Loading...
HomeMy WebLinkAboutR-4332416CV 32"MIN . co LOBBY 4 MAX. C'7 NOTE: 't 48" MINIMUM IF PULL SIDE PULL SIDE — O DOOR HAS BOTH A LATCH AND 24" MIN. CLR. � CLOSER 9 LJJ _ z @ EXT. DOOR 48 °000. h 36" MIN. coo 0 18" MIN. CLR. -C—= F' "I PULL SIDE INTERIOR @ INT. DOOREF DOOR - z 0 0 z Z z _ , °�° o 18" Z w N co w MIN. bo = Q PUSH SIDE DOORS IN SERIES X H PUSH HINGE 54" MIN. FRONT SIDE - - - - - - J WALKING PARALLEL TO A WALL 12" APPROACH APPROACH PULL SIDE INTERIOR 48" MIN. MIN. DOOR 18" TO 19" w 10" MAX_ 30" 24" MAX 5"MAX 15"MIN U WING WALLS DOWN TO UCIO Q z Q FLOOR ,, -- R - - - 24" MAX ANY N Z _ O z z M O DIMENSION M z z M �, M a � z z i U ------------- � WING WALLS � J', _ co M DOWN TO z FLOOR 18" MIN. L_ 8 MIN KNEE CLEARANCE 11" 6" 6" MAX. -TOE CLEAR FLOOR SPACE AT ADDITIONAL PROTECTION PROTRUDING OBJECTS HANGING ON CLEARANCE DRINKING FOUNTAIN NOT REQUIRED BETWEEN WALL WITH LEADING EDGES ABOVE HIGH AND LOW SIDE REACH LIMIT MAXIMUM REACH OVER OBSTRUCTION ALCOVES WING WALLS 27" FRONT APPROACH & SIDE CLEARANCES SCALE: 1 /2" = V-0" 67" DIAMETER SPACE 12" MIN. 36" MIN. 12" MIN. N n LO n Z � co 0 Z e\ (.0 36" M 60" T-SHAPE TURN SPACE FORWARD APPROACH PARALLEL APPROACH 0 N I------------- -- O N > Q >20"-25" MA) N U w 0o w w Q a J U U � C) U C) o0 00 p 00 C� _ O O L.L M J �I LL------------- - --------------- CIO1 -Z Z ® 30" CLEAR 48" CLEAR LO of HIGH FORWARD OBSTRUCTED FORWARD FLOOR SPACE FLOOR SPACE SIDE REACH LIMIT Q REACH LIMIT REACH LIMIT FORWARD APPROACH PARALLEL APPROACH R-4332416 APPROACH AND REACH 2 DEVELOPMENT ENGINEERING m of SCALE: 1/2" = V-0" - msippo 11/25/2025 0 co co DESIGNED BY: SCALE: DRAWING NO.: o C. CHEANG Q w 1/2" = 1'-0" STRIDE BUS RAPID TRANSIT co QI DRAWN BY: 9849 REGISTERED L) FILENAME: SOUTH RENTON TRANSIT CENTER BT120-AID910 M A. DOMINGO ARCHIT w J S1-BT120-A-v2020 BT105 FACILITY ID: � D CHECKED BY: NN N BRT General Engineering Consultant z CONTRACT No.: BT120 �D SOUNDTRANSIT ARCHITECTURE o p D. HOGAN STATE OFWASHINGT RTA/CN 0205-24 SHEET No: REV: LO cy) 0 12/10/2024 J.C. D.H. C.C. ISSUED FOR BID APPROVED BY: SUBMITTED BY: DATE: REVIEWED BY: DATE: SUBMITTAL DATE: DETAILS m No. DATE DSN CHK APP REVISION C. CHEANG R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 CORE FACILITY 494 0