EXPANSION ANCHORS
1. EXPANSION ANCHORS SHALL HAVE A CURRENT EVALUATION
REPORT ISSUED BY AN APPROVED SOURCE IN ACCORDANCE
WITH ACI 355.2. IN SEISMIC DESIGN CATEGORY C AND GREATER,
THE EVALUATION REPORT SHALL INDICATE THE ANCHORS ARE
QUALIFIED FOR EARTHQUAKE LOADING. ANCHORS SHALL BE HILTI
KWIK BOLT TZ (ICC ES REPORTS ESR-1917) OR APPROVED EQUAL.
2. ANCHORS SHALL BE ZINC PLATED UNLESS SPECIFICALLY NOTED
AS STAINLESS STEEL ON THE PLAN DETAILS. USE STAINLESS
STEEL FOR ANCHORS EXPOSED TO WEATHER.
3. WHEN DETAILS OF SECTIONS INDICATE EXPANSION ANCHORS
BUT NO SIZE, PROVIDE ANCHORS WITH 3/4" DIAMETER.
4. INSTALL ANCHORS IN ACCORDANCE WITH THE EVALUATION
REPORT AND MANUFACTURER'S RECOMMENDATIONS. PROVIDE
THE MINIMUM EMBEDMENT DEPTHS, SPACING, AND EDGE
DISTANCE INDICATED IN THE SCHEDULE BELOW UNLESS NOTED
OTHERWISE IN DOCUMENTS. CONSULT STRUCTURAL ENGINEER
FOR DIRECTION WHEN SCHEDULE CANNOT BE MET.
5. WHEN INSTALLING DRILLED -IN -ANCHORS, USE CARE AND
CAUTION TO AVOID CUTTING OR DAMAGING THE EXISTING
REINFORCING BARS. WHEN INSTALLING THEM INTO CONCRETE
WITH STRESSING TENDONS (POST -TENSIONED OR PRE -
TENSIONED), LOCATE THE TENDONS BY USING A NOW
DESTRUCTIVE METHOD PRIOR TO INSTALLATION. EXERCISE
EXTREME CARE AND CAUTION AND MAINTAIN AT LEAST 1 INCH
CLEAR BETWEEN THE TENDON AND THE ANCHOR. CUTTING A
TENDON CAN CAUSE COLLAPSE.
6. TEST INSTALLED ANCHORS IN ACCORDANCE WITH THE ANCHOR
SCHEDULE AND AS FOLLOWS:
A. EXPANSION ANCHORS SHALL BE TESTED WITH A CALIBRATED
TORQUE WRENCH THE TORQUE LISTED BELOW SHALL BE
OBTAINED WITHIN HALF TURN OF THE NUT.
B. TESTING SHALL BE DONE IN THE PRESENCE OF THE SPECIAL
INSPECTOR. ANCHORS TESTED SHALL BE SELECTED AT
RANDOM BY THE SPECIAL INSPECTOR. THE TESTING
FREQUENCY SHALL BE AS FOLLOWS:
a. 100% OF ALL ANCHORS USED FOR STRUCTURAL
APPLICATIONS.
b. 50% OF ANCHORS OR ALTERNATE BOLTS IN A GROUP USED
FOR NON-STRUCTURAL APPLICATIONS SUCH AS EQUIPMENT
ANCHORAGE. INCLUDE AT LEAST ONE-HALF THE ANCHORS
IN EACH GROUP.
c. 10% OF ANCHORS USED FOR SILL PLATE ANCHORING.
d. 10% OF ANCHORS WHERE THE FACTORED DESIGN TENSION
LOAD IS LESS THAN 100 LBS AND IS CLEARLY IDENTIFIED ON
THE PLANS OR DETAIL
C. TEST EQUIPMENT SHALL BE CALIBRATED BY AN APPROVED
TESTING LABORATORY IN ACCORDANCE WITH STANDARD
RECOGNIZED PROCEDURES.
EXPANSION ANCHOR SCHEDULE
KWIK BOLT TZ ANCHOR SCHEDULE
ANCHORS INSTALLED IN CONCRETE
F'c = 2,500 psi MIN
ANCHOR MIN EFFECTIVE MIN EDGE MIN TEST
DIAMETER EMBEDMENT DISTANCE SPACING TORQUE
3/8"
2"
4 3/8"
6"
25 LB -FT
1 /2"
3 1/4"
7 1 /2"
9 3/4"
40 LB -FT
5/8"
4"
8 3/8"
12"
60 LB -FT
3/4"
4 3/4"
10"
14 1/4"
110 LB -FT
NOTE: CONSULT STRUCTURAL ENGINEER OF RECORD FOR
DIRECTION WHEN MINIMUM EDGE DISTANCE AND SPACING
CANNOT BE OBTAINED
ADHESIVE ANCHORS AND DOWELS
1. REINFORCING BAR DOWELS, REINFORCING BARS, THREADED
RODS, BOLTS, ETC WHICH ARE INDICATED AS ADHESIVE ANCHOR
OR ADHESIVE DOWELS SHALL BE ACCOMPLISHED USING HILTI
HIT -RE 500 V3 INTO CONCRETE OR HIT-HY 70 FOR SOLID
MASONRY (ICC ESR-4688 OR ESR-4143, RESPECTIVELY) OR
APPROVED EQUAL.
2. DRILL, BRUSH, AND CLEAN ALL HOLES, AND INSTALL ALL
ANCHORS IN COMPLETE ACCORDANCE WITH MANUFACTURER'S
PUBLISHED RECOMMENDATIONS, AS WELL AS ALL APPLICABLE
BUILDING CODES OR ENGINEERING REPORTS.
3. ADHESIVE ANCHORS AND DOWELS SHALL BE INSTALLED BY ACI
CERTIFIED INSTALLERS.
ADHESIVE ANCHORS AND DOWELS (CONT'D
4. ADHESIVE ANCHORS SHALL BE INSTALLED AND TESTED IN
ACCORDANCE WITH THE ADHESIVE ANCHOR TEST SCHEDULE
AND AS FOLLOWS:
A. 25% OF THE FIRST 40 ANCHORS INSTALLED AND 10% OF ALL
ANCHORS THEREAFTER.
B. FOR OVERHEAD AND HORIZONTAL APPLICATIONS TEST 100%
OF ALL ANCHORS.
C. IF ANY FAILURES OCCUR, THE PREVIOUS 10 ANCHORS
INSTALLED SHALL BE TESTED AS WELL AS THE NEXT 5
ANCHORS INSTALLED.
D. ANCHORS SHALL BE ALLOWED TO CURE 48 HRS PRIOR TO
TESTING.
E. TENSION TEST SHALL BE IN ACCORDANCE WITH ASTM E1512.
ADHESIVE ANCHOR TEST SCHEDULE
ANCHORS INSTALLED IN HARDROCK CONCRETE F'c = 2,000 psi MIN
BOLTS OR THREADED RODS Fy = 36 ksi
ANCHOR MIN TENSION TEST
DIAMETER EMBEDMENT LOAD
3/8"
5"
3,380 LB
1 /2"
7"
5,400 LB
5/8"
8"
9,390 LB
3/4"
10"
13,500 LB
7/8"
12"
18,400 LB
1"
13"
24,100 LB
1 1/4"
15"
37,600 LB
NOTE:
ALLOWABLE LOADS
EQUAL 1/2 TEST LOAD VALUE. TEST VALUES
ONLY VALID WHEN MINIMUM SPACING AND EDGE DISTANCE IS MET.
STRUCTURAL STEEL
1. STEEL FRAMING DESIGNATIONS AND SYMBOLS ARE DEFINED IN
THE STRUCTURAL LEGEND.
2. UNLESS SPECIFICALLY INDICATED AS SLIP CRITICAL OR
PRETENSIONED, ALL JOINTS SHALL BE DESIGNATED AS SNUG
TIGHT. ROUTINE OBSERVATION TO VERIFY THE SPLINED ENDS
ARE PROPERLY SEVERED DURING INSTALLATION IS REQUIRED
FOR ALL BOLTS.
3. CANTILEVER BEAM SIZE MATCHES MAIN SPAN BEAM SIZE UNLESS
NOTED OTHERWISE.
4. PLACE NON -SHRINK GROUT UNDER ALL COLUMN BASE PLATES
BEFORE PLACING ANY ELEVATED CONCRETE LEVELS.
5. WHERE THE WORK OF OTHER TRADES REQUIRES CUTS OR
OPENINGS TO BE MADE IN STRUCTURAL STEEL MEMBERS,
APPROVAL SHALL BE OBTAINED FROM THE ENGINEER. SUCH
OPENINGS SHALL BE MADE IN THE SHOP AND CLEARLY INDICATED
ON THE SHOP DRAWING.
6. ALL HSS AND PIPE WITH OPEN ENDS SHALL BE CAPPED WITH A
1/4" THICK PLATE OF THE SAME CROSS SECTION WHICH
COMPLETELY COVERS THE OPEN END, FULLY WELDED AND
GROUND SMOOTH, UNLESS NOTED OTHERWISE.
7. ALL WELDERS MUST BE QUALIFIED IN THE PROCESS USED AND
AWS CERTIFIED.
8. WELD LENGTHS CALLED FOR ON THE PLANS ARE THE NET
EFFECTIVE LENGTH REQUIRED. WHERE FILLET WELD SYMBOL IS
GIVEN WITHOUT INDICATION OF SIZE, USE MINIMUM SIZE WELDS
AS SPECIFIED BY AISC OR 3/16", WHICH EVER IS GREATER.
9. ALL GROOVE WELDS INDICATED ON PLANS AND SECTIONS SHALL
BE COMPLETE JOINT PENETRATION (CJP) WELDS UNLESS
SPECIFICALLY INDICATED TO BE PARTIAL JOINT PENETRATION
(PJP) WELDS.
10. ALL COMPLETE JOINT PENETRATION GROOVE WELDS AND FILLET
WELDS AT BRACING CONNECTIONS SHALL HAVE A FILLER METAL
WITH A MINIMUM NOTCH TOUGHNESS OF 20 FOOT-POUNDS
AVERAGE AT MINUS 20 DEGREES FAHRENHEIT.
11. E70XX ELECTRODES SHALL BE USED FOR ALL WELDING. THE
WELDING OF E7018 OVER E70TG-K2 IS NOT ALLOWED. THE MIXING
OF ANY OTHER PROCESSES AND WIRES MUST BE SUBMITTED TO
THE STRUCTURAL ENGINEER OF RECORD FOR APPROVAL. THE
USE OF E70-T4 IS NOT ALLOWED. IN GROOVE WELDS, FCAW
FILLER METAL WIRE SHALL BE LIMITED TO 5/64" DIAMETER. SMAW
WELDING ELECTRODES SHALL BE LIMITED TO 5/32" DIAMETER.
12.ALL SHOP AND FIELD WELDS SHALL BE PREQUALIFIED WELDS.
ANY WELDS BEYOND THE RANGE OR TOLERANCE OR
REQUIREMENTS FOR PREQUALIFICATION SHALL BE QUALIFIED BY
TEST PER AWS D1.1 CLAUSE 4 PART B. WELDS AT BASE METALS
OVER 2" IN THICKNESS ARE NOT ALLOWED AS PREQUALIFIED
WELD JOINTS WITHOUT TESTING.
STRUCTURAL STEEL (CONT'D)
13. A WELDING PROCEDURE SPECIFICATION (WPS) PER AWS D1.1
SHALL BE DEVELOPED BY THE FABRICATOR/ERECTOR AND
APPROVED BY THE STRUCTURAL ENGINEER OR HIS DESIGNEE.
THE WPS SHALL INCLUDE THE WELDING PARAMETERS
RECOMMENDED BY THE ELECTRODE MANUFACTURER. THE WPS
MUST BE SUBMITTED AND APPROVED BEFORE ANY WELDING MAY
BEGIN. ALLOW A MINIMUM OF FOUR WEEKS FOR THE REVIEW
PROCESS
14. A PRE -CONSTRUCTION MEETING BETWEEN THE STRUCTURAL
ENGINEER, THE FABRICATOR, THE ERECTOR, THE CONTRACTOR,
AND THE INSPECTORS SHALL TAKE PLACE TO DISCUSS THE
WELDING PROCEDURE SPECIFICATIONS (WPS) TO INSURE THE
QUALITY OF WORK THAT THE DESIGNER OF RECORD HAS
SPECIFIED. THE WELDING ELECTRODE MANUFACTURER'S
SPECIFICATIONS SHOULD BE ATTACHED TO THE WPS ON ALL
JOBS. ALL WELDERS AND INSPECTORS SHALL BE INSTRUCTED IN
THE PROPER USE OF THE WPS AND SHALL ALSO BE INSTRUCTED
TO RETAIN A COPY OF THE WPS.
15. TO ASSURE THE PROPER AMPERAGE AND VOLTAGE OF THE
WELDING PROCESS, THE USE OF A HAND HELD CALIBRATED AMP
AND VOLT METER SHALL BE USED. THIS EQUIPMENT SHALL BE
USED BY THE FABRICATOR, ERECTOR AND THE INSPECTORS.
AMPERAGE AND VOLTAGE SHALL BE MEASURED NEAR THE ARC.
TRAVEL SPEED AND ELECTRODE STICK OUT SHALL BE VERIFIED
TO BE IN COMPLIANCE WITH THE APPROVED WPS.
16. PREHEAT AND INTERPASS TEMPERATURES FOR THE SEISMIC
FORCE -RESISTING SYSTEM:
A. THE PREHEAT TEMPERATURES AND CONDITIONS GIVEN IN
AWS D1.1-6, ANNEX I, TABLE 1.2, SHOULD BE STRICTLY
OBSERVED USING A MEDIUM RESTRAINT LEVEL AND A MINIMUM
SUSCEPTIBILITY INDEX OF "D". EXCEPTION: PLATES 2" AND
THICKER AND GROUP 4 AND 5 SHAPES SHALL BE PREHEATED
TO 300 DEG F.
B. PREHEAT TEMPERATURES SHOULD BE MEASURED AT A
DISTANCE FROM THE WELD EQUAL TO THE THICKNESS OF THE
PART BEING WELDED, BUT NOT LESS THAN THREE INCHES, IN
ANY DIRECTION INCLUDING THE THROUGH THICKNESS OF THE
PIECE UNO IN THE CONTRACT DOCUMENTS. WHERE PLATES
ARE OF DIFFERENT THICKNESS, THE PRE -HEAT REQUIREMENT
FOR THE THICKER PLATE SHALL GOVERN. MAINTENANCE OF
THESE TEMPERATURES THROUGH THE EXECUTION OF THE
WELD (I.E. THE INTERPASS TEMPERATURE) IS ESSENTIAL.
MAXIMUM INTERPASS TEMPERATURES SHOULD BE LIMITED TO
550 DEGREES F FOR PRE -QUALIFIED WPS, FOR
FRACTURE -CRITICAL APPLICATIONS. HIGHER INTERPASS
TEMPERATURES COULD BE EMPLOYED IF THOSE HIGHER
TEMPERATURE LIMITS ARE QUALIFIED BY TEST.
17. A WELDING SEQUENCE SHALL BE DEVELOPED BY THE
FABRICATOR/ERECTOR AND APPROVED BY THE STRUCTURAL
ENGINEER OR HIS DESIGNEE FOR ALL WELDING TO BE DONE FOR
THE SEISMIC FORCE -RESISTING SYSTEM.
18. NON-DESTRUCTIVE TESTING OF WELDED CONNECTIONS SHALL
BE PERFORMED AT BRACING CONNECTION FILLET WELDS AND AT
ALL COMPLETE OR PARTIAL JOINT PENETRATION GROOVE WELDS
DESIGNATED TO BE A PART OF THE SEISMIC FORCE -RESISTING
SYSTEM:
A. WELDED CONNECTIONS SHALL BE TESTED BY
NON-DESTRUCTIVE METHODS FOR COMPLIANCE WITH
AISC 341, CHAPTER J. ULTRASONIC TESTING SHALL BE IN
ACCORDANCE WITH AWS D1.1 AND D1.8. THIS TESTING SHALL
BE PERFORMED BY AN APPROVED TESTING LABORATORY.
B. ANY MATERIAL DISCONTINUITIES SHALL BE ACCEPTED OR
REJECTED ON THE BASIS OF DEFECTIVE RATING IN
ACCORDANCE WITH THE (LARGER REFLECTOR) CRITERIA OF
AWS D1.1, CLAUSE 6.13.
C. INSPECTORS SHALL BE QUALIFIED IN ACCORDANCE WITH
AWS D1.1 CHAPTER 6.
D. IN ADDITION TO THE REGULAR INSPECTIONS, A RE -INSPECTION
SHALL BE DONE A MINIMUM OF 48 HOURS AFTER COMPLETE
JOINT PENETRATION WELDING ON COLUMN FLANGES WITH A
THICKNESS OF 3" OR GREATER.
STRUCTURAL STEEL (CONT'D)
19. THE FOLLOWING SPECIAL REQUIREMENTS SHALL APPLY TO
BEAM TO COLUMN CONNECTIONS WITH WELDED BEAM FLANGES
DESIGNATED AS A PART OF THE SEISMIC FORCE -RESISTING
SYSTEM:
A. NO WELD DAMS ARE ALLOWED.
B. BEAM FLANGE TO COLUMN WELDS SHALL BE MADE BEFORE
BOLTS ARE TENSIONED.
C. WELDING SEQUENCE: BOTH FLANGES SHALL BE WELDED
PRIOR TO ANY SUPPLEMENTAL WELDING TO THE SHEAR TAB.
D. RUN-OFF TABS PER AWS D1.1 ARE REQUIRED FOR THE
COMPLETE JOINT PENETRATION (CJP) FLANGE GROVE WELDS.
ALL WELDS ARE TO BE STARTED AND COMPLETED ON THE
RUN-OFF TABS AS MUCH AS PRACTICABLE.
E. RUN-OFF TABS SHALL BE REMOVED AND THE ENDS GROUND
SMOOTH (I.E. NO PITS OR GOUGES, SUITABLE FOR MAGNETIC
PARTICLE TESTING). BACK-UP BARS, IF USED, SHALL BE
REMOVED AT ALL BEAM BOTTOM FLANGES, BACK -GOUGED AND
BACK -WELDED. BACK-UP BARS AT TOP FLANGES MAY REMAIN.
RUN OFF TABS ARE ALSO REQUIRED TO BE REMOVED ON
COLUMN SPLICES IN ACCORDANCE WITH AISC 341. WELD TABS
SHALL BE REMOVED AND GROUND FLUSH TO THE BEAM
FLANGE.
F. THE WELD ROOT SHALL BE INSPECTED AND TESTED PER AWS
REQUIREMENTS GIVEN IN CHAPTER 6. IF REJECTABLE
INDICATIONS ARE FOUND, REMOVE BY BACK -GOUGING TO
SOUND METAL.
G. A FILLET WELD SHALL BE APPLIED TO REINFORCE THE JOINT.
THE SIZE OF THE REINFORCING WELD SHALL BE EQUAL TO
ONE QUARTER OF THE BEAM FLANGE THICKNESS (T), BUT NOT
LESS THAN 1/4" NOR MORE THAN 3/8" PER NOTE J OF FIGURE
3.4 OF D1.1.
H. ALL WELD TABS (RUNOFF TABS) ON ALL CJP WELDS OF SMRF
COLUMNS SHALL BE REMOVED AND GROUND SMOOTH.
I. FOR THE WELD OF THE BOTTOM BEAM FLANGE TO THE
COLUMN FLANGE, FOLLOW STEPS 1. THROUGH 7 BELOW:
a. THE ROOT PASS SHOULD NOT EXCEED A 1/4" IN LAYER
THICKNESS.
b. THE WELD SHALL BE INITIATED ON THE WELD TAB, WITH
TRAVEL PROGRESSING TOWARD THE CENTER OF THE
GIRDER FLANGE WIDTH. STOP WELD APPROXIMATELY 1"
BEFORE THE BEAM WEB AND MOVE TO THE OTHER SIDE OF
THE BEAM WEB TO RESTART WELD. DO NOT LEAVE WELD
CRATER DIRECTLY IN THE CENTER OF THE BEAM FLANGE
WIDTH.
c. THE HALF LENGTH ROOT PASS SHALL BE THOROUGHLY
CLEANED OF ALL SLAG.
d. THE END OF THE HALF LENGTH ROOT PASS THAT IS NEAR
THE CENTER OF THE BEAM FLANGE SHOULD BE VISUALLY
INSPECTED TO ENSURE FUSION, SOUNDNESS, FREEDOM
FROM SLAG INCLUSIONS AND EXCESSIVE POROSITY. THE
RESULTING BEAD PROFILE SHOULD BE SUITABLE FOR
OBTAINING FUSION BY THE SUBSEQUENT PASS TO BE
INITIATED ON THE OPPOSITE SIDE OF THE GIRDER WEB. IF
THE PROFILE IS NOT CONDUCIVE TO GOOD FUSION, THE
START OF THE FIRST ROOT PASS SHOULD BE GROUND
GOUGED, CHIPPED OR OTHERWISE PREPARED TO ENSURE
ADEQUATE FUSION.
e. THE SECOND HALF OF THE WELD JOINT SHALL HAVE THE
ROOT PASS APPLIED BEFORE ANY OTHER WELD PASSES
ARE PERFORMED. THE ARC SHOULD BE INITIATED AT THE
END OF THE HALF LENGTH ROOT PASS THAT IS NEAR THE
CENTER OF THE BEAM FLANGE, AND TRAVEL SHOULD
PROGRESS TO THE OUTBOARD END OF THE JOINT,
TERMINATING ON THE WELD TAB.
f. EACH WELD LAYER SHALL BE COMPLETED ON BOTH SIDES
OF THE JOINT BEFORE A NEW LAYER IS DEPOSITED.
g. WELD TABS SHALL BE REMOVED AND GROUND FLUSH TO
THE BEAM FLANGE.
20. INSPECTORS ARE TO BE DEPUTY INSPECTORS AND AWS QC-1
CERTIFIED.
21. ALL STEEL EXPOSED TO WEATHER SHALL BE HOT -DIPPED
GALVANIZED.
HEADED STUDS AND DEFORMED BAR ANCHORS
1. HEADED STUDS AND DEFORMED BAR ANCHORS SHALL BE
ELECTRIC -ARC STUD WELDED PER MANUFACTURERS
RECOMMENDATIONS AND THE AWS CODE. FILLET WELDING
SHALL NOT BE ALLOWED WITHOUT APPROVAL OF THE
STRUCTURAL ENGINEER. WELDMENT SHALL BE IN SUCH A
MANNER AS TO PROVIDE COMPLETE FUSION BETWEEN THE END
OF THE STUD AND THE PLATE. THERE SHOULD NO POROSITY OR
EVIDENCE OF LACK OF FUSION BETWEEN THE WELDED END OF
THE STUD AND THE PLATE. THE STUD WILL DECREASE IN LENGTH
DURING WELDING APPROXIMATELY 1/8" FOR 5/8" DIAMETER STUDS
AND SMALLER, 3/16" FOR LARGER THAN 5/8" DIAMETER.
HEADED STUDS AND DEFORMED BAR ANCHORS (CONT'D)
2. HEADED STUDS SHALL BE TYPE B PER AWS CODE WITH MINIMUM
ULTIMATE STRENGTH OF 65 KSI (450 MPa). NELSON GRANULAR
FLUX FILLED OR APPROVED EQUAL. STUDS SHALL BE
MANUFACTURED WITH COLD DRAWN BAR STOCK CONFORMING
TO ASTM A108.
3. DEFORMED BAR ANCHORS SHALL COMPLY WITH ASTM A970 WITH
MINIMUM YIELD STRENGTH OF 70 KSI (485 MPa).
4. DEFORMED BAR ANCHOR LENGTHS SHALL BE AS FOLLOWS,
UNLESS NOTED OTHERWISE:
BAR DIAMETER EMBEDMENT LENGTH
3/8" 24"
1 /2" 24"
5/8" 30"
SEISMIC BRACING OF NON-STRUCTURAL SYSTEMS
1. BRACING AND SUPPORT OF ALL CONDUITS, DUCTS, FIRE
SPRINKLERS, PIPES, AND SYSTEMS SHALL MEET THE CURRENT
BUILDING CODE. THE DESIGN OF THE SUPPORT AND BRACING
SYSTEMS IS THE RESPONSIBILITY OF THE CONTRACTOR WITH
THE CONTRACTOR USING ANY PRE -APPROVED SYSTEM.
2. PRE -APPROVED SYSTEMS SUCH AS MASON, TOLCO, UNISTRUT,
OR ISAT MAY BE USED.
3. FIRE SPRINKLERS SHALL MEET THE CURRENT VERSION OF
NFPA 13. BRACES SHALL BE LOCATED WITHIN 6" OF THE HANGER
AND ROD STIFFENERS SHALL BE ADDED AT BRACE LOCATIONS
WHEN THE LENGTH OF THE ROD EXCEEDS 50 TIMES ITS
DIAMETER.
4. THE CONTRACTOR IS REQUIRED TO PROVIDE THE ARCHITECT
WITH SHOP DRAWINGS AND CALCULATIONS SHOWING ALL
BRACING AND SUPPORT LOCATIONS AND DETAILS OF
CONNECTION FOR ALL SYSTEMS INCLUDING SMACNA, FIRE
SPRINKLERS, AND OTHER PRE -APPROVED SYSTEMS. THE
SPECIFIC DETAIL FOR EACH TYPE OF CONNECTION MUST BE
REFERENCED ON THE SHOP DRAWING PLANS. SUPPLYING A
BOOK OF DETAILS WITHOUT REFERENCING THE PROPER DETAIL
TO A SPECIFIC LOCATION ON THE PLANS IS NOT ACCEPTABLE.
THIS SUBMITTAL SHALL BE REVIEWED BY THE STRUCTURAL
ENGINEER.
5. WHERE PRE -APPROVED SYSTEMS DO NOT ADDRESS THE GIVEN
CONDITION, THE CONTRACTOR IS RESPONSIBLE FOR AN
INDEPENDENTLY ENGINEERED SYSTEM. THIS SYSTEM SHALL BE
DESIGNED BY A LICENSED PROFESSIONAL ENGINEER
REGISTERED IN THE STATE OF CONSTRUCTION WITH
CALCULATIONS AND DETAILS PROVIDED FOR REVIEW BY THE
STRUCTURAL ENGINEER.
DEFERRED STRUCTURAL SUBMITTALS
1. SOME STRUCTURAL SYSTEMS ARE DEFINED AS VENDOR
COMPONENTS PER THE STRUCTURAL DOCUMENTS. THESE
ELEMENTS OF THE DESIGN ARE DEFERRED SUBMITTAL
COMPONENTS AND HAVE NOT BEEN PERMITTED UNDER THE BASE
BUILDING APPLICATION. THE CONTRACTOR WILL BE REQUIRED TO
SUBMIT THE STAMPED COMPONENT SYSTEM DOCUMENTS TO THE
BUILDING OFFICIAL FOR APPROVAL.
2. DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
SUBMITTED TO THE ARCHITECT, WHO SHALL REVIEW THEM FOR
GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING. THE
CONTRACTOR SHALL SUBMIT THESE REVIEWED DEFERRED
SUBMITTAL DOCUMENTS TO THE BUILDING OFFICIAL. THE
DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL
THE DESIGN AND SUBMITTAL DOCUMENTS HAVE BEEN APPROVED
BY THE BUILDING OFFICIAL.
3. THE FOLLOWING LIST INCLUDES THE ITEMS THAT ARE DEFINED
AS DEFERRED STRUCTURAL SUBMITTAL COMPONENTS. REFER TO
THE OTHER DISCIPLINES FOR ADDITIONAL DEFERRED SUBMITTAL
COMPONENTS.
EXTERIOR CLADDING
FENESTRATION / CLERESTORY DESIGN
METAL STUD SYSTEM
METAL STAIRS AND LANDINGS
FUTURE EXPANSION
1. THE STRUCTURES AND FOUNDATIONS IN THIS PROJECT HAVE
NOT BEEN DESIGNED FOR FUTURE EXPANSION.
DEVELOPMENT ENGINEERING
-r
R-4332268 msippo 11 /25/2025
DESIGNED BY: SCALE: DRAWING NO.:
STRIDE BUS RAPID TRANSIT
L. DOWELL 0ESPAR2A Q J NTS BT120-SZN002
DRAWN BY: ��� °� wasNJ°G U FILENAME: SOUTH RENTON TRANSIT CENTER
R. MUNRO w� �t� a, �z 4Sr.RIDE F)lw co S1-BT120-S-v2020 BT105 FACILITY ID:
::)
CHECKED BY: :n N BRT General Engineering Consultant J LL��DrRANS�T CONTRACT No.: STRUCTURAL BT120
D. PRINDLE2 16264��� �� RTA/cN 0205-24 SHEET No: REV:
GENERAL STRUCTURAL NOTES
0 12/10/2024 LPD DJP AE ISSUED FOR BID APPROVED BY:� NAL F,� SUBMITTED BY: DATE: REVIEWED BY: DATE: SUBMITTAL DATE: 346 0
No. I DATE DSN CHK APP REVISION A. ESPARZA 15/Nov/2024 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024