDIA, TYP. PROVIDED
BY MANUFACTURER
BIOFILTRATION SYSTEM TYPE C PROFILE VIEW
NOT TO SCALE
DESIGNED BY:
S. SRIDHARAN
DRAWN BY:
H. ONG
CHECKED BY:
06/13/2025 SS RP SS ADDENDUM #1 R. PARISH
12/10/2024 SS RP SS ISSUED FOR BID APPROVED BY:
DATE DSN ICHK APP REVISION I S. SRIDHARAN
INLET
1
�I
I C I
�d
OUTLET
ALTERNATE ORIENTATION
NOT TO SCALE
CONSTRUCTION NOTES
CONTROL POINT 1 O4
--- D �r
CONTROL POINT 2 O4
O CONTRACTOR SHALL SAWCUT AND REMOVE EXISTING CURB AND GUTTER AS
NECESSARY TO INSTALL BIOFILTRATION SYSTEM UNIT AND TRANSITIONAL CURB.
O CONTRACTOR SHALL CAST IN PLACE NEW CEMENT CONCRETE GUTTER AND CURB
AS NEEDED. DIMENSIONS SHOWN ARE APPROXIMATE AND SHALL BE FIELD
VERIFIED. NEW CURB AND GUTTER SHALL TRANSITION SMOOTHLY TO MATCH
EXISTING GRADES AND FEATURES INCLUDING CURB, GUTTER, AND PAVEMENT.
O3 INTERIOR FEATURES OF BIOFILTRATION TYPE C UNIT ARE TYPICALLY PROVIDED BY
MANUFACTURER AND ARE SHOWN FOR REFERENCE ONLY.
4O STATION/OFFSET CONTROL POINTS FOR BIOFILTRATION TYPE C UNITS ARE TO THE
CORNER OF EACH UNIT AT OUTER FACE OF PRECAST WALL. UNIT ALIGNMENT IS
ORIENTED PARALLEL TO CURB LINE: LOCATIONS ARE APPROXIMATE, CONTRACTOR
TO FIELD VERIFY.
GENERAL BIOFILTRATION TYPE C NOTES cy)
N
1 1. BIOFILTRATION SYSTEM TYPE C WITHOUT PLANTS SHALL HAVE SOLID CONCRETE TOP N
SLAB AND ACCESS HATCHES MEETING LOADING REQUIREMENTS PER SCHEDULE TABLE I O
BELOW. 't
N
2. BIOFILTRATION SYSTEM TYPE C UNIT TOP ELEVATION AND THROAT OPENING CU
ELEVATIONS ARE APPROXIMATE. CONTRACTOR TO FIELD VERIFY UNIT ELEVATIONS AND
SET UNIT ELEVATIONS TO ACHIEVE REQUIRED GRADES FROM EXISTING GUTTER.
3. IF THE BIOFILTRATION SYSTEM TYPE C UNIT IS STORED BEFORE INSTALLATION, THE
TOP SLAB MUST BE PLACED ON THE BOX USING THE 2X4 WOOD PROVIDED, TO PREVENT
ANY CONTAMINATION FROM THE SITE. ALL INTERNAL FITTINGS SUPPLIED (IF ANY), MUST
BE LEFT IN PLACE AS PER THE DELIVERY.
4. THE UNIT SHALL BE PLACED ON A COMPACTED SUB -GRADE WITH A MINIMUM 6-INCH
CSTC. THE UNIT IS TO BE PLACED SUCH THAT THE UNIT AND TOP SLAB MATCH THE
GRADE OF THE CURB IN THE AREA OF THE UNIT. COMPACT UNDISTURBED SUB -GRADE
MATERIALS TO 95% OF MAXIMUM DENSITY AT +1 TO 2% OF OPTIMUM MOISTURE.
UNSUITABLE MATERIAL BELOW SUB -GRADE SHALL BE REPLACED TO THE ENGINEER'S
APPROVAL.
5. OUTLET CONNECTIONS SHALL BE ALIGNED AND SEALED TO MEET THE APPROVED
DRAWINGS WITH MODIFICATIONS NECESSARY TO MEET SITE CONDITIONS AND CITY
STANDARDS.
6. ONCE THE UNIT IS SET, THE INTERNAL WOODEN FORMS AND PROTECTIVE MESH COVER
MUST BE LEFT INTACT. REMOVE ONLY THE TEMPORARY WOODEN SHIPPING BLOCKS
BETWEEN THE BOX AND THE TOP SLAB. THE TOP LID SHOULD BE SEALED ONTO THE
BOX SECTION BEFORE BACKFILLING, USING A NON -SHRINK GROUT, BUTYL RUBBER OR
SIMILAR WATERPROOF SEAL. THE BOARDS ON TOP OF THE LID AND BOARDS SEALED IN
THE UNIT'S THROAT MUST NOT BE REMOVED. THE SUPPLIER (AMERICAST OR ITS
AUTHORIZED DEALER) WILL REMOVE THESE SECTIONS AT THE TIME OF ACTIVATION.
BACKFILLING SHOULD BE PERFORMED IN A CAREFUL MANNER, BRINGING THE
APPROPRIATE FILL MATERIAL UP IN 6" LIFTS ON ALL SIDES. PRECAST SECTIONS SHALL
BE SET IN A MANNER THAT WILL RESULT IN A WATERTIGHT JOINT. IN ALL INSTANCES,
INSTALLATION OF BIOFILTRATION UNIT SHALL CONFORM TO ASTM SPECIFICATION C891
"STANDARD PRACTICE FOR INSTALLATION OF UNDERGROUND PRECAST UTILITY
STRUCTURES", UNLESS DIRECTED OTHERWISE IN CONTRACT DOCUMENTS.
7. THE CONTRACTOR IS RESPONSIBLE FOR INLET PROTECTION/SEDIMENT CONTROL AND
CLEANING AROUND EACH BIOFILTRATION SYSTEM TYPE C UNIT.
8. ACTIVATION OF THE BIOFILTRATION SYSTEM TYPE C UNIT IS PERFORMED ONLY BY THE
SUPPLIER. CONTRACTOR IS RESPONSIBLE FOR BIOFILTRATION TYPE C INLET
PROTECTION AND SUBSEQUENT CLEAN OUT COST. THIS PROCESS CANNOT COMMENCE
UNTIL THE AREA TRIBUTARY TO THE UNIT IS FULLY STABILIZED AND CLEANED (FULL
LANDSCAPING, GRASS COVER, FINAL PAVING AND STREET SWEEPING COMPLETED),
NEGATING THE CHANCE OF CONSTRUCTION MATERIALS CONTAMINATING THE
BIOFILTRATION TYPE C SYSTEM. CARE SHALL BE TAKEN DURING CONSTRUCTION NOT
TO DAMAGE THE PROTECTIVE THROAT AND TOP PLATES.
9. BIOFILTRATION SYSTEM TYPE C SHALL CONSIST OF PRE -CAST VAULT WITH
BIOFILTRATION MEDIA, OUTLET CHAMBER AND AN INTERNAL FLOW BYPASS SYSTEM.
THE TREATMENT SHALL BE IN ACCORDANCE WITH DESIGN DATA AND INFORMATION
CONTAINED IN THIS DRAWING AND THE CONTRACT DOCUMENTS. CONTRACTOR TO
CONFIRM TREATMENT SYSTEM MEETS REQUIREMENTS OF THE PROJECT.
10.BIOFILTRATION SYSTEM TYPE C SHALL HAVE GENERAL USE LEVEL DESIGNATION (GULD)
AND CERTIFICATION FROM THE WASHINGTON STATE DEPARTMENT OF ECOLOGY FOR
BASIC AND METALS TREATMENT.
11.MANUFACTURER TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE.
12.FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS, WEIGHTS, AND
ACCESSORIES, CONTACT MANUFACTURER.
BIO FILTRATION TYPE C UNITS SCHEDULE
I C I
�d
OUTLET
ALTERNATE ORIENTATION
NOT TO SCALE
CONSTRUCTION NOTES
CONTROL POINT 1 O4
--- D �r
CONTROL POINT 2 O4
O CONTRACTOR SHALL SAWCUT AND REMOVE EXISTING CURB AND GUTTER AS
NECESSARY TO INSTALL BIOFILTRATION SYSTEM UNIT AND TRANSITIONAL CURB.
O CONTRACTOR SHALL CAST IN PLACE NEW CEMENT CONCRETE GUTTER AND CURB
AS NEEDED. DIMENSIONS SHOWN ARE APPROXIMATE AND SHALL BE FIELD
VERIFIED. NEW CURB AND GUTTER SHALL TRANSITION SMOOTHLY TO MATCH
EXISTING GRADES AND FEATURES INCLUDING CURB, GUTTER, AND PAVEMENT.
O3 INTERIOR FEATURES OF BIOFILTRATION TYPE C UNIT ARE TYPICALLY PROVIDED BY
MANUFACTURER AND ARE SHOWN FOR REFERENCE ONLY.
4O STATION/OFFSET CONTROL POINTS FOR BIOFILTRATION TYPE C UNITS ARE TO THE
CORNER OF EACH UNIT AT OUTER FACE OF PRECAST WALL. UNIT ALIGNMENT IS
ORIENTED PARALLEL TO CURB LINE: LOCATIONS ARE APPROXIMATE, CONTRACTOR
TO FIELD VERIFY.
GENERAL BIOFILTRATION TYPE C NOTES cy)
N
1 1. BIOFILTRATION SYSTEM TYPE C WITHOUT PLANTS SHALL HAVE SOLID CONCRETE TOP N
SLAB AND ACCESS HATCHES MEETING LOADING REQUIREMENTS PER SCHEDULE TABLE I O
BELOW. 't
N
2. BIOFILTRATION SYSTEM TYPE C UNIT TOP ELEVATION AND THROAT OPENING CU
ELEVATIONS ARE APPROXIMATE. CONTRACTOR TO FIELD VERIFY UNIT ELEVATIONS AND
SET UNIT ELEVATIONS TO ACHIEVE REQUIRED GRADES FROM EXISTING GUTTER.
3. IF THE BIOFILTRATION SYSTEM TYPE C UNIT IS STORED BEFORE INSTALLATION, THE
TOP SLAB MUST BE PLACED ON THE BOX USING THE 2X4 WOOD PROVIDED, TO PREVENT
ANY CONTAMINATION FROM THE SITE. ALL INTERNAL FITTINGS SUPPLIED (IF ANY), MUST
BE LEFT IN PLACE AS PER THE DELIVERY.
4. THE UNIT SHALL BE PLACED ON A COMPACTED SUB -GRADE WITH A MINIMUM 6-INCH
CSTC. THE UNIT IS TO BE PLACED SUCH THAT THE UNIT AND TOP SLAB MATCH THE
GRADE OF THE CURB IN THE AREA OF THE UNIT. COMPACT UNDISTURBED SUB -GRADE
MATERIALS TO 95% OF MAXIMUM DENSITY AT +1 TO 2% OF OPTIMUM MOISTURE.
UNSUITABLE MATERIAL BELOW SUB -GRADE SHALL BE REPLACED TO THE ENGINEER'S
APPROVAL.
5. OUTLET CONNECTIONS SHALL BE ALIGNED AND SEALED TO MEET THE APPROVED
DRAWINGS WITH MODIFICATIONS NECESSARY TO MEET SITE CONDITIONS AND CITY
STANDARDS.
6. ONCE THE UNIT IS SET, THE INTERNAL WOODEN FORMS AND PROTECTIVE MESH COVER
MUST BE LEFT INTACT. REMOVE ONLY THE TEMPORARY WOODEN SHIPPING BLOCKS
BETWEEN THE BOX AND THE TOP SLAB. THE TOP LID SHOULD BE SEALED ONTO THE
BOX SECTION BEFORE BACKFILLING, USING A NON -SHRINK GROUT, BUTYL RUBBER OR
SIMILAR WATERPROOF SEAL. THE BOARDS ON TOP OF THE LID AND BOARDS SEALED IN
THE UNIT'S THROAT MUST NOT BE REMOVED. THE SUPPLIER (AMERICAST OR ITS
AUTHORIZED DEALER) WILL REMOVE THESE SECTIONS AT THE TIME OF ACTIVATION.
BACKFILLING SHOULD BE PERFORMED IN A CAREFUL MANNER, BRINGING THE
APPROPRIATE FILL MATERIAL UP IN 6" LIFTS ON ALL SIDES. PRECAST SECTIONS SHALL
BE SET IN A MANNER THAT WILL RESULT IN A WATERTIGHT JOINT. IN ALL INSTANCES,
INSTALLATION OF BIOFILTRATION UNIT SHALL CONFORM TO ASTM SPECIFICATION C891
"STANDARD PRACTICE FOR INSTALLATION OF UNDERGROUND PRECAST UTILITY
STRUCTURES", UNLESS DIRECTED OTHERWISE IN CONTRACT DOCUMENTS.
7. THE CONTRACTOR IS RESPONSIBLE FOR INLET PROTECTION/SEDIMENT CONTROL AND
CLEANING AROUND EACH BIOFILTRATION SYSTEM TYPE C UNIT.
8. ACTIVATION OF THE BIOFILTRATION SYSTEM TYPE C UNIT IS PERFORMED ONLY BY THE
SUPPLIER. CONTRACTOR IS RESPONSIBLE FOR BIOFILTRATION TYPE C INLET
PROTECTION AND SUBSEQUENT CLEAN OUT COST. THIS PROCESS CANNOT COMMENCE
UNTIL THE AREA TRIBUTARY TO THE UNIT IS FULLY STABILIZED AND CLEANED (FULL
LANDSCAPING, GRASS COVER, FINAL PAVING AND STREET SWEEPING COMPLETED),
NEGATING THE CHANCE OF CONSTRUCTION MATERIALS CONTAMINATING THE
BIOFILTRATION TYPE C SYSTEM. CARE SHALL BE TAKEN DURING CONSTRUCTION NOT
TO DAMAGE THE PROTECTIVE THROAT AND TOP PLATES.
9. BIOFILTRATION SYSTEM TYPE C SHALL CONSIST OF PRE -CAST VAULT WITH
BIOFILTRATION MEDIA, OUTLET CHAMBER AND AN INTERNAL FLOW BYPASS SYSTEM.
THE TREATMENT SHALL BE IN ACCORDANCE WITH DESIGN DATA AND INFORMATION
CONTAINED IN THIS DRAWING AND THE CONTRACT DOCUMENTS. CONTRACTOR TO
CONFIRM TREATMENT SYSTEM MEETS REQUIREMENTS OF THE PROJECT.
10.BIOFILTRATION SYSTEM TYPE C SHALL HAVE GENERAL USE LEVEL DESIGNATION (GULD)
AND CERTIFICATION FROM THE WASHINGTON STATE DEPARTMENT OF ECOLOGY FOR
BASIC AND METALS TREATMENT.
11.MANUFACTURER TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE.
12.FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS, WEIGHTS, AND
ACCESSORIES, CONTACT MANUFACTURER.
BIO FILTRATION TYPE C UNITS SCHEDULE
ID #
TREATMENT
OFFLINE 15 MIN WQ
PEAK FLOW
STATION/OFFSET
VAULT
TREATMENT
INLET
OUTLET
LOADING
REQUIREMENT
FLOW RATE (CFS)
RATE (CFS)
DIMENSIONS
AREA
ORIENTATION
ORIENTATION
REQUIREMENTS
CONTROL POINT 1
CONTROL POINT 2
DIMENSIONS
HARDIE 309+03.42,
HARDIE 309+04.90,
FIL-3
METALS BASIC
0.028
0.116
38.40 RT
34.48 RT
61 x 4'W
41 x 4'W
NA, GRATE
C
HS-25
GRADY 154+95.55,
GRADY 155+00.55,
FIL-4
METALS BASIC
0.134
0.534
28.40 LT
28.40 LT
81 x 4'W
61 x 4'W
C
C
HS-25
GRADY 155+15.76,
GRADY 155+20.76,
FIL-5
METALS BASIC
0.085
0.361
28.40 LT
28.40 LT
61 x 4'W
41 x 4'W
A
A
HS-25
STC 615+56.31,
STC 615+63.31,
FIL-8
METALS BASIC
0.283
1.121
17.97 RT
17.97 RT
101 X 6'W
8'L X 6'W
C,D
C
HS-20
STC 616+48.18,
STC 616+49.76,
FIL-9
METALS BASIC
0.018
0.066
47.98 RT
43.23 RT
61 X 4'W
4'L X4'W
A
B
HS-30
STC 617+14.41,
STC 617+07.41,
FIL-10
METALS BASIC
0.212
0.780
16.73 RT
16.73 RT
81 X 6'W
6'L X 6'W
A
A
HS-30
SUBMITTED BY:
6-9-2025 R. PARGAS
R-4332158
DEVELOPMENT ENGINEERING
msippo 11 /25/2025 wl
SCALE: DRAWING No.:
NTs STRIDE BUS RAPID TRANSIT
FILENAME: SOUTH RENTON TRANSIT CENTER BT120-CDD503
.5r.RIDE lu) _j Lu J S1-BT120-CDD501-507 BT105 FACILITY ID:
BRT General Engineering Consultant z CONTRACT No.: BT120
SOUNDTRANSIT RTA/CN 0205-24 CIVIL SHEET No.: REV:
DATE: REVIEWED BY: DATE: DATE: BT120-CDD503
182 1
12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024
4
A
H
H
H
C'7
C'7
N
O
0
I
N
Q
D
J