Loading...
HomeMy WebLinkAboutR-4332422N co co W 0 N O N d 75 O N H m U W C� �I Z a ry H 0I d ry C/)I D om OI O co 00 LO � M ao rn al U) L N O O �p o M n m KEY NOTES: )8) 4" HUB DRAIN (8" x 4" REDUCER) WITH ASSE 1072 TRAP PROTECTION DEVICE. ROUTE 3/4" CONDENSATE FROM BT120-ACU-01, 02, 03, 04, AND 05. TERMINATE CONDENSATE PIPING ABOVE HUB DRAIN RIM, MINIMUM 1 INCH AIR GAP. (39) 3" VENT THROUGH ROOF. 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 I I I I I I I I I I — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —I— — — — — — — — — — — — — — — — — 2.H - 1 06/13/2025 1 DOS I MP 0 12/10/2024 1 DOS I MP JHS ADDENDUM #1 JHS ISSUED FOR BID No. I DATE I DSN I CHK I APP I REVISION DESIGNED BY: D. SILVA DRAWN BY: D. SILVA CHECKED BY: M. PHILLIPS APPROVED BY: J. SACKINGER WAS��`�1 Saco b s 7 'mm 'd 3067E �os DNA L Signed: 12-10-2024 SUBMITTED BY: R. PARGAS 4STmRIDE BRT General Engineering Consultant DATE: REVIEWED BY: 12/10/2024 J. ALTCHECH Q w Q cnco W J Z J SOUNDTRANSIT DATE: 12/10/2024 SCALE: 3/16" = 1'-0" FILENAME: S1-BT120-MP-v2020 CONTRACT No.: RTA/CN 0205-24 SUBMITTAL DATE: 12/10/2024 PLATFORM - E IFN nI 1 G H CORE 8 4 0 8 16 FACILITY GEN KEY PLAN SCALE IN FEET DEVELOPMENT ENGINEERING o msippo 11 /25/2025 1 R-4332422 nRA\A/INC; Nvn STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 MECHANICAL -PLUMBING FLOOR PLAN -OVERALL -AT OR ABOVE FINISHED FLOOR CORE FACILITY BT120-MPP221 FACILITY ID: BT120 SHEET No: REV: 500 1