HomeMy WebLinkAboutR-4332240N
C'7
C'M
0
w
LO
0
N
O
N
0
N
m
0
N
co
co
0
0
w
z
ry
co w
rn
CO w
w m
z
co
— U
d
C) z
o _
Y
o
N
o U
I
I
I
------ ---- ---- ---- ---- ---- -
I
I
w,-e B -
� I
I
/
/
/
/
/
/
/r
-----------------
" "BT120-SC-41
BT120-HH-28
I I
18 B 120- AM- 6
120-SC-40
BT120-SC-38
11 BT120-CAM-07 BT120-SC-39 6.50'
- - - - - - co_ 2 BT120-HH-11
Fri I I\ `U
m I �'�
l mj
m I I so
I
I
I
I
I
o
I
1 I
t
I
I
�
i
O
m
I 5.42' N
I I
\ I BT120-SC-36
BT120-SC-37 BT120-JCP208
CO
I
Vr-----,--------------------------------------------r----------------------',----------------------�
II 4
I I \ I
•. I
m I �i i I II I I
I �I
BAY5 '
�� I II I - I I
II
- - - -i- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - � - - - L - - - - - - - - - - - - - - - - - - - - - r' - - - - - - - - - - - - - - - - i- - - - -
I
I I I I
I I 0 I I I
U)
I I ! I
I I I I
I I I I
I I I I
I I I I
I I I
I I I I
I I I I
I I I o I
I I I
I I I I
I I I I tip"
I I
I I I
I I
I I
I I
I I
CONSTRUCTION NOTES:
1O STUB -UP CONDUIT IN LIGHT POLE FOUNDATION. INSTALL CAMERA, BRACKET, AND ALL
ASSOCIATED CABLING ON PEDESTRIAN LUMINAIRE. SEE DWG BT120-JCD202 FOR
DETAILS. CONFIGURE ALL CAMERA INSTALLATIONS AS SPECIFIED IN THE CAMERA
INSTALLATION SCHEDULE ON BT120-JCD211, ADHERING TO INDIVIDUAL SETTINGS FOR
FOCAL LENGTH, ORIENTATION, AND OTHER PARAMETERS. CONTRACTOR SHALL
ENSURE PROPER MOUNTING, WIRING, AND NETWORK INTEGRATION OF EACH CAMERA
IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND PROJECT
SPECIFICATIONS.
2O INSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD DETAIL J-40.10-04.
18 STUB -UP CONDUIT IN FENCE POST. INSTALL CAMERA AND ALL ASSOCIATED CABLING
ON EXTENDED FENCE POST. SEE DWG BT120-JCD203 FOR DETAILS. CONFIGURE ALL
CAMERA INSTALLATIONS AS SPECIFIED IN THE CAMERA INSTALLATION SCHEDULE ON
BT120-JCD211, ADHERING TO INDIVIDUAL SETTINGS FOR FOCAL LENGTH,
ORIENTATION, AND OTHER PARAMETERS. CONTRACTOR SHALL ENSURE PROPER
MOUNTING, WIRING, AND NETWORK INTEGRATION OF EACH CAMERA IN ACCORDANCE
WITH MANUFACTURER'S INSTRUCTIONS AND PROJECT SPECIFICATIONS. SEE
BT120-CRD125 DETAIL B FOR CONDUIT ENTRY INTO FENCE.
MATCHLINE: STA 14+20
SEE DWG BT120-JCP204
CONDUIT AND WIRING SCHEDULE
CONDUIT
TAG
EQUIPMENT
CONDUIT
SIZE
WIRE
TYPE
REMARK
COMMENTS
FROM
To
BT120-SC-36
BT120-HH-113
BT120-HH-11
2"
2-CAT6
ST
SITE CAMERA
BT120-SC-37
BT120-HH-113
BT120-HH-11
2"
SPARE
ST
SITE CAMERA
BT120-SC-38
BT120-HH-28
BT120-HH-11
2"
2-CAT6
ST
SITE CAMERA
BT120-SC-39
BT120-HH-28
BT120-HH-11
2"
SPARE
ST
SITE CAMERA
BT120-SC-40
BT120-HH-28
BT120-CAM-07
2"
1-CAT6
ST
SITE CAMERA
BT120-SC-41
BT120-HH-28
BT120-CAM-06
2"
1-CAT6
ST
SITE CAMERA
1 _�
BT120-JCP209
I NCi
Li I o`pJ
� � u
I 103 I
L I I
I
02 201 107
202 106
s
� . 204
05 105
01 10�
�vv
cc I
I
CO
DESIGNED BY: SCALE:
M. COX J 1"=20'
DRAWN BY: �oZ
`�`. ;r !^_/Q FILENAME:
P.5r.RIDE
ARCADIS
W. TURNER w J S1-BT120-JCP201-205
CHECKED BY: BRT General Engineering Consultant SOUNDTMNSIT CONTRACT No.:
1 6/13/2025 MC SW MC ADDENDUM #1 S. WHITE RTA/CN 0205-24
0 12/10/2024 MC SW MC ISSUED FORBID APPROVED BY: WITTED BY: DATE: REVIEWED BY: DATE: DATE:
No. DATE DSN CHK APP REVISION M. COX 06/10/2025 PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024
20 10 0 20 40
KEY MAP r mSCALE IN FEET
DEVELOPMENT ENGINEERING
msippo 11 /25/2025 R-4332240
STRIDE BUS RAPID TRANSIT DRAWING No.:
SOUTH RENTON TRANSIT CENTER BT120-JCP202
BT105 FACILITY ID:
SYSTEMS BT120
SHEET No.: REV:
SITE COMMUNICATION PLAN
S RENTON TRANSIT CENTER 335 1
C'7
N
T
N
O
N
CU
H
H
H
N
d
cy)
O
O
N
Q
J