Loading...
HomeMy WebLinkAboutR-4332194N co xrefs: co xS1-BT120-LHP xS1-BT120-CMP xS1-BT120-CPP O xBRT-CUD05-T xS1-BT120-VRX xS1-BT120-GZK xS1-BT120-APP 0 xS1-BT120-CDP 1 1 xS1-BT120-VSF Uj xS1-BT120-LHD xS1-BT120-CGP GB-SEAL-TRW21032616 C� 0 rn CD CD 2 J CD N_ H m 0 co co 0 0 w J Q i � w � 3 w 06 Q m� �U) m —o U a a N Z LO Y N N 0 o U No. I —J PAVING LAYOUT ENLARGMENT 5 SCALE: 1" = 10' PAVING LAYOUT ENLARGMENT 6 SCALE: 1" = 10' I FrFIVn 12/10/2024 1 TW DATE IDSN LF ILF CHK I APP RIVER COBBLE EXPANSION JOINT CONTROL JOINT BOULDER POINT ISSUED FOR BID REVISION BOULDER SCHEDULE: Q 2-MAN BOULDER Q 3-MAN BOULDER Q 4-MAN BOULDER BT120-LHD101 N%-J GENERAL NOTES: 1. SEE SHEET BT120-CPP101-106, 201-205 FOR PAVING PLANS. 2. SEE SHEET LHS101-103 FOR WALL AND BOULDER + COBBLE POINT TABLES. DESIGNED BY: T. WALKER oPs wgti, R 000 DRAWN BY: T. WALKER CHECKED BY: L. FRENCH �O�g1vDScp,? P- APPROVED BY: L. FRENCH BT120-LHD101 y.1 Jacobs SUBMITTED BY: R. PARGAS Q Q sr.RIDE co U) W J BRT General Engineering Consultant z sovwrRaivsir DATE: REVIEWED BY: DATE: 12/10/2024 1 J. ALTCHECH 12/10/2024 SCALE: 1 "=10' FILENAME: S1-BT120-LHD101-109 CONTRACT No.: RTA/CN 0205-24 DATE: 12/10/2024 F ENT PLANNINGing 11 /05/2025 U1 DEVELOPMENT ENGINEERING ` w'%- msippo 11 /25/2025 m m 10 5 0 10 20 SCALE IN FEET STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 LANDSCAPE HARDSCAPE DETAILS R-4332194 DRAWING No.: BT120-LHD105 FACILITY ID: BT120 SHEET No.: REV: 289 0 c'7 N T N 0 0 N CU 0) 0 0 0 T co co N O O O N Q J