Loading...
HomeMy WebLinkAboutR-4332242N CM O i 0 w Aw A LO N 0 N a_ 0 N m 0 N Q0 co Ill - CD 0 N X O X w I co O cry w �OZ5 X CO O c/)I U 00 — O U d Q Z N Y U-, 1 o 0 o U No 1 I� BT120-SC-60 — BT120-SC-61 BT120-SC-103 BT120-SC-104 OwG rcti ?p, J Cp?� (!) BT120-SC-54 BT120-SC-55 BT120-HH-22(2 _LO _ N 2� BT120-SC- 1 8 BT120-CAM-10 1y BT120-HH-19 11 ti ti I N I I I I I I I I I BT120-SC-82 I BT120-SC-83 I I I I I I I I .� GNLINE �CP jp4 M G BT 120 SEE pW MATCHLINE SEE DWG BT120-JCP202 BT120-SC-77 rn BT120-SC-78 1 1 i 2 BT120-HH-21 \ \ -- BT120-SC-79 BT120-CAM-120 15 CONDUIT AND WIRING SCHEDULE CONDUIT TAG EQUIPMENT CONDUIT SIZE WIRE TYPE REMARK COMMENTS FROM TO BT120-SC-54 BT120-HH-14 BT120-HH-18 2" 4-CAT6 ST SITE CAMERA BT120-SC-55 BT120-HH-14 BT120-HH-18 2" SPARE ST SITE CAMERA BT120-SC-60 BT120-HH-17 BT120-HH-22 2" SPARE KCM SITE FIBER BT120-SC-61 BT120-HH-17 BT120-HH-22 2" SPARE KCM SITE FIBER BT120-SC-75 BT120-HH-18 BT120-HH-21 2" SPARE ST SITE CAMERA BT120-SC-76 BT120-HH-18 BT120-HH-21 2" SPARE ST SITE CAMERA BT120-SC-77 BT120-HH-18 BT120-HH-20 2" 2-CAT6 ST SITE CAMERA BT120-SC-78 BT120-HH-18 BT120-HH-20 2" SPARE ST SITE CAMERA BT120-SC-79 BT120-HH-20 BT120-CAM-12 2" 1-CAT6 ST SITE CAMERA BT120-SC-80 BT120-HH-20 BT120-HH-05 2" 1-CAT6 ST SITE CAMERA BT120-SC-81 BT120-HH-20 BT120-HH-05 2" SPARE ST SITE CAMERA BT120-SC-82 BT120-HH-18 BT120-HH-19 2" 1-CAT6 ST SITE CAMERA BT120-SC-83 BT120-HH-18 BT120-HH-19 2" SPARE ST SITE CAMERA BT120-SC-84 BT120-HH-19 BT120-CAM-10 2" 1-CAT6 ST SITE CAMERA LJ cn m m v �I 000 �r CD Z `T 0 c / , / / / / , / BT120-SC-85 / BT120- C-8 i_•• A �k CONSTRUCTION NOTES: STUB -UP CONDUIT IN LIGHT POLE FOUNDATION. INSTALL CAMERA, BRACKET, AND ALL ASSOCIATED CABLING ON PEDESTRIAN LUMINAIRE. SEE DWG BT120-JCD202 FOR GJ� DETAILS. CONFIGURE ALL CAMERA INSTALLATIONS AS SPECIFIED IN THE CAMERA INSTALLATION SCHEDULE ON BT120-JCD211, ADHERING TO INDIVIDUAL SETTINGS FOR FOCAL LENGTH, ORIENTATION, AND OTHER PARAMETERS. CONTRACTOR SHALL ENSURE PROPER MOUNTING, WIRING, AND NETWORK INTEGRATION OF EACH CAMERA 120-SC-8 IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND PROJECT BT120-SC-81— SPECIFICATIONS. 2 BT120-HH-20 l O INSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD DETAIL J-40.10-04. < M- , NLIN �•Cp�p5 11 INSTALL TYPE 5 HEAVY DUTY JUNCTION BOX WITH TRAFFIC RATED LID PER WSDOT G BT 120 STANDARD DETAIL J 40.20 03. W SEE p 15 INSTALL POE EXTENDER AND ASSOCIATED POLE -MOUNTED JUNCTION BOX. SEE DETAILS ON DWG BT120-JCD202. CONDUIT AND WIRING SCHEDULE CONDUIT TAG EQUIPMENT CONDUIT SIZE WIRE TYPE REMARK COMMENTS FROM TO BT120-SC-85 BT120-HH-18 BT120-HH-30 2" 1-CAT6 ST SITE CAMERA BT120-SC-86 BT120-HH-18 BT120-HH-30 2" SPARE ST SITE CAMERA BT120-SC-103 BT120-HH-16 BT120-HH-31 2" SPARE ST SITE CAMERA BT120-SC-104 BT120-HH-16 BT120-HH-31 2" SPARE ST SITE CAMERA BT120-SC-105 BT120-HH-31 BT120-CAM-19 2" 1 1-CAT6 ST SITE CAMERA DESIGNED BY: M. COX DRAWN BY: or• WAS If 04ARCADISW.TURNER 45CHECKED BY: BRT General Engineering Consultant 06/13/2025 MC SW MC ADDENDUM #1 S. WHITE 12/10/2024 MC SW MC ISSUED FOR BID APPROVED BY: �ro`� �. BUTTED BY: DATE: REVIEWED BY: DATE DSN CHK APP REVISION M. COX 06/10/2025 PARGAS 12/10/2024 J. ALTCHECH 17 INSTALL TYPE 8 JUNCTION BOX PER WSDOT STANDARD DETAIL J-40.30-04. 18 STUB UP CONDUIT AND CAP TO FENCE POST FOR FUTURE WIRELESS ACCESS POINT INSTALLATION ��� t - �4 N c) 0 I Lu 4 SW 7 Li 103 I ( I L- I 102 201 1 107 1 s106 203 LU'+ _ 05 105 101 %nj P-. I I c ' SCALE: 1 "=20' Q Lu J FILENAME: Q C/)� w J S1-BT120-JCP201-205 z S0UjVDTMNSIT CONTRACT No.: RTA/CN 0205-24 DATE: DATE: 12/10/2024 12/10/2024 KEY MAP 20 10 0 20 40 SCALE IN FEET DEVELOPMENT ENGINEERING R-4332242 msippo 11 /25/2025 STRIDE BUS RAPID TRANSIT DRAWING No.: SOUTH RENTON TRANSIT CENTER BT120-JCP204 BT105 FACILITY ID: SYSTEMS BT120 SHEET No.: REV: SITE COMMUNICATION PLAN S RENTON TRANSIT CENTER 337 1 C'7 N O O N CU N d C'7 O O N Q J