GENERAL NOTES:
1. THE PHASING PLANS AND DETOURS SHOWN ARE CONCEPTUAL IN
NATURE AND ARE NOT INTENTED TO SHOW ALL WORK ACTIVITIES OR
INTERIM PHASES THAT WILL BE REQUIRED TO COMPLETE THE WORK.
SUPPLEMENTAL NIGHT SHIFT OR WEEKEND WORK MAY BE REQUIRED.
THE CONTRACTOR SHALL SUBMIT LOCATION -SPECIFIC TRAFFIC
CONTROL PLANS TO THE AUTHORITY HAVING JURISDICTION (AHJ) FOR
APPROVAL.
2. TRAFFIC CONTROL SETUP AND CONSTRUCTION HOURS ARE
RESTRICTED TO THE DURATIONS SPECIFIED WITHIN THE SPECIAL
PROVISIONS AND ANY APPLICABLE PERMITS ISSUED BY APPLICABLE
AHJs.
3. THE CONTRACTOR SHALL NOT SCHEDULE ANY CLOSURES
REQUIRING A DETOUR UNTIL ALL RELATED TRAFFIC CONTROL AND
DETOUR PLANS HAVE BEEN APPROVED BY APPLICABLE AHJs.
4. NOTHING IN THESE NOTES OR CONTRACT DRAWINGS SHALL RELIEVE
THE CONTRACTOR OF THE RESPONSIBILITY FOR THE JOB SITE
CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE
PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THIS
REQUIREMENT SHALL APPLY CONTINUOUSLY IN WORK AREAS AND NOT
BE LIMITED TO WORKING HOURS.
5. BEFORE A ROAD, LANE, OR SIDEWALK CLOSURE, THE CONTRACTOR
SHALL ERECT SIGNS 7 CALENDAR DAYS IN ADVANCE FOR BOTH
DIRECTIONS OF TRAVEL, IF APPLICABLE, NOTIFYING THE
MOTORISTS AND PEDESTRIANS OF THE CLOSURE, UNLESS OTHERWISE
NOTED. THE SIGNS SHALL GIVE THE DATE(S) AND TIME OF THE
ROAD CLOSURE NOTICE - PORTABLE CHANGEABLE MESSAGE SIGN
(PCMS) BOARDS SHALL BE INSTALLED TO INFORM THE PUBLIC OF THE
ROAD CLOSURE, NO FEWER THAN FIVE (5) WORKING DAYS IN ADVANCE
OF EFFECTIVE DATE AND TIME, NOT INCLUDING HOLIDAYS. PLACE ONE
PCMS PER DIRECTION ON ROAD TO BE CLOSED.
ROAD CLOSURE NOTICE MESSAGES MUST INCLUDE AT LEAST THE
FOLLOWING:
ROAD TO BE CLOSED
MONTH/DAY - MONTH/DAY
AM - PM
ROAD CLOSURES LASTING MORE THAN 24 HOURS REQUIRE CITY
COUNCIL APPROVAL.
TYPICAL FOR ALL ROAD CLOSURES.
6. THE CONTRACTOR SHALL GIVE AT LEAST 30 DAYS ADVANCE NOTICE
OF ALL FULL OR PARTIAL STREET, SIDEWALK OR BIKE ROUTE
CLOSURES TO ALL AGENCIES PROVIDING EMERGENCY SERVICES,
INCLUDING, WITHOUT LIMITATION, POLICE, FIRE, AND AMBULANCE
SERVICES.
7. THE CONTRACTOR IS RESPONSIBLE FOR FURNISHING ALL SIGNAGE
REQUIRED FOR TRAFFIC CONTROL AND FOR THE TIMELY INSTALLATION
AND REMOVAL OF THAT SIGNAGE. ALL CONFLICTING SIGNING SHALL BE
COVERED. ADDITIONALLY ALL CLASS B SIGNS SHALL BE REMOVED AND
CLASS A SIGNS BAGGED OUTSIDE NON WORKING HOURS WHEN NOT IN
USE OR NOT APPLICABLE.
8. BUS OPERATIONS SHALL BE MAINTAINED. COORDINATE WITH KING
COUNTY METRO FOR ANY ANTICIPATED BUS STOP IMPACTS. KING
COUNTY METRO MUST RECEIVE A NOTICE AT LEAST 30 BUSINESS DAYS
PRIOR TO IMPACTING AN EXISTING KCM BUS STOP. KCM MUST RECEIVE
A NOTICE AT LEAST 10 BUSINESS DAYS PRIOR TO STREET CLOSURES
THAT REQUIRE TRANSIT DETOURS. CONTACT: (206) 477-1140 OR
CONSTRUCTION.COORD@KINGCOUNTY.GOV.
9. THE CONTRACTOR SHALL PLATE OVER OPEN TRENCHES WHEN NOT
IN OPERATION AND SHALL OPEN TRAFFIC LANES TO NORMAL
OPERATIONS. A NON -SLIP PLATE SURFACE SHALL BE USED.
"MOTORCYCLES USE EXTREME CAUTION" SIGNS ARE REQUIRED, PER
WAC 468-95-306. MAXIMUM PLATING DURATION IS 3 CONSECUTIVE DAYS.
10. THE CONTRACTOR SHALL PARTICIPATE IN PUBLIC OUTREACH
PROCESS LED BY SOUND TRANSIT, WSDOT, OR ANY OTHER AHJs.
11. THE CONTRACTOR SHALL MAINTAIN DRIVEWAY ACCESS TO
ADJACENT PROPERTIES AND BUSINESSES THROUGH THE DURATION OF
THE PROJECT. ALL INGRESS AND EGRESS AREAS SHOWN AS
"CONSTRUCT UNDER TRAFFIC" SHALL MAINTAIN ACCESS FOR TRAFFIC
THROUGH THE DURATION OF THE ASSOCIATED STAGE. THE MINIMUM
DRIVEWAY OR AISLE WIDTH SHALL BE 10'.
12. THE CONTRACTOR SHALL MAINTAIN 11 FOOT MINIMUM TRAVEL
LANES DURING CONSTRUCTION UNLESS OTHERWISE NOTED. IN CASES
WHERE THE EXISTING LANE WIDTH IS LESS THAN 11 FEET, THE EXISTING
WIDTH MAY BE MAINTAINED.
13. THE CONTRACTOR SHALL PROVIDE A TWO -FOOT LATERAL BUFFER SPACE BETWEEN
THE WORK ZONE AND THE EDGE OF THE NEAREST TRAVEL LANE.
14. ALL LANE CLOSURES MUST BE ALONG ACTIVE WORK AREAS. THE CONTRACTOR
SHALL OPEN LANES TO TRAFFIC IN AREAS WITH LONG PERIODS OF INACTIVITY.
15. FOR STEEP GRADES AND DROP-OFFS WITHIN THE CLEAR ZONE, TEMPORARY
BARRIERS SHALL BE PLACED ON THE TRAFFIC SIDE WITH A MINIMUM OF TWO FEET
BETWEEN THE DROP-OFF AND THE BACK OF THE BARRIER AND A MINIMUM TWO -FOOT
LATERAL BUFFER SPACE TO TRAFFIC. ALL TEMPORARY BARRIERS SHALL BE
MASH -COMPLIANT AND MEET WSDOT REQUIREMENTS.
16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PEDESTRIAN TRAFFIC CONTROL. A
SIDEWALK ON ONE SIDE OF THE STREET SHALL BE MAINTAINED AT ALL TIMES, OR A
MINIMUM 4-FOOT ADA OR PROWAG COMPLIANT PATH MUST BE PROVIDED. THE
CONTRACTOR SHALL MAINTAIN PEDESTRIAN ACCESS TO CROSSWALKS OR PROVIDE A
PATHWAY UTILIZING A SPOTTER TO GUIDE PEDESTRIANS THROUGH WORK AREAS
WHICH ARE SHOWN AS "CONSTRUCT UNDER TRAFFIC".
17. THE WORK AT INTERSECTIONS SHALL BE PHASED TO MINIMIZE IMPACT TO
PEDESTRIANS. WHERE APPLICABLE, AT LEAST THREE OF THE FOUR AVAILABLE
CROSSING MOVEMENTS AT INTERSECTIONS SHALL BE MAINTAINED AT ALL TIMES.
TEMPORARY ADA-COMPLIANT RAMPS SHALL BE PROVIDED BY THE CONTRACTOR, IF
NEEDED.
18. A PROTECTIVE VEHICLE IS RECOMMENDED. IF A TRUCK MOUNTED ATTENUATOR
(TMA) ISN'T AVAILABLE, A WORK VEHICLE MAY BE USED. WHEN NO TMA IS USED, THE
PROTECTIVE VEHICLE SHALL BE STRATEGICALLY LOCATED TO SHIELD WORKERS, WITH
MINIMUM REQUIRED ROLL -AHEAD DISTANCE.
19. FOR SIGNS, REFER TO MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)
AND WSDOT SIGN FABRICATION MANUAL M55-05.
20. LOCATIONS OF SIGNS AND OTHER TRAFFIC CONTROL DEVICES ARE APPROXIMATE
AND MAY BE RELOCATED TO AVOID OBSTRUCTIONS.
21. THE CONTRACTOR MUST COORDINATE WITH WSDOT MAINTENANCE FOR WORK THAT
WILL AFFECT ANY TRAFFIC SIGNALS ALONG S GRADY WAY AND RAINIER AVENUE S.
7nKlPQ-
TRAFFIC CONTROL SETUPS SEPARATED INTO THREE ZONES:
ZONE A: RAINIER AVENUE S AT HARDIE AVENUE SW BETWEEN SW 7TH STREET
AND S GRADY WAY
ZONE B: LAKE AVENUE S BETWEEN S GRADY WAY AND SHATTUCK AVENUE S
ZONE C: S GRADY WAY BETWEEN RAINIER AVENUE S AND LAKE AVENUE S
STAGING AND SEQUENCING:
ZONE A (RAINIER AVENUE S):
PHASE 1: - CONSTRUCTION OF NORTHBOUND RAINIER AVENUE S AT HARDIE
AVENUE SW.
- CLOSURE OF NORTHBOUND TRAFFIC LANES ON RAINIER AVENUE S
FROM S GRADY WAY TO SW 7TH STREET.
PHASE 2: - CONSTRUCTION OF SOUTHBOUND RAINIER AVENUE S AT HARDIE
AVENUE SW.
- CLOSURE OF SOUTHBOUND TRAFFIC LANES ON RAINIER AVENUE S
FROM SW 7TH STREET TO S GRADY WAY.
ZONE B (LAKE AVENUE S):
PHASE 1: - CONSTRUCTION ON LAKE AVENUE S
- CLOSURE OF LAKE AVENUE S BETWEEN S GRADY WAY AND SOUTH
RENTON PARK & RIDE DRIVEWAYS
- RELOCATING BUS ROUTES FROM LAKE AVENUE S TO NEW TRANSIT
CENTER VIA RAINIER AVENUE S
ZONE C (S GRADY WAY):
PHASE 1: - CONSTRUCTION OF SEWER PIPE AND SIDEWALK ON NORTH SIDE OF
S GRADY WAY
- NO LANE CLOSURE DURING CONSTRUCTION
PHASE 2.1: - CONSTRUCTION OF WATER PIPE IN THE WESTBOUND INSIDE LANE
ON S GRADY WAY (WEST SEGMENT)
- CLOSURE OF WESTBOUND INSIDE TRAFFIC LANE ON S GRADY
WAY
PHASE 2.2: - CONSTRUCTION OF WATER PIPE IN THE WESTBOUND INSIDE
THROUGH LANE ON S GRADY WAY
- CLOSURE OF WESTBOUND INSIDE TRAFFIC LANE
PHASE 2.3: - CONSTRUCTION OF WATER PIPE IN THE RIGHT TURN CHANNEL
ON WESTBOUND S GRADY WAY AT RAINIER AVE
- CLOSURE OF WESTBOUND OUTSIDE THROUGH LANE ON S GRADY
WAY AND RIGHT TURN MOVEMENT FROM WESTBOUND S GRADY
WAY TO NORTHBOUND RAINIER AVE
- CLOSURE OF OUTSIDE TWO THROUGH LANES ON RAINIER AVENUE
NORTH OF S GRADY WAY
- DETOUR RIGHT TURN TRAFFIC TO ADJACENT ROADWAYS
COMPLETE WORK IN ORDER OF PHASE NUMBERING. SOUTH RENTON TRANSIT CENTER
STATION SITE CONSTRUCTION MAY OCCUR CONCURRENTLY WITH PHASE 1 ROADWAY
CONSTRUCTION. ZONE B CONSTRUCTION SHOULD NOT BEGIN UNTIL THE TRANSIT
CENTER HAS BEEN BUILT. ZONE B AND ZONE C RESTRICT ACCESS / CLOSE LAKE
AVENUE. THESE TWO PHASES COULD BE COMBINED / COORDINATED. ZONE A AND
ZONE C SHALL NOT BE CONSTRUCTED CONCURRENTLY BUT, RATHER, SHALL BE
CONSTRUCTED SEQUENTIALLY.
SCOPE OF WORK WITHIN EACH ZONE IS PROVIDED IN THE MAINTENANCE OF TRAFFIC
AND TRANSIT (MOTT) REPORT..
SIGN SPACING
= X (1)
FREEWAYS & EXPRESSWAYS
55 / 70 MPH
1500' +/-
RURAL HIGHWAYS
60 / 65 MPH
800' +/-
RURAL ROADS
45 / 55 MPH
500' +/-
RURAL ROADS & URBAN ARTERIALS
35 / 40 MPH
350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTIAL & BUSINESS DISTRICTS
25 / 30 MPH
200' +/- (2)
URBAN STREETS
25 MPH OR LESS
100' +/- (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE
RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS.
(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT
ROADWAY CONDITIONS.
CONDITION OF APPROVAL # 14: TRAFFIC
CONTROL PLANS NOT APPROVED. CONTRACTOR
TO PROVIDE DETAILED TRAFFIC CONTROL PLANS
TO BE REVIEWED AND APPROVED BY CITVS
TRAFFIC CONTROL DIVISIONS. TCP SUBMITTALS
SHALL FOLLOW CITY'S REQUIREMENTS AND
SUBMITTED WITH APPLICATION TO
TCP@RENTONWA.GOV.
MINIMUM LANE CLOSURE TAPER LENGTH = L (feet)
LANE
Posted Speed (mph)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
10
105
150
205
270
450
500
550
-
-
-
11
115
165
225
295
495
550
605
660
-
-
12
125
180
245
320
540
600
660
720
780
840
MINIMUM SHOULDER TAPER LENGTH = L/3 (feet)
SHOULDER
Posted Speed (mph)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
8'
40
40
60
90
120
130
150
160
170
190
10,
40
60
90
90
150
170
190
200
220
240
USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8'.
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
25
30
35
40
45
50
55
60
65
70
LENGTH (feet)
155
200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R
HOST VEHICLE WEIGHT
9,900 TO 22,000 lbs.
HOST VEHICLE WEIGHT
> 22,000 lbs.
< 45 MPH
45-55 MPH
> 55 MPH
< 45 MPH
45-55 MPH
> 55 MPH
100
123'
172'
74'
100,
150'
CHANNELIZATION DEVICE
SPACING (feet)
MPH
TAPER
TANGENT
50/70
40
80
35/45
30
60
25/30
20
40
I r=r;r=nin
TYPE II BARRICADE
TYPE III BARRICADE
CLASS A CONSTRUCTION SIGN (LONG TERM WORK ZONE)
CLASS B CONSTRUCTION SIGN (SHORT TERM WORK ZONE)
TRAFFIC SAFETY DRUM
SEQUENTIAL ARROW SIGN
TRANSPORTABLE ATTENUATOR
PORTABLE CHANGEABLE MESSAGE SIGN
DIRECTION OF TRAFFIC
TEMPORARY CONCRETE BARRIER
IMPACT ATTENUATOR
UNIFORMED POLICE OFFICER (UPO)
FLAGGING STATION
WORK AREA
CONSTRUCT UNDER TRAFFIC
POTENTIAL TEMP BUS STOP LOCATION
T-433250
DESIGNED BY: SCALE: DRAWING No.:
Z. WANG w�oF C. Q J NTs STRIDE BUS RAPID TRANSIT
DRAWN BY: o��w ��o�d FILENAME: SOUTH RENTON TRANSIT CENTER4S U) BT120-TMN101
A 10/24/2025 ZW JS RA CoR Permit Revision - CNWD #001 Z. WANG `x �' u, J S1-BT120-TMN101 BT105 FACILITY ID:
2 6/27/2025 ZW PJ RA ADDENDUM#2 CHECKED BY: BRT Generol Engineering Consultont )l I rqIDE J LL SOUNDTRANSIT CONTRACT No.: TRAFFIC BT120
1 06/13/2025 ZW PJ RA ADDENDUM #1 J. SEYER l TERti� ��� RTA/CN 0205-24 SHEET No.: REV:
0 12/10/2024 ZW JS RA ISSUED FOR BID APPROVED BY: sSIONAL ��� SUBMITTED BY: DATE: REVIEWED BY: DATE: DATE: TRAFFIC CONTROL NOTES
249 A
No. DATE DSN CHK APP I REVISION R. ACEVEDO 1012212025 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024
co
N
N
O
O
N
U
H
H
H
co
co
N
O
O
N
Q
J