Loading...
HomeMy WebLinkAboutR-43324206 0 LU 0 N 0 N a 0 N m W w �I W z 0 a I W D m 0 I 0 co 00 LO a o o I L Q L U) 0 0 rn CY) m DRAWING NOTES: LEGEND REFER TO GEN-GZN006 & GEN-GZN007 FOR ADDITIONAL SYMBOLS AND LEGEND GENERAL NOTES PIPING SYMBOLS VALVE SYMBOLS A. REFER TO GEN-GZN006 AND GEN-GZN007 FOR ADDITIONAL SYMBOLS AND KEY NOTES: LEGEND. (1) 1/2" TP FROM ABOVE -DETAIL 4/MPD001. O P-TRAP GATE VALVE B. REFER TO SPECIFICATIONS FOR MATERIALS AND METHODS O1" DCW FROM ABOVE. FOR CONSTRUCTION. O1" NPW FROM ABOVE. 0 CLEANOUT BALL VALVE C. COORDINATE THE EXACT LOCATION OF FLOOR DRAINS WITH THE 40 2" DCW UP THROUGH FLOOR. ARCHITECTURAL DRAWINGS AND MECHANICAL EQUIPMENT LOCATIONS PRIOR TO INSTALLATION OF DRAINS. HOSE BIBB, WALL HYDRANT CHECK VALVE (NON SLAM) 05 3" WASTE FROM LAVATORIES. PRESSURE REDUCING VALVE D. COORDINATE ACCESS DOORS FOR INSTALLATION IN WALLS AND CEILINGS 3" WASTE FROM SINK. O o FLOOR DRAIN (PRV) WHERE ACCESS IS REQUIRED TO CONCEALED PLUMBING EQUIPMENT, VALVES, CONTROLS, AND OTHER DEVICES. 07 3" WASTE FROM MOP SINK. LINE/WALL CLEANOUT STRAINER E. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS, REVISIONS, T 4" WASTE FROM URINALS. AMENDMENTS OR SUPPLEMENTS OF APPLICABLE STATUTES, ORDINANCES, WATER HAMMER ARRESTER CODES, OR REGULATIONS OF FEDERAL, STATE AND LOCAL AUTHORITIES ABBREVIATIONS 99 4" SANITARY SEWER FROM WATER CLOSETS. HAVING JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED. AS OF PRESSURE GAUGE WITH COCK JAN 2023, WAC VERSIONS OF: 2018 IBC, 2018 UPC. 10 4" WASTE FROM FLOOR DRAIN. BCO BUILDING CLEANOUT F. COORDINATE WORK WITH ARCHITECTURAL FEATURES AND COORDINATE 11 2" WASTE FROM HUB DRAIN. SEE DETAIL 3/MPS001. UNION BOD BASIS OF DESIGN WORK SUCH THAT INTERFERENCES BETWEEN PIPING, DUCTWORK, EQUIPMENT, PLUMBING WORK, ELECTRICAL WORK, BUILDING STRUCTURE 12 4" WASTE FROM HUB DRAIN. � PITCH DOWN IN DIRECTION OF ARROW FS FLOOR SINK WILL BE AVOIDED. 13 4" UP TO CLEANOUT - DETAIL 2/MPD001. HC HANDICAPPED G. PROVIDE THE ENTIRE SYSTEM AND ITS COMPONENT ITEMS OF EQUIPMENT IN 14 DROP 4" SANITARY SEWER DOWN TO LOWER ® WALL HUNG WATER CLOSET HD HUB DRAIN OPERATING CONDITION WITHOUT OBJECTIONABLE VIBRATION OR NOISE. PROVIDE WATER HAMMER ARRESTERS AT RESTROOM PLUMBING CHASES. ELEVATION. 15 2" VENT UP THROUGH FLOOR. WALL HUNG URINAL MS MOP SINK H. PROVIDE ALL WIRING AND ELECTRICAL CONTROLS IN ACCORDANCE WITH NFPA 70 (NEC). NPW NON -POTABLE WATER 16 4" UP THROUGH FLOOR TO CLEANOUT. O WALL HUNG LAVATORY PCO PLUG CLEANOUT I. VERIFY AND DOCUMENT EXISTING CONDITIONS AND DIMENSIONS ON THE JOB 17 3" HUB DRAIN (3" X 2" REDUCER).a DROP -IN SINK PG PRESSURE GAUGE SITE PRIOR TO STARTING ANY WORK. 18 4" HUB DRAIN (8" X 4" REDUCER). ROUTE DRAIN FROM RPBA REDUCED PRESSURE BACKFLOW J. DO NOT SCALE THESE DRAWINGS FOR CONSTRUCTION PURPOSES. BACKFLOW PREVENTER TO HUB DRAIN. ASSEMBLY INSTALL PIPING TO PROVIDE THE MAXIMUM POSSIBLE CLEAR HEIGHT 19 3" VENT THROUGH ROOF. S SINK UNDERNEATH WHILE COORDINATING WITH OTHER TRADES. MAINTAIN A 20 4" DOUBLE TWO-WAY CLEANOUT - DETAIL 2/MPD001. URN URINAL MINIMUM OF 6" ABOVE FINISHED CEILING TO PROVIDE CLEARANCE FOR LIGHTING FIXTURES. 21 PROVIDE TAILPIECE TYPE TRAP PRIMER - DETAIL VE SANITARY VENT K. PROVIDE FINAL CONNECTIONS TO EQUIPMENT. 4/MPD001. WHA WATER HAMMER ARRESTER 22 SEE DOMESTIC WATER DIAGRAM 1/MPS001. L. LOCATE VENT TERMINALS A MINIMUM OF 10' HORIZONTALLY FROM ANY DOOR, OPERABLE WINDOW, OR OTHER AIR INTAKE OF THE BUILDING OR ADJACENT 23 SEE SANITARY SEWER RISER DIAGRAM 1/MPS002. BUILDING UNLESS THE VENT TERMINAL IS AT LEAST 2' ABOVE THE TOP OF SUCH OPENING. 24 3" UP TO CLEANOUT -DETAIL 1/MPD001. M. EXTEND ALL VENT LINES VERTICALLY (45 DEGREE ANGLE OR GREATER FROM 25 2" WASTE FROM SINK. HORIZONTAL) TO MINIMUM OF 6" ABOVE THE HIGHEST FLOOR LEVEL RIM OF THE HIGHEST FIXTURE SERVED BY VENT. 26 1" DCW FROM BELOW FLOOR. 27 1" DCW UP THROUGH FLOOR. N. ALL SANITARY SEWER BRANCH LINES SHALL DROP TO THE SAME ELEVATION AS THE SANITARY SEWER MAIN LINES UTILIZING A MAXIMUM SLOPE OF 45 28 NOT USED. DEGREES. 29 NOT USED. O. ALL SANITARY SEWER PIPING SHALL BE SLOPED AT 1/4" PER FOOT MINIMUM. P. SEE ARCHITECTURAL, MECHANICAL, CIVIL, ELECTRICAL AND ROOM FINISH 30 NOT USED. DRAWINGS FOR LOCATION OF EQUIPMENT AND FIXTURES. 31 NOT USED. Q. HANDLE, STORE, AND INSTALL EQUIPMENT ACCORDING TO MANUFACTURER'S 32 NOT USED. INSTRUCTIONS. 33 NOT USED. 34 NOT USED. WASHINGTON STATE ENERGY CODE NOTES FOR PLUMBING 35 NOT USED. APPLICABLE CODES TO PLUMBING WASHINGTON STATE PLUMBING CODE 2021 (UPC 2021 �6:) FLUSH VALVES SCHEDULED AIR TOUCHLESS, HANDLE A. PER C404.3.1 THE MAXIMUM LENGTH OF PIPING OF DOMESTIC HOT WATER FLUSH VALVES ARE SHOWN IN CASE THE OWNER AMMENDED) FROM SOURCE OF HEATED WATER IS 3 FEET FOR 3/8" PIPE SIZE. CHANGES DIRECTION. TYPICAL WC-1 AND UR-1 UNITS. 37 2" VENT THROUGH ROOF. WASHINGTON STATE COMMERCIAL ENERGY CODE 2021 (IECC 2021 AMMENDED) B. PER C404.10.3 INSULATE DOMESTIC HOT WATER PIPING TO TABLE 403.10.3. PIPE SIZE <1", INSULATION THICKNESS 1". INSULATE DOMESTIC COLD WATER 38 3/4" CONDENSATE TRAP CONNECTOR. LINE FROM ACU PIPING WITH 1/2" THICK INSULATION IF <1.5", OTHERWISE 1" THICK INSULATION. EQUIPMENT SYMBOLS IN THIS ROOM. C. PIPE INSULATION SHALL BE CONTINUOUS TP PREVENT THERMAL BRIDGING. C39"\) BACKFLOW PREVENTER IS POWERED FLOOD CONTROL TYPE. IT CLOSES OFF WATER UPON DETECTION OF D. PER C408.1.4 PRIOR TO FINAL PLUMBING INSPECTIONS OR OBTAINING BACKFLOW ACTIVATION. NO BMS. CERTIFICATE OF OCCUPANCY, THE CERTIFIED COMMISSIONING 40 MAINTAIN 24" VERTICAL LIMIT AT FLOOR DRAINS. EQUIPMENT CLEARANCE L PERFESSIONAL SHALL PROVIDE EVIDENCE OF BUILDING COMMISSIONING. R-4332420 FDEVELOPIMENT ENGINEERING o 11 /25/2025 DESIGNED D S LVABY �� Y �I , rat%F WA. Icfr /mow . _ �� � `� z� '� -i' 0676 v' Al°���ISTERF�.�� pS,ON ` 7 �aCO S� BRT General Engineering Consultant F Q w z w Q U J SOUNDTRANSIT NTSE STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 MECHANICAL -PLUMBING GENERAL NOTES AND LEGEND DRAWING NO.: BT120-MPN001 DRAWN BY: D. SILVAN FILENAME: S1-BT120-MP-v2020 FACILITY ID: BT120 CHECKED BY: M. PHILLIPS CONTRACT No.: RTA/CN 0205-24 SHEET No: REV: 0 12/10/2024 DOS MP JHS ISSUED FOR BID APPROVED BY: SUBMITTED BY: DATE: REVIEWED BY: DATE: SUBMITTAL DATE: CORE FACILITY 498 0 No. DATE DSN CHK APP REVISION J. SACKINGER Signed: 12-10-2024 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024