Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
T-4332042
N Xrefs: (Y� xBRT-CUD05-TB co GB-SEAL-RJH43 T O rr c9 0 0 co 0 N_ H m O N O M O r) 75 O U Lu F Q U O U) Q U) V 0 O LL Q LL O O Lu Lu z Z � Z z °o Lu 00 m W m — O U Q¢ � O z Y —o v) 3: N o U WIRING SCHEDULE RUN NO. RACEWAY CONDUIT SIZE EVPE 3CS PED BUTTON 2CS PED HEAD 3C VEH HEAD 5C #6 (PWR) TSP GPS GPS OPTICOM CCTV PTZ CAMERA #6 (GND) REMARKS 1 3" 1 2 2 1 2* 1 1 2 2" 1 1 1 3" 1 2 2 1 2* 1 1 3 2" SPARE 4 1" 1 1 3" 1 3 2 1 2* 1 1 5 2" SPARE 3" 1 5 4 1 2* 1 1 6 2" SPARE 7 3" 1 1 1 1 3" 1 3 4 1 2* 1 8 3" 1 3 1 2 1 2" SPARE 2" 1 1 1 1 9 2" SPARE 10 3" 2 1 1 3 2* 1 1 2 1 1 3" 2 1 1 4 2* 1 1 2 1 1 11 2" 2 2 1 12 2" 2* 1 2" 1 1 13 2" SPARE 2" 3 2 1 14 2" SPARE 3" 10 2 1 1 1 3" 2 1 4 1 1 1 2 1 15 3" 2 2 4 4 2* 2 1 16 NOT USED 17 1 * SEE ILLUMINATION PLANS FOR MORE DETAILS. 3 A� PRE-EMPTION DETECTOR ID PHASE EVP-A 1,6 EVP-B 2 EVP-C 4 EVP-D 3 TSP LOW PRIORITY SCHEDULE CHANNEL PHASE A 2 B 6 TRANSPORTATION OPERATION DEVELOPMENT ENGINEERING CBarnes 12/01 /2025 msippo 11 /25/2025 T-433242 DESIGNED BY: SCALE: DRAWING No.: R. TLEHHEMA I. xUTc Q JrRIDE NTs STRIDE BUS RAPID TRANSIT DRAWN BY: Q, wes ���r�� = Q BT120-TSS101 FILENAME: SOUTH RENTON TRANSIT CENTER R. SNELLINGS O w � S1-BT120-TSS101-106 BT105 FACILITY ID: now FA 10/24/2025 BN RT RH CoR Permit Revision - CNWD #001 CHECKED BY: BRT General Engineering Consultant J u- CONTRACT No.: BT120 SOUNDTRANSIT TRAFFIC 06/13/2025 BN RT RH ADDENDUM #1 E. SHIMIZU o 43665 ww RTA/CN 0205-24 SHEET No.: REV: 0 12/10/2024 BN RT RH ISSUED FOR BID APPROVED BY: �sIGISTEONAL ��0 SUBMITTED BY: DATE: REVIEWED BY: DATE: DATE: SIGNAL SCHEDULES HARDIE AVE SW & RAINIER AVE S 241 A No. DATE DSN CHK APP REVISION R. HUTCHINSON 10/24/2025 R. PARGAS 112/10/2024 J. ALTCHECH 112/10/2024 12/10/2024 H H N d