Loading...
HomeMy WebLinkAbout2_01-3 Facilities DivisionActive Project List Public Works Facilities Division Council RetreatFriday, February 20, 2026Martin Pastucha, Administrator List of Project Project Name Location / Department Status Pre Design Design Bid Construction Renton Market TI Renton Market Active  Museum TI Museum Active  HMAC Playground HMAC Active  Don Persons Senior Center Project Senior Center Active  New Park Shop TBD Active  Resource Center TBD Active  HMAC Boiler Replacement HMAC Active  City Hall Customer Service Center City Hall Active  ESCO Phase 4 Citywide Active  EV Charger Install City Hall / PW Shops Active  City Wide Fire Contract Citywide Active  Elevator Contract (DES)Citywide Active  Fire Pump Repair City Hall Active  Carco Theater Flood Carco Theater Active  RCC Gutter Repair RCC Active  Fence Repair – PW Shops PW Shops Active  Roof Repair at Edlunds Edlunds Active  West & East Parking Garage Updates (PD)Parking Garage Active  Generator Maintenance Contract (DES)Citywide Active  RCC Fire System Repair RCC Active  4th Floor Door Readers City Hall Active  List of Project Project Name Location/Department Status Pre Design Design Bid Construction City Hall Roof Replacement City Hall Active  Window Repairs – Downtown Parking Garage Parking Garage Active  HVAC PM Agreements (City Hall, RCC, PW Shops)Multiple Facilities Active  New Readers – PW Shops Front Gate PW Shops Active  Cubicle – CED 6th Floor City Hall Active  Cubicle – 1st Floor IT City Hall Active  Cubicle - 4th Floor IT City Hall Active  Cubicle – 6th Floor Parks & Rec City Hall Active  PD Break Room – 1st Floor City Hall Active  PD Gordon Office Update – 1st Floor City Hall Active  PW Shops Jeff P Office PW Shops Active  Cubicle – PD Front Counter 1st Floor City Hall Active  7th Floor Clerk’s Office City Hall Active  Master Space Planning Citywide Active  RCC Energy Audit Grant RCC Active  5th Floor Break Room Update City Hall Active  200 Mill Retro-Commissioning 200 Mill Active  CPTED City Hall Lighting City Hall Active  RCC Roof Assessment RCC Active  Camera Updates – Citywide Citywide Not Active (Planned 2026) Parks HVAC – Coulon Shops Parks / Coulon Active  PW Shops Oil Boiler PW Shops Not Active (Planned 2026) 12 14 10 7 Projects Currently Under Construction •Renton Market/Piazza •HMAC Playground •ESCO Phase 4 •Roof Repair at Edlund Property 17611 103rd Ave SE •Cubicle-IT 1st and 4th floor •CPTED City Hall Lighting Renton Market and Piazza Completion May 2026 HMAC Playground Round up of Play Equipment Completion after the season of 2026 •Playground will be on site in July •Installation will be after the season Projects out for bids •Don Persson Senior Center •Henry Mosses Aquatic Center (HMAC) Boiler Replacement •EV Charger Installation at City Hall and Maintenance Shop •City Wide Fire System •Elevator Maintenance (non-city hall) •City Hall Fire Pump Repair •Renton Community Center (RCC) Gutter Repair •Fence Repair at Maintenance Shop •Window Repairs at Downtown Parking Garage •HVAC PM Agreements for City Hall, RCC and Maintenance Shop Projects out for bid Scope of Work •Full replacement of the existing roof, replacement of all exterior siding, and complete exterior repainting to restore and protect the building envelope. •The project will also replace up to 96 windows throughout the building and repair the solarium glazing. •HVAC systems serving the building will be fully updated to improve heating and cooling performance, reliability, and occupant comfort. •Electrical upgrades as needed •The project team will also assess structural conditions and provide recommendations to support future seismic improvements and long-term capital planning. Schedule •Bid: 3/2026; award and Notice to Proceed (NTP) on 3/2026 •Construction: 4/2026 – 9/2026 (facility will not be occupied during construction) •Construction Closeout & Punch: 9/2026 – 10/2026 Don Persson Senior Center Projects in design •Renton Museum ($300k budget all in hard and soft) •Replacing Window along with reaping sills and jams •Replacing Door (if we have budget) •Repairing the structurally crack •City Hall Customer Service Center (bid to construct) •West & East Parking Garage Office Update •Cubicles: •CED •Parks & Recreation •PD 1st floor •City Clerk •Parks HVAC at Coulon Shop Projects in pre-design •New Parks Shops •Resource Center •Caro Theater Assessment •Generator Maintenance Contract •RCC Fire System Repair •City hall Roof Replacement •Door Reader (4th floor and PW Shops) •Master Place Planning •RCC Roof Assessment •Citywide Camera Update •PW Shops Oil Boiler Questions?