HomeMy WebLinkAboutT-4332019Xrefs:
xBRT-CUD05-TB22x34
S1-BT120-CMP101-107
S 1-BT120-CM P201-205
GB-SEAL-MR46378
GB-SEAL-BM48810
ti
O_
U
N_
H
m
1
U)
O
N_
M
0
0
O
U
z
0
Lu
Lu
(D
a
z
a
Luca
Lu 06
O m
a I
00 00
—O
a
rn (�
z
o Y
O
0
Lj No
••
3'-011
r— — — —
— — — - --
— --
,--,—,—,,--,---- ��
A
. •.
1
CD
co
._
.:. . .
HORIZONTAL SECTION VIEW
NTS
3'-011
V-2" DIA.
5 5/16"
5/8" 14 1 / 16" ID 5/8"
4" OD
.
0
VERTICAL SUPPORT FOR E3 (BY OTHERS)
3 1/2" SCHEDULE 40 ALUMINUM PIPE
WELDED TO BASE AT TOP AND BOTTOM
B SMALL POST BASE CD-36 (BY OTHERS)
CAST ALUMINUM BASE WITH FOUR (4) SLOTTED
-IDLES FOR ANCHORS, PAINT METALLIC SILVER P8
C ANCHORS
FOUR (4) 5/8" DIA. x 6" MIN. EMBED
STAINLESS STEEL ANCHOR BOLTS AND
PENTA-NUT SET WITH TEMPLATE
N
D DOUBLE NUT
oil
— III I III
U
REBAR (3) #3 EACH WAY E 5? <,'�/
G I..L
- a
coLu
J
U
VERTICAL SECTION VIEW
NTS
E3 THICKENED SLAB FOOTING
NTS
12/10/2024 MR JLG IMR JISSUEDFORBID
DATE I DSN I CHK I APP I REVISION
B) FRAME (BY OTHERS)
PORCELAIN PANELS (BY OTHERS,
SIGN LOCATION IN SIGN SCHEDULE
VERTICAL SUPPORT FOR A5 A rt
(BY OTHERS)
8'-9"
4'-4 1/2"
M
rt
4'-4 1/2"
D) PANEL STIFFENERS (BY OTHERS)
8'-0" PORCELAIN P, NEL (BY OTHERS) G CAST CUFF BRACKET (BY OTHERS)
I
-fi-----------------rr--------------------n---------- ----- n-------------------- rr--- --------------t-I
----------
-----------------44--------------------+----------� ---------++--------------------+----------------�-
I II I II II I II II I II I
!Irt
II I II II II II I II
II I II II II II I II
II I II II II II I II
I II II II II I 1
I 11 11 I I 11 1 11 I I 11 I I 11 tl 1I
I; 18 11-4 II 11-I 1
4 II - II 11-4 1I-4 8 II
I II II II I 1
II I 1 II 1 111 1 II 1 II 1 1 11
+------L-----------L�----L—------------u1----------------1—J�--------------L-----J1---------J--------F�
-------------------- ---L---------------- ---------- ------- ------------------ L----------------J--------
\1
3 1/2" 3 1%2" 2
BT105 CMD101
7'-7" SUB FRAME �J
I
I I
I I
E SUB FRAME ST-123
(BY OTHERS)
I
I I II I I
I
I
. I
FINS ST-104 (BY OTHERS) F )
5/8�
A5 LAYOUT DETAIL
NTS
�Qo
VERTICAL SECTION VIEW
B NTS
BT105-CMS101
N--�
DESIGNED BY:
M. ROUGH
DRAWN BY:
M. ROUGH
CHECKED BY:
L. GILBERT
APPROVED BY:
M. ROUGH
3
A� VERTICAL SUPPORT FOR E3 (BY OTHERS)
3 1/2" SCHEDULE 40 ALUMINUM PIPE
WELDED TO BASE AT TOP AND BOTTOM
SMALL POST BASE CD-36 (BY OTHERS)
CAST ALUMINUM BASE WITH FOUR (4)
SLOTTED HOLES FOR ANCHORS, PAINT
METALLIC SILVER P8
r1
6i
m
E3 SMALL POST BASE — CD-36
NTS
SCALE:
11?0 w mw
NTS
pF WASy�
Q Q
srqIDE FILENAME:
u/i
w J S1-BT120-CMD101-107
4 BRT General Engineering Consultant J " SOUNDTRANSIT CONTRACT No.:
ST �� ��w RTA/CN 0205-24
NAL � SUBMITTED BY: DATE: REVIEWED BY: DATE: DATE:
12/02/2024 R. PARGAS 112/10/2024 1 J. ALTCHECH 112/10/2024 12/10/2024
N
0
00
0
CO
u J
bo
co 00
Lo Lo
4 31 /32" 4 1/16" 4 31 /32" 3,
PLAN VIEW B
NTS -
BT105-CMS101
T-433219
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
CIVIL
SIGN DETAILS
DEVELOPMENT ENGINEERING
msippo 11 /25/2025 U1
DRAWING No.:
BT120-CMD102
FACILITY ID:
BT120
SHEET No.: REV:
152 0
C'7
N
TT
O
N
CU
C'7
N
O
O
O
I
4
Q
J