Loading...
HomeMy WebLinkAboutR-4332179Ap Xrefs: M xS1-BT120-LHP xS1-BT120-CMP xS1-BT120-CPP 0 xBRT-CUD05-T xS1-BT120-VSF xS1-BT120-VRX xS1-BT120-GZK 0 xS1-BT120-CDP 1 1 xS1-BT120-APP uj xS1-BT120-CAP xS1-BT120-GZK GB-SEAL-TRW21032616 0 N 0 p J 0 N m 0 N_ CO c+') It 0 r) H W Y >J I w w 06 J m >Q I U) 0o -o � U �(D N z cN Y r> N M N a_ o U Q le r Q r Qa H = c/) J � O Q N Q � � m �0 W Z_ Q J LV = W H � Q GENERAL NOTES: KEY NOTES: LEGEND 1. SEE SHEETS BT120-CSP101-106, 201-205 FOR SITE O INSTALL CEMENT CONCRETE PAVEMENT WITH INTEGRAL COLOR, WSDOT AMS-STD 20227 =:.�s. S EXTERIOR CONCRETE FINISH: PREP PLANS. j' .::' '.::��-°•�::; s-��_; s: a;. MEDIUM ETCHED; INTEGRAL COLOR, WSDOT AMS-STD 20227 2. SEE SHEETS BT120-CDP101-106, 201-205 FOR O INSTALL CEMENT CONCRETE PAVEMENT WITH DRAINAGE PLANS. BROOM FINISH AND COLD JOINT PATTERN PER PLANS. EXTERIOR CONCRETE FINISH: 3. SEE SHEET BT120-CPP101-106, 201-205 FOR PAVING -- i ---�-- LIGHT BROOM; STD GRAY PLANS. O INSTALL CEMENT CONCRETE PAVEMENT PER CITY OF RENTON STD PLAN 102 4. SEE SHEET LHS101-103 FOR WALL AND BOULDER + COBBLE POINT TABLES. RIVER ROCK PATTERN: (ov-P WSDOT BOMANITE RIVER ROCK 0 12/10/2024 TW ILF ILF JISSUEDFORBID No. I DATE DSN CHK APP REVISION DESIGNED BY: T. WALKER DRAWN BY: T. WALKER CHECKED BY: L. FRENCH APPROVED BY: L. FRENCH 107 WALL POINT Jacobs SUBMITTED BY: R. PARGAS Q Q _.5r)?IDE co co Lu BRT General Engineering Consultant z SOUNDTRANSIT DATE: REVIEWED BY: DATE: 12/10/2024 J. ALTCHECH 12/10/2024 SCALE: 1 "=20' FILENAME: S1-BT120-LHP102-106 CONTRACT No.: RTA/CN 0205-24 DATE: 12/10/2024 KEY MAP CURRENT PLANNING ul ' jding 11/05/2025 DEVELOPMENT ENGINEERING msippo 11 /25/2025 wl 20 10 0 20 40 SCALE IN FEET STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 LANDSCAPE HARDSCAPE PLAN GRADY STA 156+50 TO GRADY STA 160+46.15 R-4332179 DRAWING No.: BT120-LHP105 FACILITY ID: BT120 SHEET No.: REV: 274 0 C'7 N T N 0 0 N CU LO V J 0 0 0 0 T rr n cy) co N O O O Q J