List of Project
Project Name Location / Department Status Pre Design Design Bid Construction
Renton Market TI Renton Market Active
Museum TI Museum Active
HMAC Playground HMAC Active
Don Persons Senior Center Project Senior Center Active
New Park Shop TBD Active
Resource Center TBD Active
HMAC Boiler Replacement HMAC Active
City Hall Customer Service Center City Hall Active
ESCO Phase 4 Citywide Active
EV Charger Install City Hall / PW Shops Active
City Wide Fire Contract Citywide Active
Elevator Contract (DES)Citywide Active
Fire Pump Repair City Hall Active
Carco Theater Flood Carco Theater Active
RCC Gutter Repair RCC Active
Fence Repair – PW Shops PW Shops Active
Roof Repair at Edlunds Edlunds Active
West & East Parking Garage Updates (PD)Parking Garage Active
Generator Maintenance Contract (DES)Citywide Active
RCC Fire System Repair RCC Active
4th Floor Door Readers City Hall Active
List of Project
Project Name Location/Department Status Pre Design Design Bid Construction
City Hall Roof Replacement City Hall Active
Window Repairs – Downtown Parking Garage Parking Garage Active
HVAC PM Agreements (City Hall, RCC, PW Shops)Multiple Facilities Active
New Readers – PW Shops Front Gate PW Shops Active
Cubicle – CED 6th Floor City Hall Active
Cubicle – 1st Floor IT City Hall Active
Cubicle - 4th Floor IT City Hall Active
Cubicle – 6th Floor Parks & Rec City Hall Active
PD Break Room – 1st Floor City Hall Active
PD Gordon Office Update – 1st Floor City Hall Active
PW Shops Jeff P Office PW Shops Active
Cubicle – PD Front Counter 1st Floor City Hall Active
7th Floor Clerk’s Office City Hall Active
Master Space Planning Citywide Active
RCC Energy Audit Grant RCC Active
5th Floor Break Room Update City Hall Active
200 Mill Retro-Commissioning 200 Mill Active
CPTED City Hall Lighting City Hall Active
RCC Roof Assessment RCC Active
Camera Updates – Citywide Citywide
Not Active
(Planned 2026)
Parks HVAC – Coulon Shops Parks / Coulon Active
PW Shops Oil Boiler PW Shops
Not Active
(Planned 2026)
12 14 10 7
Projects
Currently Under Construction
•Renton Market/Piazza
•HMAC Playground
•ESCO Phase 4
•Roof Repair at Edlund Property 17611 103rd Ave SE
•Cubicle-IT 1st and 4th floor
•CPTED City Hall Lighting
Renton Market and Piazza
Completion May 2026
HMAC Playground
Round up of Play Equipment
Completion after the season of 2026
•Playground will be on site in July
•Installation will be after the season
Projects out for bids
•Don Persson Senior Center
•Henry Mosses Aquatic Center (HMAC) Boiler Replacement
•EV Charger Installation at City Hall and
Maintenance Shop
•City Wide Fire System
•Elevator Maintenance (non-city hall)
•City Hall Fire Pump Repair
•Renton Community Center (RCC) Gutter
Repair
•Fence Repair at Maintenance Shop
•Window Repairs at Downtown Parking Garage
•HVAC PM Agreements for City Hall, RCC and Maintenance Shop
Projects out for bid
Scope of Work
•Full replacement of the existing roof, replacement of all exterior siding, and complete exterior repainting to restore and protect the building envelope.
•The project will also replace up to 96 windows throughout the building and repair the solarium glazing.
•HVAC systems serving the building will be fully updated to improve heating and cooling performance, reliability, and occupant comfort.
•Electrical upgrades as needed
•The project team will also assess structural conditions and provide recommendations to support future seismic improvements and long-term capital planning.
Schedule
•Bid: 3/2026; award and Notice to Proceed (NTP) on 3/2026
•Construction: 4/2026 – 9/2026 (facility will not be occupied during construction)
•Construction Closeout & Punch: 9/2026 – 10/2026
Don Persson Senior Center
Projects in design
•Renton Museum ($300k budget all in hard and soft)
•Replacing Window along with reaping sills and jams
•Replacing Door (if we have budget)
•Repairing the structurally crack
•City Hall Customer Service Center (bid to construct)
•West & East Parking Garage Office Update
•Cubicles:
•CED
•Parks & Recreation
•PD 1st floor
•City Clerk
•Parks HVAC at Coulon Shop
Projects in pre-design
•New Parks Shops
•Resource Center
•Caro Theater Assessment
•Generator Maintenance Contract
•RCC Fire System Repair
•City hall Roof Replacement
•Door Reader (4th floor and PW Shops)
•Master Place Planning
•RCC Roof Assessment
•Citywide Camera Update
•PW Shops Oil Boiler
Questions?