HomeMy WebLinkAboutT-4332031Xrefs: (�
xS1-BT120-CPP co
xS1-BT120-VRX
xS1-BT120-CDP 1
xS1-BT120-TSP T
xS1-BT120-CLP
xS1-BT120-LHP
xS1-BT120-LPP 0
xS 1-BT120-CM P
xBRT-CUD05-T rr
xS1-BT120-GZK
xS 1-BT120-CAP
xS1-BT120-VSF
GB-SEAL-RJH43665
xS1-BT120-APP211
xS1-BT120-JCP001
xS1-BT120-EPP101
xS1-BT120-GZK010
xS1-BT120-TIP001
xS1-BT120-CZN002
0
N
0
N
a
J
U
0
N
m
0
N
co
co
0
0
O
z
w
(D
Z O
Q W
Z 00
06
Lu
O CO
_O
�a
°O
0 Z
N v
N
N
a
o U
GENERAL NOTES:
1. SEE SHEET BT120-CLP100 FOR ILLUMINATION
GENERAL NOTES.
2. SEE SHEET BT120-CLN101 FOR ILLUMINATION
LEGEND.
3. SEE SHEET BT120-CLS101 FOR ILLUMINATION
WIRING SCHEDULE
4. SEE SHEETS BT120-CLS102 THROUGH
BT120-CLS103 FOR ILLUMINATION POLE
SCHEDULE.
5. ALL EXISTING ILLUMINATION NOT CALLED OUT
TO BE REMOVED SHALL BE MAINTAINED AND
PROTECTED.
6. SEE ELECTRICAL SHEETS BT120-ESP101,
BT120-EPS104, AND BT120-EPS113 FOR CONDUIT
7. REFER TO CITY OF RENTON STANDARD PLAN 135
FOR ADDITIONAL TRANSPORTATION NOTES.
1
06/13/2025
OW
RT
I RH
ADDENDUM #1
12/10/2024
OW
RT
RH
ISSUED FOR BID
L0
No.
DATE
DSN
CHK
I APP
REVISION
MATCHLINE: NOT USED IN THIS SERIES
MATCHLINE:
SEE DWG BT120-CLP203
CONSTRUCTION NOTES:
OCONSTRUCT FOUNDATION AND INSTALL LIGHT POLE WITH "ALT2" LED
LUMINAIRE AND ARM. SEE ILLUMINATION POLE SCHEDULE.
OCONSTRUCT FOUNDATION AND INSTALL LIGHT POLE WITH DUAL ARM "ALT2"
LED LUMINAIRES IN 180 DEGREE CONFIGURATION. SEE ILLUMINATION POLE
SCHEDULE.
OCONSTRUCT FOUNDATION AND INSTALL PEDESTRIAN SCALE POLE WITH
"ALT1" LED LUMINAIRE AND ARM. SEE ILLUMINATION POLE SCHEDULE.
OFURNISH AND INSTALL ABOVE GRADE LIGHT POLE FOUNDATION. SEE SHEET
BT120-SGY403 FOR ADDITIONAL DETAILS.
OINSTALL PEDESTRIAN SCALE LUMINAIRE POLE WITH 2" LUMINAIRE ARM AND
FOUNDATION WITH NEW LED FIXTURE PER CITY OF RENTON STANDARD
PLAN 117.2. FOUNDATION DEPTH SHALL BE 5' MINIMUM.
10 INSTALL TYPE 2 JUNCTION BOX PER CITY OF RENTON STANDARD PLAN 119.
13 A C I ,L A A ,
AND FOUNDATION.
1 20 REMOVE AND SALVAGE EXISTING STREET LIGHT POLE, BRACKET ARM, AND
LUMINAIRE. REMOVE EXISTING LIGHT POLE FOUNDATION AND ASSOCIATED
CONDUIT AND WIRING.
23 REMOVE EXISTING JUNCTION BOX. REMOVE EXISTING LIGHTING
CONDUCTORS SOUTH TO NEAREST JUNCTION BOX.
DESIGNED BY:
R. TLEHHEMA
DRAWN BY:
R. SNELLINGS
CHECKED BY:
E. SHIMIZU
APPROVED BY:
R. HUTCHINSON
H
r ijjjngjW
43665
�GISTER� V
IDNAI �SUBMITTED BY:
6/12/2025 R. PARGAS
1
24 ABANDON EXISTING SPARE CONDUIT.
25 REMOVE EXISTING LIGHTING CONDUCTORS AND ABANDON EXISTING
CONDUIT.
26 REMOVE EXISTING JUNCTION BOX. REMOVE EXISTING LIGHTING
CONDUCTORS NORTH TO NEAREST JUNCTION BOX.
30 LUMINAIRE ON SIGNAL MAST ARM POLE. SEE TRAFFIC SIGNAL SHEETS
BT120-TSD101, BT120-TSD102, AND BT120-TSS101 THROUGH BT120-TSS104
FOR DETAILS.
QLu
4,VrJ?IDE J
co_ co
J
BRT General Engineering Consultant zLL SOUNDTRANSIT
DATE: REVIEWED BY: DATE:
12/10/2024 J. ALTCHECH 12/10/2024
1
I
ID
0
Lu
Lu
U)
Lu
W 7TH ST
I 103 I
L
102 201 — 107
r 202 106
_ sI co
Q
L � J Q
205 105
101 � 104 III
GR DY l�
WAY
SCALE:
1 "=20'
FILENAME:
S 1-BT120-CLP201-205
CONTRACT No.:
RTA/CN 0205-24
DATE:
12/10/2024
KEY MAP
UPDATES TO ROW
SEE SHEETS
BT120-RPP101-BT120-RPP102
BT120-RPP105-BT120-RPP106
BT1 20-RPP201 -BT1 20-RPP205
20 10 0 20 40
SCALE IN FEET
DEVELOPMENT ENGINEERING
msippo 11 /25/2025
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
CIVIL
ILLUMINATION PLAN
S RENTON TRANSIT CENTER
T-433231
DRAWING No.:
BT120-CLP201
FACILITY ID:
BT120
SHEET No.: REV:
192 1
N
T
N
0
0
N
CU
LO
V J
0
0
0
0
1
T
N
co
co
N
O
O
O
N
Q
J