HomeMy WebLinkAboutR-4332242N
CM
O
i
0
w
Aw
A
LO
N
0
N
a_
0
N
m
0
N
Q0
co
Ill -
CD
0
N
X
O
X
w
I
co O
cry w
�OZ5
X CO
O c/)I
U 00
— O
U
d Q
Z
N Y
U-, 1
o 0
o U No
1
I� BT120-SC-60 —
BT120-SC-61
BT120-SC-103
BT120-SC-104
OwG rcti
?p, J
Cp?�
(!) BT120-SC-54
BT120-SC-55
BT120-HH-22(2
_LO
_ N
2�
BT120-SC- 1 8 BT120-CAM-10
1y
BT120-HH-19 11
ti
ti
I N
I
I
I
I
I
I
I
I
I
BT120-SC-82
I BT120-SC-83
I
I
I
I
I
I
I
I
.� GNLINE �CP jp4
M G BT 120
SEE pW
MATCHLINE
SEE DWG BT120-JCP202
BT120-SC-77
rn
BT120-SC-78
1
1
i 2 BT120-HH-21 \ \ --
BT120-SC-79
BT120-CAM-120 15
CONDUIT AND WIRING SCHEDULE
CONDUIT
TAG
EQUIPMENT
CONDUIT
SIZE
WIRE
TYPE
REMARK
COMMENTS
FROM
TO
BT120-SC-54
BT120-HH-14
BT120-HH-18
2"
4-CAT6
ST
SITE CAMERA
BT120-SC-55
BT120-HH-14
BT120-HH-18
2"
SPARE
ST
SITE CAMERA
BT120-SC-60
BT120-HH-17
BT120-HH-22
2"
SPARE
KCM
SITE FIBER
BT120-SC-61
BT120-HH-17
BT120-HH-22
2"
SPARE
KCM
SITE FIBER
BT120-SC-75
BT120-HH-18
BT120-HH-21
2"
SPARE
ST
SITE CAMERA
BT120-SC-76
BT120-HH-18
BT120-HH-21
2"
SPARE
ST
SITE CAMERA
BT120-SC-77
BT120-HH-18
BT120-HH-20
2"
2-CAT6
ST
SITE CAMERA
BT120-SC-78
BT120-HH-18
BT120-HH-20
2"
SPARE
ST
SITE CAMERA
BT120-SC-79
BT120-HH-20
BT120-CAM-12
2"
1-CAT6
ST
SITE CAMERA
BT120-SC-80
BT120-HH-20
BT120-HH-05
2"
1-CAT6
ST
SITE CAMERA
BT120-SC-81
BT120-HH-20
BT120-HH-05
2"
SPARE
ST
SITE CAMERA
BT120-SC-82
BT120-HH-18
BT120-HH-19
2"
1-CAT6
ST
SITE CAMERA
BT120-SC-83
BT120-HH-18
BT120-HH-19
2"
SPARE
ST
SITE CAMERA
BT120-SC-84
BT120-HH-19
BT120-CAM-10
2"
1-CAT6
ST
SITE CAMERA
LJ
cn
m
m
v
�I
000
�r
CD Z
`T
0
c
/
,
/
/
/
/
,
/
BT120-SC-85 /
BT120- C-8
i_•• A
�k CONSTRUCTION NOTES:
STUB -UP CONDUIT IN LIGHT POLE FOUNDATION. INSTALL CAMERA, BRACKET, AND ALL
ASSOCIATED CABLING ON PEDESTRIAN LUMINAIRE. SEE DWG BT120-JCD202 FOR
GJ� DETAILS. CONFIGURE ALL CAMERA INSTALLATIONS AS SPECIFIED IN THE CAMERA
INSTALLATION SCHEDULE ON BT120-JCD211, ADHERING TO INDIVIDUAL SETTINGS FOR
FOCAL LENGTH, ORIENTATION, AND OTHER PARAMETERS. CONTRACTOR SHALL
ENSURE PROPER MOUNTING, WIRING, AND NETWORK INTEGRATION OF EACH CAMERA
120-SC-8 IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND PROJECT
BT120-SC-81— SPECIFICATIONS.
2 BT120-HH-20
l O INSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD DETAIL J-40.10-04. <
M- , NLIN �•Cp�p5 11 INSTALL TYPE 5 HEAVY DUTY JUNCTION BOX WITH TRAFFIC RATED LID PER WSDOT
G BT 120 STANDARD DETAIL J 40.20 03.
W
SEE p 15 INSTALL POE EXTENDER AND ASSOCIATED POLE -MOUNTED JUNCTION BOX. SEE
DETAILS ON DWG BT120-JCD202.
CONDUIT AND WIRING SCHEDULE
CONDUIT
TAG
EQUIPMENT
CONDUIT
SIZE
WIRE
TYPE
REMARK
COMMENTS
FROM
TO
BT120-SC-85
BT120-HH-18
BT120-HH-30
2"
1-CAT6
ST
SITE CAMERA
BT120-SC-86
BT120-HH-18
BT120-HH-30
2"
SPARE
ST
SITE CAMERA
BT120-SC-103
BT120-HH-16
BT120-HH-31
2"
SPARE
ST
SITE CAMERA
BT120-SC-104
BT120-HH-16
BT120-HH-31
2"
SPARE
ST
SITE CAMERA
BT120-SC-105
BT120-HH-31
BT120-CAM-19
2"
1 1-CAT6
ST
SITE CAMERA
DESIGNED BY:
M. COX
DRAWN BY: or• WAS
If 04ARCADISW.TURNER 45CHECKED BY: BRT General Engineering Consultant
06/13/2025 MC SW MC ADDENDUM #1 S. WHITE
12/10/2024 MC SW MC ISSUED FOR BID APPROVED BY: �ro`� �. BUTTED BY: DATE: REVIEWED BY:
DATE DSN CHK APP REVISION M. COX 06/10/2025 PARGAS 12/10/2024 J. ALTCHECH
17 INSTALL TYPE 8 JUNCTION BOX PER WSDOT STANDARD DETAIL J-40.30-04.
18 STUB UP CONDUIT AND CAP TO FENCE POST FOR FUTURE WIRELESS ACCESS POINT
INSTALLATION
��� t - �4
N c) 0 I
Lu
4 SW 7 Li
103
I ( I
L-
I
102 201 1 107 1
s106
203
LU'+
_ 05 105
101
%nj P-.
I I
c '
SCALE:
1 "=20'
Q Lu J
FILENAME:
Q
C/)�
w J
S1-BT120-JCP201-205
z
S0UjVDTMNSIT
CONTRACT No.:
RTA/CN 0205-24
DATE:
DATE:
12/10/2024
12/10/2024
KEY MAP
20 10 0 20 40
SCALE IN FEET
DEVELOPMENT ENGINEERING
R-4332242 msippo 11 /25/2025
STRIDE BUS RAPID TRANSIT DRAWING No.:
SOUTH RENTON TRANSIT CENTER BT120-JCP204
BT105 FACILITY ID:
SYSTEMS BT120
SHEET No.: REV:
SITE COMMUNICATION PLAN
S RENTON TRANSIT CENTER 337 1
C'7
N
O
O
N
CU
N
d
C'7
O
O
N
Q
J