HomeMy WebLinkAboutT-4332030N
Xrefs: co
xS1-BT120-CPP M
xS1-BT120-VRX ` J
xS1-BT120-CDP
xS1-BT120-TSPO
xS1-BT120-CLPO T
xS1-BT120-APP2
xS1-BT120-LHPO
xS1-BT120-LPP0 O
xS1-BT120-CMP
xBRT-CUD05-TB
xS1-BT120-GZK
xS1-BT120-CAP 1
xS1-BT120-VSF100
GB-SEAL-RJH43665
xS1-BT120-JCP101
xS1-BT120-EPP101
xS1-BT120-JCP001
xS1-BT120-GZKO10
xS1-BT120-TIP001
xS1-BT120-CZN002
C�
0
co
0
I
4
0
a
J
0
N
m
I
0
N
ccoo
co
0
0
0
z
X
w
(D
z
Q u1
. 06
Lmi
co
0 CO
_0
�a
co U
o z
N v
N
N >>
a
o U
vQ;`�
V
tl
44
:3o
GENERAL NOTES:
1. SEE SHEET BT120-CLP100 FOR ILLUMINATION
GENERAL NOTES.
2. SEE SHEET BT120-CLN101 FOR ILLUMINATION
LEGEND.
3. SEE SHEET BT120-CLS101 FOR ILLUMINATION
WIRING SCHEDULE
4. SEE SHEETS BT120-CLS102 THROUGH
BT120-CLS103 FOR ILLUMINATION POLE
SCHEDULE.
5. ALL EXISTING ILLUMINATION NOT CALLED OUT
TO BE REMOVED SHALL BE MAINTAINED AND
PROTECTED.
6. SEE ELECTRICAL SHEETS BT120-ESP101,
BT120-EPS104, AND BT120-EPS113 FOR CONDUIT
7. REFER TO CITY OF RENTON STANDARD PLAN 135
FOR ADDITIONAL TRANSPORTATION NOTES.
1
06/13/2025
OW
RT
I RH
ADDENDUM #1
12/10/2024
OW
RT
RH
ISSUED FOR BID
L0
No.
DATE
DSN
CHK
I APP
REVISION
1
MATCHLINE:
SEE DWG BT120-CLP204
1 \!l l Llll \✓ V V I LL - I L
U
11
11
11
Il
11
11
11
1'
1�
CONSTRUCTION NOTES:
MATCHLINE:
SEE DWG BT120-CLP202
�--S TC 619+04
OCONSTRUCT FOUNDATION AND INSTALL LIGHT POLE WITH "ALT2" LED
LUMINAIRE AND ARM. SEE ILLUMINATION POLE SCHEDULE.
OCONSTRUCT FOUNDATION AND INSTALL LIGHT POLE WITH DUAL ARM "ALT2"
LED LUMINAIRES IN 180 DEGREE CONFIGURATION. SEE ILLUMINATION POLE
SCHEDULE.
OCONSTRUCT FOUNDATION AND INSTALL PEDESTRIAN SCALE POLE WITH
"ALT1" LED LUMINAIRE AND ARM. SEE ILLUMINATION POLE SCHEDULE.
OFURNISH AND INSTALL ABOVE GRADE LIGHT POLE FOUNDATION. SEE SHEET
10 INSTALL TYPE 2 JUNCTION BOX PER CITY OF RENTON STANDARD PLAN 119.
13 AI T IN -AD R T C E IS I G IG T O E, L MI A R A M, L MI A ,
AND FOUNDATION.
14 REMOVE EXISTING LIGHTING JUNCTION BOX.
15 INTERCEPT EXISTING 1" CONDUIT AND CONNECT TO NEW TYPE 2 JUNCTION
BOX. SPLICE NEW LIGHTING CONDUCTORS TO EXISTING LIGHTING CIRCUITS.
16 CONSTRUCT FOUNDATION AND INSTALL LIGHT POLE WITH DUAL ARM "ALT2"
LED LUMINAIRES IN 90 DEGREE CONFIGURATION. SEE ILLUMINATION POLE
SCHEDULE.
28 REMOVABLE POLE IN SCL EASEMENT. POLE TO BE INSTALLED WITH
QUICK -DISCONNECT WIRING KIT.
DESIGNED BY:
R. TLEHHEMA
DRAWN BY:
R. SNELLINGS
CHECKED BY:
E. SHIMIZU
APPROVED BY:
R. HUTCHINSON
H
r ijjjngjW
43665
�GISTER� V
IDNAI �SUBMITTED BY:
6/12/2025 R. PARGAS
E
EXISTING R/W
zjU----:jU----D
MATCHLINE: NOT USED IN THIS SERIES
015cQ' P
-� U
I 103 I
L I I
I
102 201 107
� s 106 y
203
204 Q
205 105
101 104 1 1
sW
GRAY J
WA
y
SCALE:
Qui 111=20'
Q FILENAME:
4,5r,RIDE (n co
w J S1-BT120-CLP104-106
BRT General Engineering Consultant z " SOUNDTRANSIT CONTRACT No.:
RTA/CN 0205-24
DATE: REVIEWED BY: DATE: DATE:
12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024
UPDATES TO ROW
SEE SHEETS
BT120-RPP101-BT120-RPP102
BT120-RPP105-BT120-RPP106
BT1 20-RPP201 -BT1 20-RPP205
20 10 0 20 40
"6iii� !I I 6666iiii
KEY MAP SCALE IN FEET
DEVELOPMENT ENGINEERING Aoftk� �
IL
msippo 11/25/2025%dj T-433230
STRIDE BUS RAPID TRANSIT DRAWING No.:
SOUTH RENTON TRANSIT CENTER BT120-CLP106
BT105 FACILITY ID:
CIVIL BT120
SHEET No.: REV:
ILLUMINATION PLAN
LAKE STA 401 +50 TO LAKE STA 405+50 191 1
C'7
N
T
N
0
0
N
U
LO
V J
0
0
T
rr
n
co
co
N
O
O
O
N
Q
J