Loading...
HomeMy WebLinkAboutT-4332057m co Xrefs: xBRT-CUD05-TB co xS1-BT120-VSF1 xS1-BT120-CLPO 1 xS1-BT120-CDP T xS1-BT120-CMP V xS1-BT120-CMP 1 xS1-BT120-CMP O xS1-BT120-RPP xS 1-BT120-UCP 0 xS1-BT120-USP xS 1-BT120-U W P xS 1-BT120-CAPO xS1-BT120-CPP001 xS 1-BT120-TM P 101 GB-SEAL-RA55471 S GRADY WAY 24" SIDEWALK CLOSED AHD 12" CROSS HERE R9-11aR /p ® O 0 j / a'�� n 0 GRADY 150+00 GRADY 148+00 GRADY 149+"" RAINIER 200+00— NNW Now rJ CD 0 �i ti GENERAL NOTES: 0 1. ALL GRIND AND OVERLAY WORK WILL BE DONE UNDER TRAFFIC DURING NON PEAK HOURS WITH A FLAGGER. N 2. ALL BUSINESS AND RESIDENTIAL ACCESSES MUST m N P N 1 3. CONTRACTOR TO COORDINATE WITH THE CITY OF o RENTON AND PROVIDE AT LEAST THREE (3) WEEKS NOTICE FOR ANY TRAFFIC SIGNAL TIMING CHANGES. 0 co 0 O U U z_ 0 C� z Q z O (D _ N Q� �m N 00 —0 U Q¢ � o U z Y N 1 06/13/2025 ZW PJ RA ADDENDUM #1 o 0 12/10/2024 ZW JS RA ISSUED FOR BID o U No. DATE DSN CHK APP REVISION v �� GRADY 151+00 GRADY 153+00 S GRADY WAY TEMPORARY PAVEMENT MARKINGS: 1O 4" SOLID LINE, WHITE, TAPE OR PAINT 2O 4" BROKEN LANE LINE, WHITE, 4' LINE, 36' GAP, TAPE OR PAINT DESIGNED BY: Z. WANG DRAWN BY: Z. WANG CHECKED BY: J. SEYER APPROVED BY: R.ACEVEDO SUBMITTED BY: R. PARGAS ZONE C - PHASE 1 GRADY 154+00 GRADY 155+00 C3KAUY 156+UU 50 25 0 50 100 SCALE IN FEET T-433257 SCALE: DRAWING No.: STRIDE BUS RAPID TRANSIT w 1"=50' BT120-TMP107 r)?IDE ui Q FILENAME: SOUTH RENTON TRANSIT CENTER 4S U) -j J S1-BT120-TMP107-115 BT105 FACILITY ID: BRT General Engineering Consultant J LL CONTRACT No.: BT120 SOUNDTRANSIT RTA/CN 0205-24 TRAFFIC SHEET No.: REV: DATE: REVIEWED BY: DATE: DATE: TRAFFIC CONTROL PLAN S GRADY WAY 256 1 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 C'7 N N 0 0 N CU LO 0 0 0 1 T co N O O N Q J