Loading...
HomeMy WebLinkAboutT-4332066Xrefs: xBRT-CUD05-TBM co xS1-BT120-TCP GB-SEAL-RA55 T C� 0 N 0 0 n 0 0 N H m L7 O N CO ch 0 0 O U z 2 z z O D O N Qm _co N co O — U �a z Y L O a o U ZONE C - PHASE 2.3 RAINIER AVE S SOUTHBOUND CLOSURE DETOUR 24„ DETOUR 24" 0 � 0 30" 30" M4-9R M4-91- END 18„ O CONDITION OF APPROVAL # 15: TRAFFIC DETOUR DETOUR PLANS NOT APPROVED. CONTRACTOR 24" TO PROVIDE DETAILED TRAFFIC DETOUR PLANS M4-8A TO BE REVIEWED AND APPROVED BY CITY'S LEGEND TRAFFIC CONTROL DIVISIONS. TCP SUBMITTALS SHALL FOLLOW CITY'S REQUIREMENTS AND TEMPORARY BARRICADE N SUBMITTED WITH APPLICATION TO 24" TCPCRENTONWA.GOV. >1 DIRECTIONAL DETOUR SIGN 24" O � WORK AREA NOT TO SCALE R3-1 T-433266 DESIGNED BY: SCALE: DRAWING No.: Z. WANG C. ACC wrJ?IDE D N/A STRIDE BUS RAPID TRANSIT DRAWN BY: wasy� FILENAME: SOUTH RENTON TRANSIT CENTER4S 0 co BT120-TDP101 Z. WANG �' w S1-BT120-TDP101-102 BT105 FACILITY ID: CHECKED BY: BRT General Engineering Consultant z L` SOUNDTRANSIT CONTRACT No.: TRAFFIC BT120 1 06/13/2025 ZW Pi RA ADDENDUM #1 J. SEYER F a �° �� RTA/CN 0205-24 SHEET No.: REV: �rsTER ti TRAFFIC DETOUR PLAN 0 12/10/2024 ZW JS RA ISSUED FOR BID APPROVED BY: IONAL �� 06/10/2025 SUBMITTED BY: DATE: REVIEWED BY: rAE DATE: 265 1 No. DATE DSN CHK APP REVISION R. ACEVEDO R. PARGAS 12/10/2024 J. ALTCHECH /2024 12/10/2024 S GRADY WAY LO 0) 0 0 0 0 T rr n co co N O O O N Q J