Loading...
HomeMy WebLinkAboutT-4332034Xrefs: FNm xS1-BT120-CPP coxS1-BT120-VRX xS1-BT120-CDP xS1-BT120-TSPO xS1-BT120-CLP0 T xS1-BT120-LHPO xS1-BT120-LPPO xS1-BT120-CMP O xBRT-CUD05-TB xS 1-BT120-GZK xS1-BT120-CAP xS1-BT120-VSF1 GB-SEAL-RJH43665 xS1-BT120-APP211 xS1-BT120-JCP001 xS1-BT120-EPP101 xS1-BT120-GZKO10 xS1-BT120-TIP001 xS1-BT120-CZN002 0 0 LO 0 N 0 N d J U 6 N m 0 N c—o 0 0 'O z X w (D Z O Q W Z 00 06 Lu O CO _O �a rn Z 0 N v N a o U SFF o Mq rc wG e H�/H ry?o, ct p?0 s GENERAL NOTES: 1. SEE SHEET BT120-CLP100 FOR ILLUMINATION GENERAL NOTES. 2. SEE SHEET BT120-CLN101 FOR ILLUMINATION LEGEND. 3. SEE SHEET BT120-CLS101 FOR ILLUMINATION WIRING SCHEDULE 4. SEE SHEETS BT120-CLS102 THROUGH BT120-CLS103 FOR ILLUMINATION POLE SCHEDULE. 5. ALL EXISTING ILLUMINATION NOT CALLED OUT TO BE REMOVED SHALL BE MAINTAINED AND PROTECTED. 6. SEE ELECTRICAL SHEETS BT120-ESP101, BT120-EPS104, AND BT120-EPS113 FOR CONDUIT I I G N R UI I F R A 10 7. REFER TO CITY OF RENTON STANDARD PLAN 135 FOR ADDITIONAL TRANSPORTATION NOTES. 1 06/13/2025 OW RT I RH ADDENDUM #1 12/10/2024 OW RT RH ISSUED FOR BID L0 No. DATE DSN CHK I APP REVISION 1 MATCHLINE: SEE DWG BT120-CLP202 2�5 M G 8-�120 SEE pW CONSTRUCTION NOTES: OCONSTRUCT FOUNDATION AND INSTALL LIGHT POLE WITH "ALT2" LED LUMINAIRE AND ARM. SEE ILLUMINATION POLE SCHEDULE. OCONSTRUCT FOUNDATION AND INSTALL LIGHT POLE WITH DUAL ARM "ALT2" LED LUMINAIRES IN 180 DEGREE CONFIGURATION. SEE ILLUMINATION POLE SCHEDULE. O3 REMOVE EXISTING LIGHT POLE FOUNDATION. OCONSTRUCT FOUNDATION AND INSTALL PEDESTRIAN SCALE POLE WITH "ALT1" LED LUMINAIRE AND ARM. SEE ILLUMINATION POLE SCHEDULE. OFURNISH AND INSTALL ABOVE GRADE LIGHT POLE FOUNDATION. SEE SHEET BT120-SGY403 FOR ADDITIONAL DETAILS. 28 REMOVABLE POLE IN SCL EASEMENT. POLE TO BE INSTALLED WITH QUICK -DISCONNECT WIRING KIT. DESIGNED BY: R. TLEHHEMA DRAWN BY: R. SNELLINGS CHECKED BY: E. SHIMIZU APPROVED BY: R. HUTCHINSON H r ijjjngjW 43665 �GISTfR V IDNAI �SUBMITTED BY: 6/12/2025 R. PARGAS CNLINEG`p�05 000000 M G BT 120 SEE pW QLu 4,VrJ?IDE J co_ co J _j BRT General Engineering Consultant z SOUNDTRANSIT DATE: REVIEWED BY: DATE: 12/10/2024 J. ALTCHECH 12/10/2024 -VIA SW 7TU I 103 I 1 102 201 — 107 � I 202 CO _ S ti I 204 Q 205 105 101 104 III GR DY l� WAY c! SCALE: 1 "=20' FILENAME: S 1-BT120-CLP201-205 CONTRACT No.: RTA/CN 0205-24 DATE: 12/10/2024 KEY MAP UPDATES TO ROW SEE SHEETS BT120-RPP101-BT120-RPP102 BT120-RPP105-BT120-RPP106 BT1 20-RPP201 -BT1 20-RPP205 20 10 0 20 40 SCALE IN FEET DEVELOPMENT ENGINEERING msippO 11 /25/2025 STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 CIVIL ILLUMINATION PLAN S RENTON TRANSIT CENTER T-433234 DRAWING No.: BT120-CLP204 FACILITY ID: BT120 SHEET No.: REV: 195 1 N T N O O N CU co co O O 4 N Q J