Loading...
HomeMy WebLinkAboutR-4332279N co co 6 W 0 N O N ch O N H m co U w C� �I Z Q ry H I c) Q ry I D m of 0 co 00 LO � M Q CI N Q N a0 N U) L o (N O cy) N co m 1 06/13/2025 LPD AJF 0 12/10/2024 LPD DJP No. DATE DSN CHK BT120-SGE111 BT120-SGE111 N--" N--"' AE ADDENDUM #1 AE ISSUED FORBID APP REVISION FRAMING PLAN - CANOPY - SECTOR A SCALE: 1 /8" = 1'-0" DESIGNED BY: L. DOWELL DRAWN BY: R. MUNRO CHECKED BY: A. FORTNER APPROVED BY: A. ESPARZA 2/June/2025 BT120-SGP100 Q w 4fTmRlDE cn U F)R U7 W J BRT General Engineering Consultant z U- SUBMITTED BY: DATE: REVIEWED BY: R. PARGAS 12/10/2024 J. ALTCHECH GENERAL NOTES: 1. LEVEL 02 - CANOPY SECTOR A REFERENCE ELEVATION IS 37'-0". TOP OF STEEL ELEVATIONS IS AT REFERENCE ELEVATION. BOTTOM OF SLAB IS AT TOP OF STEEL ELEVATION. 2. THE STRUCTURAL SLAB IS A 1 1/2-INCH STEEL DECK. SEE THE TYPICAL ROOF DECK DETAILS. 3. CONTRACTOR SHALL COORDINATE ALL OPENINGS AND DEPRESSIONS PRIOR TO CONSTRUCTION. SCALE: M;Vmr=" 1/8" = 1'-0" FILENAME: S 1-BT120-S-v2020 SOUNDTRANSIT CONTRACT No.: RTA/OA 0206-19 DATE: SUBMITTAL DATE: 12/10/2024 12/10/2024 C D PLATFORM E F G H CORE FACILITY 1)11� KEY PLAN N 8 4 0 8 16 SCALE IN FEET DEVELOPMENT ENGINEERING R-4332279 msippo 11 /25/2025 U1 STRIDE BUS RAPID TRANSIT DRAWING NO.: SOUTH RENTON TRANSIT CENTER BT120-SGP312 BT105 FACILITY ID: STRUCTURAL BT120 SHEET No: REV: LEVEL 2 FRAMING PLAN CANOPY - SECTOR A 357 1