ZONE C - PHASE 2.3
RAINIER AVE S SOUTHBOUND CLOSURE
DETOUR 24„ DETOUR 24"
0 � 0
30" 30"
M4-9R M4-91-
END 18„ O CONDITION OF APPROVAL # 15: TRAFFIC
DETOUR DETOUR PLANS NOT APPROVED. CONTRACTOR
24" TO PROVIDE DETAILED TRAFFIC DETOUR PLANS
M4-8A TO BE REVIEWED AND APPROVED BY CITY'S LEGEND
TRAFFIC CONTROL DIVISIONS. TCP SUBMITTALS
SHALL FOLLOW CITY'S REQUIREMENTS AND TEMPORARY BARRICADE N
SUBMITTED WITH APPLICATION TO
24"
TCPCRENTONWA.GOV. >1 DIRECTIONAL DETOUR SIGN
24" O � WORK AREA NOT TO SCALE
R3-1
T-433266
DESIGNED BY: SCALE: DRAWING No.:
Z. WANG C. ACC wrJ?IDE D N/A STRIDE BUS RAPID TRANSIT
DRAWN BY: wasy� FILENAME: SOUTH RENTON TRANSIT CENTER4S 0 co
BT120-TDP101
Z. WANG �' w
S1-BT120-TDP101-102 BT105 FACILITY ID:
CHECKED BY: BRT General Engineering Consultant z L` SOUNDTRANSIT CONTRACT No.: TRAFFIC BT120
1 06/13/2025 ZW Pi RA ADDENDUM #1 J. SEYER F a �° �� RTA/CN 0205-24 SHEET No.: REV:
�rsTER ti TRAFFIC DETOUR PLAN
0 12/10/2024 ZW JS RA ISSUED FOR BID APPROVED BY: IONAL �� 06/10/2025 SUBMITTED BY: DATE: REVIEWED BY: rAE DATE: 265 1